Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 30 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  595   Tuesday, October 18, 2022, 13:59 Hannah ToyTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2
  
  596   Wednesday, October 19, 2022, 09:50 John WongTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC


   
        
            
 Screenshot_2022-10-19_102257.pngScreenshot_2022-10-19_120146.pngScreenshot_2022-10-19_195305.pngScreenshot_2022-10-21_085223.png 
  597   Tuesday, October 25, 2022, 12:25 Darwin Ortiz RosalesTaC44139-15-SKLP-SISDoneTaC coating sinteringTuesday, October 25, 2022, 12:18
Container wrapped in 4 Ta foil heatshields
Target temperature on OMEGA= 1850-1900
  
  598   Friday, October 28, 2022, 07:59 Darwin Ortiz RosalesTaC45220-6LP-SISDoneTaC coating sinteringFriday, October 28, 2022, 07:58
The coated container was wrapped
in four Ta foil heatshields.
  
  599   Tuesday, November 01, 2022, 17:35 John WongTiC TARGET BOATDoneNp-TiC fibres systhesisTuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner.  Each
 TiO2_C_fibres_carbonization_elog599.png 
  600   Monday, November 07, 2022, 14:26 Darwin Ortiz RosalesTaC44139-4TARGET BOATDoneTaC coating sinteringMonday, November 07, 2022, 14:24
The coated container tube was wrapped
in four Ta foil heatshields.
  
  601   Thursday, November 10, 2022, 07:40 Darwin Ortiz RosalesTaC45220-13LP-SISDoneTaC coating sinteringThursday, November 10, 2022, 07:40
The coated container was wrapped
in four Ta foil heatshields.
  
  602   Thursday, November 17, 2022, 08:14 Darwin Ortiz RosalesTaC44692-12TARGET BOATDoneTaC coating sinteringThursday, November 17, 2022, 08:11
The coated container was wrapped
in four Ta foil heatshields.
  
  603   Friday, November 18, 2022, 15:13 Darwin Ortiz RosalesTaC45220-1LP-SISDoneTaC coating sinteringFriday, November 18, 2022, 15:08
The coated container was wrapped
in four Ta foil heatshields.
  
  604   Tuesday, November 22, 2022, 14:59 Darwin Ortiz RosalesTaC45220-12LP-SISDoneTaC coating sinteringTuesday, November 22, 2022, 14:58
The coated container was wrapped
in four Ta foil heatshields.
  
  605   Thursday, November 24, 2022, 11:08 John WongTiC TARGET BOATDoneSynthesis of TiC fibrous disc (TiO2/PAN only)Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample
 striptool_1600C.jpgstriptool_1887C.jpg 
  606   Friday, December 02, 2022, 09:50 Darwin Ortiz Rosales 45220-12TARGET BOATDoneGrahite disc conditioning 221130-GraphiteFriday, December 02, 2022, 09:46
297 graphite discs packed into a
Ta tube wrapped in four heatshields.
  
  607   Friday, December 16, 2022, 10:03 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering4 TaC coated springs and 4 Tac coated caps
loaded into a target boat.
Target boat wrapped in 4 Ta heatshields
  
  608   Thursday, February 09, 2023, 09:49 Darwin Ortiz RosalesNb TARGET BOATDonecondition Nb samples (Phillip)Thursday, February 09, 2023, 09:47
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb
  
  609   Thursday, February 23, 2023, 18:24 Darwin Ortiz RosalesTaC45441-2HP-FEBIADDoneTaC coating sinteringThursday, February 23, 2023, 18:20
Ta HP-FEBIAD was coated
 WO_45441-2.png 
  610   Tuesday, February 28, 2023, 07:21 Darwin Ortiz RosalesTa44692-7LP-FEBIADDoneTaC coating sinteringTuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated
  
  611   Wednesday, March 01, 2023, 21:49 Darwin Ortiz RosalesTa44692-3HP-SISDoneTaC coating sinteringWednesday, March 01, 2023, 21:46
Ta HP-SIS was coated
  
  612   Saturday, March 04, 2023, 08:34 Darwin Ortiz RosalesTiC44692-7LP-FEBIADDoneTiC230301 conditioningSaturday, March 04, 2023, 08:29
  
  613   Monday, March 06, 2023, 21:34 Darwin Ortiz RosalesSiC44692-3HP-SISDone230306SiC conditioningMonday, March 06, 2023, 21:29
Total number of foils:382
  
  614   Thursday, March 09, 2023, 06:58 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coated endcaps and spring sinteringThursday,
March 09, 2023, 06:53
2 TaC coated springs and  12
  
ELOG V2.9.2-2455