Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 26 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  552   Wednesday, July 21, 2021, 16:45 Ferran Boix PamiesEmpty TARGET BOATDoneparasitic target thermal tests v2, foil measurement. 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
  
  561   Monday, November 01, 2021, 07:39 Darwin Ortiz RosalesEmpty44508-3LP-SISDoneTaC coating/sintering Monday, November 01, 2021, 07:37
Ta tube was coated with TaC
 211101-TaC_coating.png 
  562   Wednesday, November 03, 2021, 09:24 Darwin Ortiz RosalesEmpty44691-10LP-SISDoneTaC coating/sintering Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers)
  
  572   Sunday, April 17, 2022, 10:37 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK samples heat test Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend.
  
  574   Monday, April 25, 2022, 08:31 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK sample test 2Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. 
  
  583   Monday, June 20, 2022, 14:52 Darwin Ortiz RosalesEmpty  Donesoftstart of new TPMonday, June 20, 2022, 14:50 
A new Turbo pump was installed this
morning and it was soft started.  It
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  587   Thursday, August 04, 2022, 09:31 Ferran Boix PamiesEmpty TARGET BOATIn progressTC on Ta boat test. 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31
  
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  649   Monday, November 06, 2023, 14:07 Darwin Ortiz RosalesEmpty45220-4LP-SISDoneTaC coating sinteringMonday, November 06, 2023, 09:59
The coated container was wrapped
in 4 Ta foil heatshields.
  
  636   Tuesday, June 06, 2023, 09:14 Darwin Ortiz RosalesC44139-4TARGET BOATDoneGraphite inside insert Experiment 2 (regular formulation discs)Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields.  Note final
  
  669   Thursday, August 08, 2024, 11:17 Marla CervantesC44139-5 SKLP TUBEDoneGraphite foils conditioning

    

       
            
 GraphiteFoil-Conditioning-EVAP2.JPG 
  670   Wednesday, August 14, 2024, 07:23 Marla CervantesC44139-5 SKLP TUBEProblemsEVAP2 Calibration - Vanadium Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on 
 TP-not_speeding_up.JPG 
  671   Wednesday, August 14, 2024, 16:22 Marla CervantesC44139-5 SKLP TUBEProblems resolvedEVAP2 Calibration - Vanadium

    

       
            
  
  672   Wednesday, August 14, 2024, 16:24 Marla CervantesC44139-5 SKLP TUBEIn progressEVAP2 Calibration - Vanadium  
 


    
  
  6   Monday, March 19, 2012, 17:10 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets
  
  8   Tuesday, March 20, 2012, 14:39 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  9   Thursday, March 22, 2012, 00:34 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
 voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG 
  10   Thursday, March 22, 2012, 17:56 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  11   Thursday, March 29, 2012, 19:30 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets Thursday, March 29, 2012, 19:17
 
  
ELOG V2.9.2-2455