  690   Friday, April 11, 2025, 10:44 Darwin Ortiz RosalesTiCTiC250304LP TUBEIn progressTiC  
Friday, April 11, 2025, 06:18
 
  
  626   Wednesday, April 26, 2023, 18:20 Carla BabcockTiC44692-5LP-FEBIADIn progressTiC230425


   
        
            
  
  629   Thursday, April 27, 2023, 21:48 Carla BabcockTiC44692-5LP-FEBIADIn progressTiC230425


   
        
            
 MicrosoftTeams-image_(36).png 
  130   Thursday, May 29, 2014, 18:16 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingPurpose: Sinter one sample of each of TiC,
VC, Cr3C2, ZrC, NbC, Mo2C, TaC, and WC on
5x10 mm tantalum foil to see if the samples
 01-samples.jpg 
  131   Friday, May 30, 2014, 13:15 Cameron Hodgins   In progressSintering several carbides on tantalum foil backing Pressure down to 7.1e-7 Torr. Water
valve to heat shield was opened; pressure
remained stable. 
  
  132   Friday, June 06, 2014, 16:01 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingAuto-ramp started. Max current = 500 A,
voltage = 11.05 V. Current is being increased
at 2 A/min. In the first 20 minutes, the
  
  133   Monday, June 09, 2014, 13:56 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingManually changed current from 500 to 615
A, monitoring the temperature. Temperature
went from 1657 C up to 1838 C. Pressure increased
  
  134   Monday, June 09, 2014, 17:15 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backing Target boat is now being cooled at
1 A/min from the starting point (616 A) down
to 0 A. 
  
  268   Thursday, January 07, 2016, 09:19 Aurelia LaxdalTa41369-5HP-SISIn progressTemperature measurementsTemperature measurements in progress this
week for Ta HP-SIS.
See attachment for the current settings
 Jan_9_and_10_2016_measurements.docx 
  279   Sunday, March 13, 2016, 14:58 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning Started Ta#47 heating at Evap2 using the
autoramp program. The TGHT current is setup
to go to 300A (for now) and the TBHT to 230A
  
  282   Monday, March 14, 2016, 19:22 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  283   Friday, March 18, 2016, 17:13 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  284   Monday, March 21, 2016, 18:57 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  285   Tuesday, March 22, 2016, 11:31 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  332   Saturday, October 15, 2016, 12:42 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  333   Sunday, October 16, 2016, 17:55 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  666   Thursday, July 25, 2024, 15:46 Angelina Chennp-Ta TARGET BOATDoneCarbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) Thursday, July 25, 2024, 15:18
Target container consists of two
np-Ta fibres disk samples. Both disks are
  
  55   Friday, January 11, 2013, 15:16 Anders Mjos   MaintenanceReplace terminal insulator

    

       
            
 ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg 
  60   Wednesday, March 06, 2013, 10:41 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal testWednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing
 CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf 
  62   Monday, March 11, 2013, 12:23 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 2 

    
 2013-03-11_Evap2_Second_Thermal_Test.pdf 