283
|
Friday, March 18, 2016, 17:13 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
284
|
Monday, March 21, 2016, 18:57 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
285
|
Tuesday, March 22, 2016, 11:31 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
332
|
Saturday, October 15, 2016, 12:42 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
333
|
Sunday, October 16, 2016, 17:55 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
666
|
Thursday, July 25, 2024, 15:46 |
Angelina Chen | np-Ta | | TARGET BOAT | In progress | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) | Thursday, July 25, 2024, 15:18
Target container consists of two
np-Ta fibres disk samples. Both disks are |
|
55
|
Friday, January 11, 2013, 15:16 |
Anders Mjos | | | | Maintenance | Replace terminal insulator |
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing |
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached
PDF for photos) |
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated
to 580A / 300A |
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified. |
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
|
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter |
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
|
|
96
|
Thursday, November 07, 2013, 09:38 |
Anders Mjos | | | | Problems resolved | Heat Shield cooling line twisted | See attached photo.
The Heat Shield has been taken to
the Machine Shop for repair. |
|
120
|
Friday, March 07, 2014, 10:34 |
Anders Mjos | | | | Problems resolved | TGHT2 water flow signal | There was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be |
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
|
|