Monday, September 28, 2020, 09:36, John Wong, Nb, , TARGET BOAT, Done, Heat Treatment of Nb for Edward
|
Darwin Ortiz Rosales wrote: |
Friday, September 25, 2020, 10:30
Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400 C for 4 hrs.
OMEGA slope = 0.99
The niobium samples are wrapped in two layers of Nb foil.
Boat is wrapped with 2 layers of Ta foil, careful to avoid touching samples.
Friday, September 25, 2020, 10:35
Manually ramped TGHT to 40 A and kept at that current for approximately 15 minutes.
Then started autoramp at 1A/min up to 100 A
Friday, September 25, 2020, 16:58
IPG1= 4.7e-07 Torr
TGHT =100.0 A, 1.3 V
Start autoramp to TGHT to 300 A @ 2A/min
@ 300A temperature = 1179 C
Friday, September 25, 2020, 20:00
autoramp to 345 A
Friday, September 25, 2020, 20:39
TGHT = 345 A, 5.4 V
OMEGA = 1296 C
IPG1= 8.1 e-07 Torr
Ramp manually to 1400 C
Friday, September 25, 2020, 20:51
reached 1400 C on OMEGA at TGHT = 476 A
Friday, September 25, 2020, 20:59
OMEGA increased to 1410, lowered TGHT to 468 A to get back to 1400 C on OMEGA
Friday, September 25, 2020, 21:40
Lowered TGHT to 463 A, 5.79 V to bring OMEGA to 1400 C from 1404 C
Saturday, September 26, 2020, 00:51
Sample has been at 1400 C for 4 hours.
IGP1= 7.2 e-07 Torr
Cooling at- 2A/min
|
Monday, September 28, 2020, 09:36
Vented chamber - for Darwin.
|
Thursday, November 07, 2013, 09:38, Anders Mjos, , , , Problems resolved, Heat Shield cooling line twisted 
|
See attached photo.
The Heat Shield has been taken to the Machine Shop for repair.
Friday, November 08, 2013
The Heat Shield cooling line has been repaired and the lid re-installed in the evaporator. Photo attached.
Friday, November 08, 2013, 10:58 : Roughing Started
Friday, November 08, 2013, 11:05: Turbo started
Friday, November 08, 2013, 11:15: Turbo at speed Vacuum at (IGP1) 5.7E-5 T |
Tuesday, May 21, 2019, 14:34, Aaron Schmidt, , , , , HS swap to EVAP 2 flex line.
|
Tuesday, May 21, 2019, 14:33: Install flexible line evap 2 HS. |
Wednesday, April 25, 2018, 07:21, Aaron Schmidt, , , , Done, HS swap evap 2
|
Wednesday, April 25, 2018, 07:05: TGHT & TBHT off
Wednesday, April 25, 2018, 07:15: BV1 & TP1 off
Wednesday, April 25, 2018, 07:17: PV1 & BP1off
Wednesday, April 25, 2018, 07:19: Begin venting
Wednesday, April 25, 2018, 07:22: Full venting.
Wednesday, April 25, 2018, 07:29: HS waterlines purged.
Wednesday, April 25, 2018, 07:48: Aurelia's test ta target assembly was removed. The blank target heating heat shield for evap 2 was reinstalled. shields in but empty.
Evap 2 Doors closed. |
Thursday, September 26, 2019, 14:03, Aaron Schmidt, Nb, 41882-3, TARGET BOAT, In progress, HS swap & test Nb target
|
HS# 42752-7
Thursday, September 26, 2019, 13:46: Remove Flexible lines HS
Thursday, September 26, 2019, 14:03: Assy installed.
Friday, September 27, 2019, 07:07: Vacuum @ 1.16e-06T.
Friday, September 27, 2019, 07:09: Waterlines opened. Vacuum stable @ 1.15e-06T
Monday, September 30, 2019, 10:04: Remove Nb target & assy. Install flexible line HS. |
Friday, October 16, 2020, 16:31, Luca Egoriti, Empty, , TARGET BOAT, In progress, HPOG annealing
|
Friday, October 16, 2020, 11:30
Target mounted in EVAP2. Pump down started
Friday, October 16, 2020, 12:05
Pressure goes up. Checked with Ferran and he says that the valve IEVAP2:RV1 automatically closes sometimes. WEIRD, to be chacked.

