33
|
Thursday, June 21, 2012, 18:13 |
John Wong | NiO | Ta target boat | | Failed | NiO development - Container broke! |
John Wong wrote: |
Nikita Bernier wrote: |
Wednesday, June 20, 2012, 17:23
New Target boat, with no coating, wrapped with a 0.002 inches thick Ta foil, contains NiO D-shape discs :
Sample, # Disks, Mass (g), Thickness (mm)
1 12, 1.9396, 1.938
2 13, 0.9592, 0.847
3 25, 2.6675, 3.06
See John's Ipad for their recipes.
Evaporator #2 is now auto-ramping overnight at 0.5 A/min, up to 580 A, with the maximum voltage limited at 14 V, between 3.00e-05 (Good vacuum) and 4.00e-05 Torr (Bad vacuum).
|
Wednesday, June 20, 2012, 22:28
TGHT tripped off at 78A due to high out-gassing pressure. The current was tapped down to 75A before it was turned back on.
Changed ramping rate from 0.5A/min to 0.2A/min.
Initiate auto-ramping...
Thursday, June 21, 2012, 08:35
Vacuum has come down to 7e-7 as TGHT is being ramped up at 0.2A/min. (see attachment#1).
Increase TGHT rate to 2A/min.
The temperature should be measured when the heater gets up to around 500A.
|
Thursday, June 21, 2012, 17:37
The NiO discs were heated up to 1500C at 560A. The target heater was lowered in steps and the temperature was measured. At 320A, the target container was ~1110C. (see attachment #1)
There was a sign of resistant on the target container as the p/s voltage started to go up at a higher rate. (see attachment#2, 3, 4 for the archived striptool).
Unfortunately, the target container was broken; it was most likely reacted with the Ni. (see attachment#5)
So.... the possible solution?! TRY coating the container with Ta2O5. Will discuss more in the Friday Jun 22 meeting.
|
Attachment 1: NiO_targets_temp.pdf
|
|
Attachment 2: TGHT_0-580A.GIF
|
|
Attachment 3: TGHT_200-580A.GIF
|
|
Attachment 4: TGHT_vs_VOL.GIF
|
|
Attachment 5: NiO_container_broke.png
|
|
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup, PEEK samples installed on heatshield with TC. Pump down over the weekend.
Sunday, April 17, 2022, 10:37 Vacuum 3e-7T, ramp up TGHT 1A/10s to 500A
Sunday, April 17, 2022, 12:00 500A reached, waiting 1hour. TC at 42degC.
Sunday, April 17, 2022, 12:57 after 1h, TC at 45degC. Ramping down 1A/10s. Vacuum 2.7e-6Torr.
Sunday, April 17, 2022, 14:33 ramped down to 0A. Turning off turbo and venting. |
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T . Ramping up 1A/10s to 500A.
Monday, April 25, 2022, 10:05 500A reached, waiting 1h. TC at 50degC
Monday, April 25, 2022, 10:59 TC at 58degC. Ramping down 1A/10s to 0 A.
Monday, April 25, 2022, 13:37 TGHT at 0A , venting system. |
|
543
|
Sunday, March 28, 2021, 11:24 |
Marla Cervantes | | NA (Ta-tube) | | Done | Re-coat 3 | Objective: Coating the inner surface of a tantalum tube to make a destructive test and use a reference for the tantalum boats coatings
Results: The tube was coated
Sunday, March 28, 2021, 11:23
No water leak
IGP1 = 2.3e-7 torr
Sunday, March 28, 2021, 16:10
The wire was heated in the same manner as the last three runs
From 0A to 7A the autoramp was set to 0.5A/min
At 8A the wire started the glow dimmly
Above 8A, the wire was heated manually at 0.5A until 16A where the step was changed to 1A,
the temperature was measured with the filament pyrometer every 2 A starting at 10A
At 42 A the step was changed to 0.6A until 42.6A, 4.38V (2020 °C), the wire was kept at that temperature for 90 min
After that time, the current was ramped down at 0.5A/min until ~20A when the current rampping was changed too 1A/min
|
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
Tuesday, April 13, 2021, 10:17
The wire was heated in the same manner as the last three runs
From 0A to 7A the autoramp was set to 0.5A/min
At 8A the wire started the glow dimmly
Above 8A, the wire was heated manually at 0.5A until 15A where the step was changed to 1A,
the temperature was measured with the filament pyrometer every 2 A starting at 10A
At 42 A the step was changed to 0.5A until 44.5A, 4.61V (2120 °C), the wire was kept at that temperature for 6 hours.
