510
|
Friday, September 25, 2020, 10:32 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward | Friday, September 25, 2020, 10:30
Target boat with a layer of |
|
511
|
Monday, September 28, 2020, 09:36 |
John Wong | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward |
|
|
96
|
Thursday, November 07, 2013, 09:38 |
Anders Mjos | | | | Problems resolved | Heat Shield cooling line twisted | See attached photo.
The Heat Shield has been taken to
the Machine Shop for repair. |
 |
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
406
|
Wednesday, April 25, 2018, 07:21 |
Aaron Schmidt | | | | Done | HS swap evap 2 | Wednesday, April 25, 2018, 07:05: TGHT
& TBHT off
Wednesday, April 25, 2018, 07:15: |
|
459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
518
|
Friday, October 16, 2020, 16:31 |
Luca Egoriti | Empty | | TARGET BOAT | In progress | HPOG annealing | Friday, October 16, 2020, 11:30
Target mounted in EVAP2. Pump
down started |
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
 |
636
|
Tuesday, June 06, 2023, 09:14 |
Darwin Ortiz Rosales | C | 44139-4 | TARGET BOAT | Done | Graphite inside insert Experiment 2 (regular formulation discs) | Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields. Note final |
|
634
|
Wednesday, May 24, 2023, 15:23 |
Darwin Ortiz Rosales | | 44139-4 | LP TUBE | Done | Graphite inside insert Experiment 1 |
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with |
|
430
|
Wednesday, February 13, 2019, 10:08 |
Darwin Ortiz Rosales | | 43630-1 | | Done | Graphite insert test 3b | Wednesday, February 13, 2019, 10:04
A previously coated tantalum |
|
437
|
Sunday, April 07, 2019, 08:13 |
Marla Cervantes | | 43630-5 | | Done | Graphite insert test #5 | Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated |
   |
433
|
Wednesday, March 13, 2019, 15:43 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test #4 | Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps). |
|
428
|
Wednesday, January 23, 2019, 13:06 |
Marla Cervantes | | 43630-2 | | Done | Graphite insert test #3 | Wednesday, January 23, 2019, 13:01
A previously coated tantalum |
|
424
|
Thursday, November 22, 2018, 10:19 |
Marla Cervantes | | 43630-7 | | Done | Graphite insert test #2 | Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube
with 3 layers of shielding was loaded with |
|
422
|
Friday, November 02, 2018, 17:36 |
Marla Cervantes | Empty | 39530-1 | LP-FEBIAD | Done | Graphite insert test #1 | Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and |
|
393
|
Thursday, November 23, 2017, 15:10 |
Laura Lambert | | 41882-4 | TARGET BOAT | Done | Graphite insert test | Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat. |
6x |
439
|
Wednesday, April 17, 2019, 09:06 |
Marla Cervantes | | 38295-10 | LP-FEBIAD | Done | Graphite insert test | Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped |
 |
446
|
Friday, May 24, 2019, 15:29 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Friday, May 24, 2019, 15:26
A graphite insert with tantalum
wires in its caps |
|
448
|
Monday, June 17, 2019, 17:03 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Thursday, June 6, 2019, 16:43
A graphite insert with tantalum |
|
|