Friday, October 16, 2020, 15:20
IGP2 bottoms at 0.2T, and doesn't increase recover if I close RV1 while it shouldn't (as shown before). --> Vented to restart from scratch
Friday, October 16, 2020, 15:45
Pumped down again, vacuum went down to 0.16 and then started raising until ~0.18. This time the valve was open indeed! opening and closing the valve had no effect on the vacuum as if the booster pump was not effective

Friday, October 16, 2020, 16:27
Tried a THIRD time, this time effectively, to turn the turbo ON. I managed to, but the turbo makes weird spinning sounds every ~30 sec. Moreover, its pumping down plot seems quite weird - see spike UP while pumping. Could it be related to a dysfunction of the backing pump?

|
Monday, November 02, 2020, 18:32, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, HEA heat treatment 
|
2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while, IGP1:1.8e-5T . water leak check ok.
2020-11-02 7:47: IGP1:1e-5T . Ramping up target heater to 200A, 1A/10s.
2020-11-02 7:47: TGHT at 275A, pyrometer at 1300degC. Leaving it hot for 24h.
2020-11-04 9:06: After 37h treatment, ramping down to 0A.2A/10s.
2020-11-04 9:46: target ramped down. Venting.
2020-11-04 17:30: Big amounts of outgassing non detected in GP1 coated some inner walls in evap2. The walls got cleaned with acetone. All as before now.
 |
Tuesday, June 06, 2023, 09:14, Darwin Ortiz Rosales, C, 44139-4, TARGET BOAT, Done, Graphite inside insert Experiment 2 (regular formulation discs)
|
Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with 4 Ta heatshields. Note final container is 45220-6
272 graphite discs were loaded.
a TaC coated Ta spring at the front end.
The system was left to establish vacuum over previous night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including spring= 253.94 g
OMEGA slope = 0.99
The target will be heated to ~2000 C, held there for 10 hours.
Initial ramp at 1A/min to 200A
Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.
At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 480A. Will use read back current
Will hold at target Temperature or Current for 10 hours before starting ramp-down.
Tuesday, June 06, 2023, 09:14
Starting ramt at 1A/min
initial IGP1= 8.2e-07
Tuesday, June 06, 2023, 21:25
@480 A on readback, 1823C on OMEGA. ramping to 510A set point which should be around 490 RD. (see heating profile for details)
Tuesday, June 06, 2023, 22:02
ramped to 516 on RD 527 on set. Will leave for 10 hours
OMEGA =1930 C
Wednesday, June 07, 2023, 06:32
OMEGA at 1950 C this morning. Will continue heating. Lowered to 1940 C as in experiment 1 this was the top temperature.
Wednesday, June 07, 2023, 07:40
OMEGA= 1940 C
IGP1=1.7-6 Torr
TGHT= 513A, 9.4V
starting ramp down at -2A/min |
Wednesday, May 24, 2023, 15:23, Darwin Ortiz Rosales, , 44139-4, LP TUBE, Done, Graphite inside insert Experiment 1
|
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with 4 Ta heatshields. Note final container is 45220-11
219 graphite discs were loaded.
a TaC coated Ta spring at the front end.
The system was left to establish vacuum over previous night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including spring= 250.1 g
OMEGA slope = 0.99
The target will be heated to 2000 C, held there for 10 hours.
Initial ramp at 1A/min to 200A
Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.
At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 450A.
Will hold at target Temperature or Current for 10 hours before starting ramp-down.
Wednesday, May 24, 2023, 15:50
Currently heating at 0.5A/min to250A. Taking temperature/current measurements
IGP1= 1.06e-06 Torr
Wednesday, May 24, 2023, 18:28
heating at 1A/min to 275A to collect more temperature data
Wednesday, May 24, 2023, 19:22
Slight offset between set and RD current observed.
Ramping at 1A/min to 440A according to the regression below

Should be around 2000 C.
Wednesday, May 24, 2023, 20:22
Currently at 339 A, 4.8V
OMEGA = 1614 C, IGP1= 2.04e-06 Torr
Will ramp up at 2A/min to 450A as new data point suggests

Wednesday, May 24, 2023, 21:05
heating curve has new slope suggesting 500A as minimum to reach 2000 C
Increasing ramp to 1A/10s to reach 450A
Wednesday, May 24, 2023, 21:17
TGHT
IGP1= 3.9e-06 Torr
Continue ramping to 480A

Wednesday, May 24, 2023, 22:11
Offset between setpoint of current and readback. readback 10A below.