After that time, the current was ramped to 0A at 0.5A/min. |
Attachment 1: voltage-increment-Re-coating.JPG
|
|
|
530
|
Tuesday, February 23, 2021, 08:59 |
Marla Cervantes | | NA (Cu-tube) | | Done | Re coating Test 2 | Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed and when dry it was installed in the EVAP2,
A 1mm thick rhenium wire was held within two copper brackets to pass through a Cu tube with the intention of coating its inside face
Tuesday, February 23, 2021, 08:58 IGP1 = 7.7e-7 Torr
Pressure 5.88e-7 Torr, current rate set to 10 A @ 0.5 A/min
Pressure 6.1e-7 Torr, current rate set to 20 A @ 0.5 A/min
Pressure 8.51e-7 Torr current rate set to 30 A @ 0.5 A/min, temperature corrected 1800 degC (measured with filament pyrometer)
After 10 min the current and voltage are stable and the pressure is going down
Tuesday, February 23, 2021, 16:25
It seems like the wire is touching the tube so the system will be cool down.
Pressure 6.8e-7 Torr current rate set to 0A at -0.1 A/min
Tuesday, February 23, 2021, 17:38
Pressure 6e-7 Torr, TGHT = 23.3 A, 4.854 V, Temp 1788 deg C Omega, 1540 degC filament
current rate set to 0A at 0.2A/min
Wednesday, February 24, 2021, 09:37
Venting EVAP2
Wednesday, February 24, 2021, 16:47
The wire and Cu tube were fix such that the wire's deformation does not lead it to touch the tube, then the assembly was attached again and the EVAP2 was pumped down.
IGP1 = 9.3e-7 Torr, current rate is set to 5 A at 0.5 A/min
Wednesday, February 24, 2021, 17:04
IGP1 = 9e-7 Torr TGHT = 5.175A, 0,749 V
current rate is set to 10 A at 0.5 A/min
Wednesday, February 24, 2021, 17:23
IGP1 = 8.8e-7 Torr, TGHT = 10A, 1.78V
current rate is set to 20 A at 0.5 A/min
Since the wire seemed to be touching the tube, the system was vented.
The tube was shifted and the heat shield installed again, the system was pumped over nigth.
Thursday, February 25, 2021, 09:15
A water leak was performed and no leak was observed
IGP1= 4.95e-7 Torr
Thursday, February 25, 2021, 09:32 The current is increased at 0.5 A/min to 5 A
Thursday, February 25, 2021, 10:00
The current was tapped manually at 0.5 A to 6 A the wire is now glowing dimmly
Current rate set to 10A at .5 A/min
Current rate set to 20 A at 0.5A/min
Current rate set to 30 A at 0.5A/min
Thursday, February 25, 2021, 11:17 IGP1= 5.7e-7 Torr, TGHT=30.5A, 6.718V, filament=1740 degC
voltage and current stable, pressure going down.
Thursday, February 25, 2021, 11:21
Current rate set to 40 A at 0.4 A/min
Thursday, February 25, 2021, 11:53 IGP1 = 5.9e-7 Torr, TGHT = 9.267V, 39.15A, filament = 2060 degC
voltage and current stable, pressure going down.
Current rate set to 50 A @ 0.2A/min
During ramping the voltage reduced a bit and I decided to stop the ramp and reduce the current, the voltage stayed constant but the current started increasing slowly without me inputting it so I decided to ramp down the current at 0.2A/min.
When the current reached 0A the power supplies and the pumps were turned off, after an ~1h when the turbo pump had already stopped, the EVAP2 was vented and open.
The wire sintered to the copper tube confirming that the wire was in contact with the tube during heating.
The Cu tube present a grey metallic coloration indicating a Re coating.
The set up together with the copper heat shield were removed from the |
|
540
|
Thursday, March 25, 2021, 11:24 |
Marla Cervantes | Empty | NA (Cu-Tube | | Done | Re-coat test 4 | Objective: Coating the inner surface of a short tantalum tube with rhenium.
