ID Datedown Author Target Material Target Oven W.O# Source Status Subject
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned

 Monday, February 13, 2012, 16:21

The Evaporator 2 is now commissioned.  See attachment#1 for the commissioning report or refer to Document #43321.  

Attachment 1: Evap2_Commissioning_Report.PDF
Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance 
Rick mentioned to me that the evaporator is ready for the next steps of the commissioning process.
In the chamber only the target leg heaters have current by-pass clamps on them. 
The ionizer tube heaters do not have them because these lines do not have the same configuration as the others. The current by-pass clamps will 
not fit these lines.

We may not need this for the commissioning, Rick will design and manufacture something  for this when I get back from holiday.

The water is on in all circuits except for the power supply cooling circuit.

Pierre
  1   Monday, March 28, 2011, 12:40 John Wong    Under Construction

Evaporator #2 is still under construction.  For further information please contact Jens Lassen.