Will keep at this setting until 7:30 am tomorrow then start ramp down @-2A/min
Thursday, May 25, 2023, 07:25
OMEGA=1912C, IGP1 =1.29e-06 Torr, TGHT = 480A, 9.0V
begin ramp down at -2A/min
Thursday, May 25, 2023, 09:52
Some odd current readback behaeviour noticed. Have contacted Gelo from controls. He will look at it next week. Discrepancy between read back and set point and drop in read back currrent. See picture
|
Wednesday, February 13, 2019, 10:08, Darwin Ortiz Rosales, , 43630-1 , , Done, Graphite insert test 3b
|
Wednesday, February 13, 2019, 10:04
A previously coated tantalum tube with 3 layers of shielding (Details in e-log 426) was loaded with a graphite insert.
The tube was loaded in evaporator 2 and pumped down
The graphite insert will be heated to 2000 C for 1 week
IGP1=1.37e-07 Torr
Wednesday, February 13, 2019, 10:27
IGP1= 1.46e-07 Torr
Manual tapping to 40A on TGHT
TGHT 40.7A, 0.104V
Autoramp started at 1A/min up to 400 A
Good Vacuum = 3.00e-05, Bad Vacuum = 5.00e-05
Thursday, February 14, 2019, 08:42
IGP1= 2.2e-07 Torr, T=1705 C, TGHT 401A, 6.7 V
Manually tapping to 2000 C (Slow ~1 A/min) in 5 A increments followed by waiting for equillibrium
Thursday, February 14, 2019, 10:54
IGP1 = 1.4e-06 Torr, T = 2003 C, TGHT 500A, 9.1 V
Waiting for equillibrium
manually tapped TGHT to 503A, T = 2003 C
Will leave for 1 week
Wednesday, February 20, 2019, 08:44
IGP1= 1.37e-07 Torr, T=1943 C, THGT= 503 A, 8.9 V
Ramp-down @ 2A/min
Wednesday, February 20, 2019, 14:02
1 hour since TGHT = 0 A
Venting will proceed.
|
Sunday, April 07, 2019, 08:13, Marla Cervantes, , 43630-5, , Done, Graphite insert test #5   
|
Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps) was loaded in tantalum tube previously coated with TaC,
and wrapped with 3 tantalum foils,
a tanalum cap was inserted in one side of the Ta tube and sealed.
The tube was set in the EVAP2 and the furnace was pumped down.
IGP1 = 1.24e-7 Torr.
The current was tapped to 40 A
Autoramp was set to 1 A/min to 300 A.
At TGHT 335.53 S, 5.28 V the temperature was 1560
The autoramp was set to 450 A.
At TGHT 474.75 S, 7.96 V the temperature was 1560
The autoramp was set to 450 A.
To reach 2000 C, TGHT = 500.25 A, 8.45 V.
After 1hr the temperature stabilized to 1959 C
and the current was increased to TGHT = 510.28 A, 8.64 V.
After stabilization the temperature reached 2010 C.
The current was decreased to TGHT = 503.15 A, 8.45 V
and the temperature stabilized to 2001 C.
The voltage increased unexpectedly to 8.89 V and the temperature increased to 2055,
the current was reduced to keep the tube at 2000 C.
The voltage kept increasing and we kept decreasing the current to keep the tube at 2000
The final current before venting and getting out the container was
TGHT = 466.219 A and 8.467 V.
Test result: Broken tantalum tube. |
Wednesday, March 13, 2019, 15:43, Marla Cervantes, , 43630-6, , Done, Graphite insert test #4
|
Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded with a graphite insert (with conical caps).
3 tantalum foils were wrapped around the tantalum tube and a Ta cap was added.
EVAP2 is currently pumping down
The tube will be hated for 5 days at 2000 C
Thursday, March 14, 2019, 10:07
IGP1 = 5.37e-7 Torr
The TGHT will be tapped manually to 50 A
After aprox 1 hour IGP1 = 5.08e-7 Torr, TGHT=46.5 A, 0.224 V
Autoramp is set to 1A/min to 300 A
Autoramp is set to 1A/min to 450 A
Autoramp was stopped at 425 A when 2000 C were achieved
Sunday, March 17, 2019, 00:25
IGP1 = 2.03e-7 Torr
TGHT=424.2 A, 7.117 V, temp 1976 C
Sunday, March 17, 2019, 15:04
IGP1 = 21.6e-7 Torr
TGHT=424.1 A, 7.085 V, temp 1967 C
cooling down -1 A/min |
Wednesday, January 23, 2019, 13:06, Marla Cervantes, , 43630-2, , Done, Graphite insert test #3
|
Wednesday, January 23, 2019, 13:01
A previously coated tantalum tube with 3 layers of shielding (Details in e-log 426) was loaded with a graphite insert.