Result:
- The wire snnaped around 376 W (53 A, and 7.09 V) and 2170 °C (measured with filament pyrometer)
- The tube is coated
Thursday, March 25, 2021, 11:23
Yesterday a heat shield was installed in the EVAP2.
The desired temperature of the Re wire is 2500 degC
A water leak was performed (elog 539 describes it), no leak was detected.
Tuesday, March 23, 2021, 11:01
Pressure 3.8e-7 Torr, current rate set to 6 A @ 0.5 A/min
The wire started glowing at TGHT = 4W, 7A, 0.56V
When reaching 7A the current was increased 0.5 A manually
When reaching 16 A, the current was increased 1 A manually until reaching 54 A when the wire snapped |
|
527
|
Tuesday, February 09, 2021, 06:48 |
Aaron Schmidt | | NA | | Done | Ta coating test | Monday, February 08, 2021, 17:00: Installed brackets w/ Ta wire and a small piece of Re to test voltage drop.
Rough down, TP on. Waterlines open.
Tuesday, February 09, 2021, 06:44: Vacuum @ 8.63e-07T.
Tuesday, February 09, 2021, 06:45: Shut TP & roughing pump ff. Valves are close. Ready for power outage.
Tuesday, February 09, 2021, 11:30: BP1 & TP1 back on.
Tuesday, February 09, 2021, 11:37: PS on. Vacuum @ 9.7e-06T & continuing down.
micron slope 0.98
Tuesday, February 09, 2021, 16:01 Pressure 7.26e-7 Torr
aiming at a temperature of 2000 degC on the wire; wire is not in the visual range of pycnometer; simulations of the system indicate that wire will be at 2000 degC at 60 W, hence current will be increased slowly.
Rate: 0.1 A/60 s to 10 A
Tuesday, February 09, 2021, 16:47 Tendence showed that at 5 A the power will be ~10 W, final ramping step was updated accordingly.
Tuesday, February 09, 2021, 16:49 Pressure dropping a bit: Current reading 7e-7 Torr
Tuesday, February 09, 2021, 17:09Pressure going down, curent will be ramped down at 0.2 A/min
Pressure: 6.958e-7 Torr, TGHT: 5 A, 2.748 V, omega is reading 1625 degC somewhere somehow, wire will stay at this conditions for 10 min to see if there is a pressure or voltage change.
Tuesday, February 09, 2021, 17:16 voltage and temperature are slowly increasing 2.789 V, and 1688 degC respectively.
Tuesday, February 09, 2021, 17:32 Voltage signal is noisy but it seems like the voltage is not increasing anymore, preassure has remained constant, wire is glowing, 1100 degC with manual pyrometer.
Tuesday, February 09, 2021, 17:44 TGHT: 2.81 V, 4.95 A, IGP1 6.63e-7 Torr. current will be increased manually at 0.2 A steps. At first step voltage is stable.
Tuesday, February 09, 2021, 18:13 TGHT: 6.6A, 3.981V (~26W), Omega 1741 degC and manual pyrometer ~1300 degC
Tuesday, February 09, 2021, 18:28 TGHT: 8A, 5.121V (~40W), omega 1816 degc, 1390 degC with manual pyrometer, step changed to 0.4A.
Tuesday, February 09, 2021, 18:34 TGHT: 8.8A, 5.88V (50W), omega 2008 degC, 1500 manual pyrometer
Tuesday, February 09, 2021, 18:56 TGHT: 9.6A, 6.64V, manual pyrometer 1800 degC, omega 2042 degC, wire is shinny enough for micron 2092 degC.
Tuesday, February 09, 2021, 19:01TGHT: 10A, 7V, ~1800 degC manual pyrometer, omega 2123 degC, micron 2152 degC
Tuesday, February 09, 2021, 19:15 TGHT: 10.5A, 7.47V, 2150 degC Omega, 2165 degC, ~1800 degC manual
Tuesday, February 09, 2021, 19:23 TGHT: 11A, 7.93 V, 2188 omega, 2210 deC micron
Tuesday, February 09, 2021, 19:29 TGHT: 11.5A, 8.37V, 2188 omega, 2210 deC micron
Tuesday, February 09, 2021, 19:33 TGHT: 12A, 9V, 2325 degC, 1900 degC manual, the wire changed shape and the preassure increase a bit , micron was readjusted to read, micron 2454 degC. Wire might be touching tube, only one more amper will be imputed.
