552
|
Wednesday, July 21, 2021, 16:45 |
Ferran Boix Pamies | Empty | | TARGET BOAT | Done | parasitic target thermal tests v2, foil measurement. | 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
|
|
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC |
|
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers) |
|
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend. |
|
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. |
|
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this
morning and it was soft started. It |
|
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
|
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31 |
|
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
|
649
|
Monday, November 06, 2023, 14:07 |
Darwin Ortiz Rosales | Empty | 45220-4 | LP-SIS | Done | TaC coating sintering | Monday, November 06, 2023, 09:59
The coated container was wrapped
in 4 Ta foil heatshields. |
|
|
636
|
Tuesday, June 06, 2023, 09:14 |
Darwin Ortiz Rosales | C | 44139-4 | TARGET BOAT | Done | Graphite inside insert Experiment 2 (regular formulation discs) | Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields. Note final |
|
|
669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
|
|
|
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on |
|
|
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
|
|
|
672
|
Wednesday, August 14, 2024, 16:24 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | In progress | EVAP2 Calibration - Vanadium |
|
|
|
6
|
Monday, March 19, 2012, 17:10 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering BeO pellets | Monday, March 19, 2012, 17:04
Target boat contains 4 BeO pellets |
|
|
8
|
Tuesday, March 20, 2012, 14:39 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
|
9
|
Thursday, March 22, 2012, 00:34 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
|
10
|
Thursday, March 22, 2012, 17:56 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
|
11
|
Thursday, March 29, 2012, 19:30 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering new BeO pellets | Thursday, March 29, 2012, 19:17
|
|