The tube was loaded in evaporator 2 and pumped down
The graphite insert will be heated to 2000 C for 3 weeks
Thursday, January 24, 2019, 10:04
Pressure = 3.66e-7 Torr
TGHT manually tapped to 45 A
Final pressure = 3.8e-7 Torr
Set autoramp to 350 A @ 2A/min
TGHT = 1643 C
Set autoramp to 400 A @ 2A/min
TGHT = 1790 C
Started to tapped manually at approx 5 A every 30 s
Final TGHT => 1896 C, 8.16 V, 480.46 A
The current will stay at 480 A until temperature stabilizes.
The current was reduced to 476 A to stay at 1900 C
Friday, January 25, 2019, 17:16
Pressure = 3.22e-7 Torr
TGHT = 8.17 V, 477.65 A, 1882 C
Monday, January 28, 2019, 09:09
Pressure = 1.67e-7 Torr
TGHT = 8.07 V, 477.65 A, 1859 C
The temperature readings are fluctuating between 1880 and 1859 C
Tuesday, January 29, 2019, 07:32
Pressure = 1.55e-7 Torr
TGHT = 8.17 V, 477.75 A, 1880 C
Tuesday, January 29, 2019, 11:34
Pressure = 1.55e-7 Torr
TGHT = 8.27 V, 477.56 A, 1897C
Tuesday, January 29, 2019, 12:47
Pressure = 1.53e-7 Torr
TGHT = 8.19 V, 477.75 A, 1899C
Tuesday, January 29, 2019, 13:38
Pressure = 1.55e-7 Torr
TGHT = 8.25 V, 477.75 A, 1905C
Thursday, January 31, 2019, 16:12
Pressure = 1.40e-7 Torr
TGHT = 8.4 V, 476.81 A, 1918C
Thursday, January 31, 2019, 22:32
Pressure = 1.39e-7 Torr
TGHT = 8.37 V, 476.71 A, 1914C
The current will be ramped down @1 A/min
Friday, February 01, 2019, 09:58
Last 22 A tapped to 0 manually
Tantalum tube was removed from the EVAP2 |
Thursday, November 22, 2018, 10:19, Marla Cervantes, , 43630-7 , , Done, Graphite insert test #2
|
Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube with 3 layers of shielding was loaded with a graphite insert.
The tube was loaded in evaporator 2 on Wednesday 21/11/2018 and pumped down
The graphite insert will be heated to 2000 C
current pressure IGP1 = 4.2e-7 Torr
TGHT manually tapped to 40 A
Autoramp set to 2 A/min on TGHT to 400 A aiming for 1800 C
Thursday, November 22, 2018, 17:13
TGHT 401.25 A, 6.79 V
Temperature 1780 C
IGP1 7.89e-7 Torr
Tapping manually to reach 1800 C, final current 407.2 A, 6.96 V
Friday, November 23, 2018, 17:13
Tapped manually to TGHT 469.0 A, 8.64 V
Temperature 2019 C
IGP1 2.68e-7 Torr
Thursday, November 29, 2018, 08:03
TGHT 469.0 A, 8.945 V
Temperature 2061 C
IGP1 2.12e-7 Torr
Tuesday, December 04, 2018, 07:53
TGHT 469.1 A, 8.814 V
Temperature 1983 C
IGP1 1.52e-7 Torr
Wednesday, December 05, 2018, 21:30
TGHT 469.1 A, 8.75 V
Temperature 1983 C
IGP1 1.22e-7 Torr
Thursday, December 06, 2018, 12:25
TGHT 468.9 A, 8.66 V
Temperature 1977 C
IGP1 1.42e-7 Torr
Friday, December 07, 2018, 17:59
TGHT 468.9 A, 8.80 V
Temperature 1977 C
IGP1 1.42e-7 Torr
Wednesday, December 12, 2018, 12:18
TGHT 469.2 A, 8.7 V
Temperature 1945 C
IGP1 1.10e-7 Torr
Thursday, December 13, 2018, 10:42
TGHT 469 A, 8.7 V
Temperature 1939 C
IGP1 1.04e-7 Torr
Ramping temperature down at -2 A/min
Friday, December 14, 2018, 10:42
TGHT 0.0 A, 0.051 V
IGP1 4.36e-8 Torr |
Friday, November 02, 2018, 17:36, Marla Cervantes, Empty, 39530-1, LP-FEBIAD, Done, Graphite insert test #1
|
Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and syntered (e-log 421 Evaporator_2)
The container was loaded with an empty graphite insert.