Tuesday, February 09, 2021, 19:55 TGHT 13A, 9.865 V, 2404 degC omega , 2558 degC micron, manual pyrometer still reads 1800 degC, pressure increased with the power increment, bbut it seems like the wire touching the tube so no more current will be imputed.
Tuesday, February 09, 2021, 20:08 started ramping at -0.2A/min
Wednesday, February 10th , 20211, 10:00 System unloaded from EVAP2, wire has straightened, it has not sintered to the copper brackets, system is clean there is no evidence of coating. |
|
528
|
Thursday, February 11, 2021, 10:57 |
Marla Cervantes | | NA | | Done | Re coating Test 1 | Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate it and deposit a layer of Re on the inner surface of a Ta tube.
A Re wire of 1mm diameter was clamped with Cu brackets in EVAP2, the wire is partially enclosed in a Ta tube. EVAP2 pumping down
The wire needs to be heated to 2500 degC since this is its sublimation temperature at 8e-7 Torr
There is not a reliable system to measure the temperature of the wire but the readings of the micron, manual, and omega pyrometers will be register.
According to COMSOL simulations a power and taking in consideration the EVAP2's power loss, a power of 520 W (5A, 10V) is required.
Thursday, February 11, 2021, 15:39
Pressure 3.78e-7 Torr, current rate set to 10 A @ 0.5 A/min
Thursday, February 11, 2021, 16:32
Pressure: 4.01e-7 Torr, TGHT = 10A, 1.719 V. The voltage has stabilized, the wire is glowing but not enough for reading with micron nor omega, manual reads 970 degC. Also, the wire formed an arc (crest).
Thursday, February 11, 2021, 16:44
Pressure 3.8e-7 Torr, TGHT = 10 A, 1.723 V ramp set to 20A @ 0.2 A/min
Thursday, February 11, 2021, 17:26
Pressure increasing 4.7e-7 torr, TGHT = 20 A, 4.016 V, the wire does not seem to be changing,
Thursday, February 11, 2021, 18:02
Ramp set to 30A @0.4A/min
Pressure 7.2e-7 Torr, TGHT = 30A, 6.561V, manual pyrometer reads 1720degC
Ramp set to 40A @0.4A/min
Thursday, February 11, 2021, 18:35
Pressure 2.1e-6Torr and increasing, TGHT = 40A, 9.1V, manual pyrometer reads ~1880 degC
Ramp set to 50A @ 0.4 A/min
|
|
59
|
Monday, March 04, 2013, 17:41 |
John Wong | Empty | LP-SIS RFQ ver 2.0 | | | Testing LPSIS RFQ ver 2.0 | Monday, March 04, 2013, 17:39
This is the 2nd modified target container for RFQ LPSIS. The container will be heated up to 650A TGHT and 150A on TBHT. No Ta-heat shield is being used.
Heating rate at 1A/min for both TGHT & TBHT. Once the target is at the currents, TBHT will be further ramped up to 300A.
Temperatures are being measured by two thermocouples (one on RFQ component and the other on the Cu heat-shield).
Gases are being analyzed using the RGA.
|
|
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and 2 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
2 end caps had slight damage and were disposed of. 12 good caps and 2 good springs. |
|
449
|
Monday, June 17, 2019, 17:09 |
Marla Cervantes | | 49044-9 | LP-SIS | Done | Target container calibration/conditioning | Monday, June 17, 2019, 17:04
A LP-SIS target container was wrapped with 3 heat shielding layers,
and an empty graphite insert of 17.4 g was introduce in it.
The system was loaded in the EVAP2 and the chamber is currently being evacuated.
The container will be heated to 2000 C in order to correlate the temperature, current and voltage,
as well as to condition the container.
Tuesday, June 18, 2019, 07:28
The TGHT and TBHT current will be tapped to 40 A manually
Autoramp will be set to TGHT 1A/min to 500 A
and TBHT 0.5A/min to 230 A.
