Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 27 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  433   Wednesday, March 13, 2019, 15:43 Marla Cervantes 43630-6 DoneGraphite insert test #4 Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps).
  
  428   Wednesday, January 23, 2019, 13:06 Marla Cervantes 43630-2 DoneGraphite insert test #3 Wednesday, January 23, 2019, 13:01
A previously coated tantalum
  
  424   Thursday, November 22, 2018, 10:19 Marla Cervantes 43630-7  DoneGraphite insert test #2 Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube
with 3 layers of shielding was loaded with
  
  422   Friday, November 02, 2018, 17:36 Marla CervantesEmpty39530-1LP-FEBIADDoneGraphite insert test #1 Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and
  
  393   Thursday, November 23, 2017, 15:10 Laura Lambert 41882-4TARGET BOATDoneGraphite insert test Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat.
 6x 
  439   Wednesday, April 17, 2019, 09:06 Marla Cervantes 38295-10LP-FEBIADDoneGraphite insert test Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped
 190417-TargetContainer-TEMP.pdfIMG_1074.JPG 
  446   Friday, May 24, 2019, 15:29 Marla Cervantes 43943-2 DoneGraphite insert testFriday, May 24, 2019, 15:26
 A graphite insert with tantalum
wires in its caps
  
  448   Monday, June 17, 2019, 17:03 Marla Cervantes 43943-2 DoneGraphite insert testThursday, June 6, 2019, 16:43
A graphite insert with tantalum
  
  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert testWednesday, August 28, 2019, 06:00
A graphite insert (with conical
  
  669   Thursday, August 08, 2024, 11:17 Marla CervantesC44139-5 SKLP TUBEDoneGraphite foils conditioning

    

       
            
 GraphiteFoil-Conditioning-EVAP2.JPG 
  445   Tuesday, May 21, 2019, 18:01 Marla Cervantes 43943-1 DoneGraphite foil test Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite
  
  525   Tuesday, November 24, 2020, 12:56 Marla Cervantes 44139-8-SK TARGET BOATDoneGraphite casting conditioningTuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum
 2020-11-24-IGP1.JPG2020-11-24IGP1-zoom_out.png2020-11-24-IGP1-stable.JPG2020-11-24-ConditioningProcess.JPG 
  606   Friday, December 02, 2022, 09:50 Darwin Ortiz Rosales 45220-12TARGET BOATDoneGrahite disc conditioning 221130-GraphiteFriday, December 02, 2022, 09:46
297 graphite discs packed into a
Ta tube wrapped in four heatshields.
  
  591   Wednesday, September 14, 2022, 11:48 Darwin Ortiz Rosales  TARGET BOATDoneGrahite disc conditioning 220907GWednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields.
  
  414   Tuesday, July 10, 2018, 16:43 John WongEmpty LP-SISDoneFor nano-SiC#1 Tuesday, July 10, 2018, 16:40
Container was flashed with TaC solution
and let dry in air. 
  
  470   Monday, November 25, 2019, 11:35 Aaron Schmidt   In progressFlex - line HS installed Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line
  
  524   Tuesday, November 24, 2020, 08:13 Aaron Schmidt    Flex - line HS installedMonday, November 23, 2020, 17:01: Flex-line
HS installed.

Tuesday, November 24, 2020,
  
  532   Monday, March 01, 2021, 13:58 Aaron Schmidt    Flex - line HS installedFlex-Line HS had been fully scrubbed out
earlier. All gaskets replaced.
Empty. Quick check for leaks.
  
  506   Thursday, September 10, 2020, 07:53 Aaron SchmidtEmpty41790-8LP-FEBIADDoneFernando FEBIAD / Anode testing. FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check
  
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned  Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
 See attachment#1 for the commissioning
 Evap2_Commissioning_Report.PDF 
ELOG V2.9.2-2455