Graphite insert mass = 24.1724 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the container
EVAP2 currently pumping down
Saturday, November 03, 2018, 08:04
IGP1 = 5.66e-7 Torr
Tapping manually to 40 A on TGHT and TBHT
Then auto/ramp wiill be set to 2 A/min on TGHT and 1 A/min on TBHT
Maximum temperature achieve 1802 C
Tuesday, November 06, 2018, 14:49
Container has reduced and increased its temperature from ~1760 to 1802 C.
IGP1 3.44e-7 Torr
TGHT 441.7 A and 7.7 V
TBHT 233.2 A and 3.2 V
Wednesday, November 07, 2018, 08:32
Temperature 1785 C
IGP1 2.90e-7 Torr
TGHT 441.38 A and 7.7 V
TBHT 233.2 A and 3.2 V
Friday, November 09, 2018, 17:26
Temperature 1787 C
IGP1 2.12 -7 Torr
TGHT 442.03 A and 7.7 V
TBHT 233.06 A and 3.19 V
Tuesday, November 13, 2018, 14:13: Turbos, power supplies off. Prepare for venting. |
Thursday, November 23, 2017, 15:10, Laura Lambert, , 41882-4, TARGET BOAT, Done, Graphite insert test 6x
|
Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously TaC coated target boat.
One endcap removed to allow for outgassing: left side out, right side in.
Weight of graphite tube + single endcap = 10.2012g
Same Ta heats shields remain on container from sintering TaC coating.
Currently pumping down in evap2.
Friday, November 24, 2017, 11:31
IGP1 = 4.52e-7 Torr
IGP2 = 3.43e-7 Torr
OMEGA slope = 0.98
Good vac at 3.0e-4, bad vac at 8.0e-4 Torr.
HS water valves have remained open since the last time evap2 was used.
No leak check done.
Tapped up manually to 50A.
Vacuum stable.
IGP1 = 5.34e-7 Torr
IGP2 = 5.54e-7 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 300A
Once max setpoints achieved, will tap up manually to final desired temperature of 2000C
Uranium targets go to a max temperature of 1950C online, so graphite insert should be tested to 2000C
Monday, November 27, 2017, 10:15
IGP1 = 2.5e-7 Torr
IGP2 = 1.9e-7 Torr
Reached 300A, 4.61V
OMEGA = 1298C
Tapped up manually to 485A, 8.46V
OMEGA = 1808C
Remained at this setpoint for a day
Tuesday, November 28, 2017, 15:41
IGP1 = 3.88e-7 Torr
IGP2 = 3.58e-7 Torr
Tapping up to 2000C...
Tuesday, November 28, 2017, 16:10
TGHT = 570A, 10.20V
OMEGA = 2005C
IGP1 = 9.64e-7 Torr
IGP2 = 1.05e-6 Torr
There was a minor drop in voltage at 540A, 9.58V - dropped to ~9.4V then slowly went back up to 9.58V [see photo]
Will remain at this setpoint overnight and cool down in the a.m.
Wednesday, November 29, 2017, 08:48
Voltage increased slowly while sitting at max setpoint of 570A [see photo]
TGHT = 570A, 11.20V --> voltage increased by 1.0V over ~16.5hrs
OMEGA = 2114C
IGP1 = 6.6e-7 Torr
IGP2 = 6.5e-7 Torr
Initiating auto-cool at 2.0A/min
Wednesday, November 29, 2017, 16:15
Vented in air and removed today.