Tuesday, June 18, 2019, 20:51
After 2 hours at ~1800 C the container was cooled,
IGP1 = 1.2e-6 Torr
TGHT = 7.16 V, 447.094 A
TBHT = 4.19 V, 233.43 A
Temperature 1793 C
Auto ramp TGHT = -2 A/min, TBHT = -1A/min |
|
641
|
Thursday, August 24, 2023, 14:18 |
Aaron Schmidt | Nb | 45447-9 | LP-IG-LIS | In progress | Conditioning Nb#11 | Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Target density = 7.13 g/cm3
Target length = 3.53 cm
Total Mass = 25.165 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 434 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Final desired temperature = 1900C.
Replacement for Nb#10
Thursday, August 24, 2023, 14:16: Roughing.
OMEGA slope = 0.98.
Thursday, August 24, 2023, 14:31: Turbo pump started.
Thursday, August 24, 2023, 14:41: TGHT / TBHT PS on. Manually test @ 5 / 5 A. ok. Tap back to 0 A.
Thursday, August 24, 2023, 18:26: Vacuum @ 4.35e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Thursday, August 24, 2023, 22:00: TGHT / TBHT @ 414 / 230 A (406 / 233 A - Offset). Auto-ramping TGHT to 580 A @ 2 A per min continued. Temperature @ 1353 C. Vacuum @ 4.03e-06T.
Thursday, August 24, 2023, 23:29: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Auto-ramping TGHT to 610 A @ 2 A per min (approx 600 A w/ offset). Temperature @ 1708 C. Vacuum @ 6.61e-06T.
Thursday, August 24, 2023, 23:49: TGHT / TBHT @ 610 / 230 A (598 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (620 A w/ offset). Temperature @ 1765 C. Vacuum @ 7.22e-06T.
Friday, August 25, 2023, 00:04: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1808 C. Vacuum @ 7.54e-06T.
Friday, August 25, 2023, 00:16: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 670 A @ 2 A per min (660 A w/ offset). Temperature @ 1845 C. Vacuum @ 7.72e-06T.
Friday, August 25, 2023, 00:27: TGHT / TBHT @ 670 / 230 A (657 / 233 A). Auto-ramping TGHT to 680 A @ 2 A per min (668 A w/ offset). Temperature @ 1880 C. Vacuum @ 8.46e-06T.
Manually tap up to temperature.
Friday, August 25, 2023, 00:34: TGHT / TBHT @ 682 / 230 A (669 / 233 A). Temperature @ 1900-1901 C. Vacuum @ 8.59e-06T. Desired Temperature Reached.
Friday, August 25, 2023, 00:37: Auto-cooling @ 2 A per min.
Friday, August 25, 2023, 06:15:
Friday, August 25, 2023, 07:40: PS & TP off.
|
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | Ta | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =3.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 1A/min on TGHT 100A and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
note: Left TBHT hole is off from center by a good margin
Sunday, September 01, 2024, 07:32
Starting initial ramp at 1A/min to 50A
Sunday, September 01, 2024, 15:20
have ramped ;up at 1A/min on both TGHT and TBHT but had two issues.
1) Set current and readback current have discrepancies but the TBHT discrepancy is significant (TBHT Set at 188 while RD is 231.9 A @ 1.9V)
TGHT also has odd behavior with set point 405 giving 392A RD and 0.067V. Will hold until 430pm before starting ramp down
Sunday, September 01, 2024, 16:30
Started rampdown at -2A/min TGHT and -1A/min TBHT
Note: OMEGA not able to give any reasonable readings
Tuesday, September 03, 2024, 13:51
After troubleshooting EVAP2 it was found that a copper line was touching the metal encasement grid most likely resulting in a short. A short was seeing and it disappeared after moving the copper line away from the grid.
Upon restarting on epics the PS went to maximum current and it was shut off after 30seconds to a minute. The system was checked again by Arthur and TGHT was manually increased to 5A and then set to Zero again. Arthur thinks that the PS probably requires this step after switching from local controls to remote. Will start the sintering again as the container is coated but not sintered.
Tuesday, September 03, 2024, 14:03
ramping at 1A/min on both TGHT and TBHT to 90A.