Will update tomorrow with results and photos.
|
Wednesday, April 17, 2019, 09:06, Marla Cervantes, , 38295-10, LP-FEBIAD, Done, Graphite insert test 
|
Wednesday, April 17, 2019, 09:03
An uncoated target container was loaded with a graphite insert and wrapped with 3 tantalum layers,
Two Ta caps were used
EVAP2 was pumped down, IGP1 = 5.14e-7 Torr
The TGHT and TBHT current was tapped to 40 A manually
Autoramp was set to TGHT 1A/min to 500 A
and TBHT 0.5A/min to 230 A.
The temperature reached 2000 C as planned
the target container stayed at that temperature for 1 week.
Tuesday, April 23, 2019, 10:00
EVAP2 was vented and the target container was removed.
The container crystalized but did not break. |
Friday, May 24, 2019, 15:29, Marla Cervantes, , 43943-2, , Done, Graphite insert test
|
Friday, May 24, 2019, 15:26
A graphite insert with tantalum wires in its caps
was loaded in a tantalum tube, the system will be heated to 2000 C
and after 6 hrs at that temperature, it will be cooled and heated to 2000 C again.
The temperature will be hold at 2000 C for a 6 days.
Currently the chamber is being evacuated.
Saturday, May 25, 2019, 06:01
IGP1 = 2.2e-7 Torr
Manually tapping to 50 A
Autoramp set to 1 A/min to 400 A
Saturday, May 25, 2019, 13:37
The autoramp was set to 450 A
Then it was manually tappe to 475 A |
Monday, June 17, 2019, 17:03, Marla Cervantes, , 43943-2, , Done, Graphite insert test
|
Thursday, June 6, 2019, 16:43
A graphite insert with tantalum wires in its caps was loaded in a tantalum tube.
The system will be heated to 2000 C again (see elog 446)
Currently the chamber is being evacuated.
Friday, June 7, 2019, 16:40
Autoramp was set to 450 A at 1A/min to reach 2000 C
The temperature will be hold at 2000 C for a 4 days.
Tuesday, June 11, 2019, 16:46
Autoramp is set to -2 A/min to 0 A
Wednesday, June 12, 2019, 17:01
The tube present sever crystallization but is not broken and has some resistance against pressure. |
Wednesday, August 28, 2019, 05:59, Marla Cervantes, , 44062-2-SK, , Done, Graphite insert test
|
Wednesday, August 28, 2019, 06:00
A graphite insert (with conical caps) was loaded in tantalum tube
the Ta tube was wrapped with 3 tantalum foils,
a tantalum cap was inserted in one side of the Ta tube and sealed.
The tube was set in the EVAP2 and the furnace was pumped down.
IGP1 = 1.23e-6 Torr.
The current was tapped to 50 A
Autoramp was set to 1 A/min to 400 A.
Wednesday, August 28, 2019, 12:02
Autoramp reached 400 A
TGHT = 6.57 V, 404.4 A, IGP1=4.7e-6 Torr
Autoramp was set to 450 A at 1A/min
Wednesday, August 28, 2019, 12:48
Autoramp reached 450 A
TGHT =7.526 V, 450.188 A, IGP1=5.88e-6 Torr
Autoramp was set to 500 A at 1A/min
Wednesday, August 28, 2019, 13:40
Autoramp reached 500 A, temperature 1880 C
TGHT =8.79 V, 501.094A, IGP1=7.48-6 Torr
Autoramp was set to 540 A at 1A/min
Wednesday, August 28, 2019, 14:03
The autoramp was stopped at 520 A, because according to previous tests that current is enough to have 2000 C,
the temperature read was 1930 C
TGHT =9.23 V, 520.7 A, IGP1=7.8-6 Torr
Wednesday, August 28, 2019, 15:20
The autoramp was set to 540 A at 1A/min
When the ramp stopped the conditions were:
TGHT=9.59 V, 539.5 A, IGP1= 6.08e-6 Torr
Temperature= 1988 C
Manually tapped to 545 A the temperature reached 2000 C
Wednesday, August 28, 2019, 17:08
To keep the temperature at 2000 or less the current was decreased,
TGHT= 8.91 V, 445.125 A, IGP1=9.93e-7 Torr
Max temperature read: 2001 C
Min temperature read: 1996 C
Tuesday, September 03, 2019, 11:15
The tube was stable at 1950-1960 C during the weekend but today at around 6 am it had a drop in the current indicating mechanical failure
The autoramp was set to -2A/min to 0 A.
The tube will be examined and in case that it is not broken it will be set in the EVAP1 to continue heating it.
Monday, September 09, 2019, 16:35
The tube became brittle and broke. |
|