Tuesday, September 03, 2024, 22:25
Started rampdown at -2A/min TGHT and -1A/min TBHT. HIgh temperature from OMEGA was 1825 C at 430A readback on TGHT. |
|
638
|
Wednesday, June 21, 2023, 10:37 |
Aaron Schmidt | Nb | 45447-7 | LP-IG-LIS | In progress | Conditioning Nb#10 | Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Target density = 7.36 g/cm3
Target length = 3.5 cm
Total Mass = 25.7576 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 438 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Wednesday, June 21, 2023, 10:37: Roughing.
Wednesday, June 21, 2023, 13:39: TP1 on.
Wednesday, June 21, 2023, 13:55: TGHT / TBHT PS on. Vacuum @ 3.35e-05T
Thursday, June 22, 2023, 13:16: TGHT / TBHT Manually set to 5 / 5 A. Vacuum @ 8.17e-07T.
Final desired temperature = 1900C.
Thursday, June 22, 2023, 13:49: OMEGA slope = 0.98.
Friday, June 23, 2023, 06:24: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Friday, June 23, 2023, 12:11: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 610 A @ 2 A per min (600 A w/ offset). Temperature @ 1697 C. Vacuum @ 3.38e-06T.
Friday, June 23, 2023, 12:32: TGHT / TBHT @ 610 / 230 A (600 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (620 A w/ offset). Temperature @ 1748 C. Vacuum @ 4.61e-06T.
Friday, June 23, 2023, 12:44: TGHT / TBHT @ 630 / 230 A (617 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1790 C. Vacuum @ 5.74e-06T.
Friday, June 23, 2023, 13:07: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 670 A @ 2 A per min (660 A w/ offset). Temperature @ 1825 C. Vacuum @ 5.90e-06T.
Friday, June 23, 2023, 13:22: TGHT / TBHT @ 670 / 230 A (658 / 233 A). Auto-ramping TGHT to 680 A @ 2 A per min (668 A w/ offset). Temperature @ 1858 C. Vacuum @ 6.75e-06T.
Friday, June 23, 2023, 13:29: TGHT / TBHT @ 680 / 230 A (667 / 233 A). Auto-ramping TGHT to 690 A @ 2 A per min (677 A w/ offset). Temperature @ 1877 C. Vacuum @ 6.99e-06T.
Friday, June 23, 2023, 13:37: Manually tap up to temperature.
Friday, June 23, 2023, 13:38: Vacuum @ 7.54e-06T. TGHT / TBHT @ 694 / 230 A (680.5 / 233 A direct w/ offset). Temperature @ 1901-1902 C. Desired Temperature Reached.
Friday, June 23, 2023, 13:42: Auto-cooling @ 2 A per min. |
|
644
|
Thursday, August 31, 2023, 07:09 |
Darwin Ortiz Rosales | TaC | 45447-4 | HP-FEBIAD | Done | TaC coating sintering | Thursday, August 31, 2023, 07:07
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 7.7e-07 Torr
Thursday, August 31, 2023, 12:29
OMEGA=1238 C
IGP1=1.4e-06 Torr
Continue ramp
ramp @ 4A/min (2A/30s)
Thursday, August 31, 2023, 12:50
IGP1= 2.23e-06 Torr
OMEGA=1392 C
Thursday, August 31, 2023, 13:04
IGP1=2.7e-06 Torr
OMEGA=1443 C
Thursday, August 31, 2023, 13:18
IGP1= 3.8e-06 Torr
OMEGA=1537 C
Thursday, August 31, 2023, 14:38
OMEGA=1852C |
|
650
|
Wednesday, December 06, 2023, 09:57 |
Darwin Ortiz Rosales | SiC | 45447-4 | HP-FEBIAD | Done | 231204SiC conditioning | Wednesday, December 06, 2023, 09:47
Target number of foils:370
Analysis discs 16 A and 16B interspersed on the end further from the laser
A are discs produced using new method and B are discs produced using milling.
Total length packed 16 cm (excluding the analysis discs)
container has 3 Ta heat shields (one inner around fins and center block, new type of 1st shield made up of three pieces)
No endcaps inserted to facilitate out-gassing
Ta coated spring at front end
ramp to 120A @ 1A/min TGHT and to 120A on TBHT hold there until pressure drop, then ramp to 500A on TGHT and 230A TBHT.
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 5.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 1e-06 Torr at start of initial ramp.
Wednesday, December 06, 2023, 09:56
System left to drop pressure over previous night and now at 120A. waiting for pressure drop.
Wednesday, December 06, 2023, 11:18
increased ramp rate to 2A/min
Wednesday, December 06, 2023, 14:41
increased ramp to 3A/min on TGHT and stopping to allow pressure to stabilize before taking temperature readings
Top temperature 1800C at 710 A but started dropping. Increased current to 750A and left there for 4 hours.
Cool down at -2A/min TGHT and -1A/min TBHT
|
|
659
|
Friday, April 26, 2024, 06:19 |
Darwin Ortiz Rosales | TaC | 45447-29 | HP-SIS | Done | TaC coating sintering |
Monday, April 29, 2024, 19:50
Started coating with coating stand.
The coated container was wrapped in 3 Ta foil heatshields.
Vacuum IGP1 initial =9.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 2A/min to =700 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, April 29, 2024, 20:25
Reached 1810 @700A
Will leave until 1230am |
|
665
|
Monday, July 22, 2024, 14:59 |
Aaron Schmidt | Ta | 45447-14 | LP-SIS | In progress | Conditioning Ta#67 Thin foil | Ta#67 Thin foil LP-SIS target description:
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Foil Thickness = 0.010mm (0.0004") avg Measured.
Target material batch: https://elog.triumf.ca/TIS/Target+Production/143
Target density = 4.498 g/cm3
Target length = 3.7465 cm
Total Mass = 16.8509 g [Incl foils + Ta wire on 2 packs]
Total mass w/ Target oven = 415g (No end caps)
Discs in target are arranged as follows: 2packs
Dimpling direction on foils/ Packs. --> Center <--
No Ta foil heat shield added
Monday, July 22, 2024, 14:53: Roughing.
Halt roughing. Install heat plates.
Monday, July 22, 2024, 15:06: Roughing.
Monday, July 22, 2024, 15:26: TP On.
Monday, July 22, 2024, 15:34: TP Timeout. Restart.
Monday, July 22, 2024, 15:35: TP at speed (Green)
Monday, July 22, 2024, 15:36: PS On. TGHT / TBHT to 5/5 A manually. OK. Tap down.
Tuesday, July 23, 2024, 07:03: Auto-ramping TGHT / TBHT to 120 / 60 A @ 2 A per min. Desired temperature 1900 C.
Tuesday, July 23, 2024, 08:02: OMEGA IR2C Laser off. Slope set to 0.98.
Tuesday, July 23, 2024, 08:06: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Tuesday, July 23, 2024, 09:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Temperature @ 1022 C.
Tuesday, July 23, 2024, 11:59: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Temperature @ 1538 C.
Tuesday, July 23, 2024, 12:46: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Temperature @ 1710 C. Vacuum @ 7.44e-06T.
Tuesday, July 23, 2024, 14:23: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 620 A @ 2 A per min. Temperature @ 1721 C. Vacuum @ 5.06e-06T.
Tuesday, July 23, 2024, 14:48: TGHT / TBHT @ 620 / 230 A 609 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min. Temperature @ 1799 C. Vacuum @ 6.76e-06T.
Tuesday, July 23, 2024, 14:56: TGHT / TBHT @ 630 / 230 A 618 / 233 A). Temperature @ 1816 C. Vacuum @ 7.14e-06T. Tapping up manually TGHT to get to 1900degC
Tuesday, July 23, 2024, 15:23: TGHT / TBHT @ 670 / 230 A 657 / 233 A). Temperature @ 1890 C. Vacuum @ 9.94e-06T. Stopping and waiting for 5min.
Tuesday, July 23, 2024, 15:39: Target ramp down 2A/min to 0 both TGHT and TBHT.
Wednesday, July 24, 2024, 08:50: TP off.
Wednesday, July 24, 2024, 09:18: Venting.
Wednesday, July 24, 2024, 10:28: Target removed. EVAP2 clear. |
|
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating ramp manually to 50A on TGHT and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Saturday, September 07, 2024, 17:38
At 400 A set point on TGHT, read back is 392A and OMEGA reads 1840C. TBHT set to 230A reads 233A.
It will be kept at this current for four hours before rampdown. |
|