  89   Monday, September 23, 2013, 16:18 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  566   Wednesday, February 09, 2022, 08:08 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  568   Tuesday, February 15, 2022, 12:37 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  509   Thursday, September 24, 2020, 13:37 Aaron SchmidtNb TARGET BOAT Nb Test SRF groupSample loaded into a vertical target boat.
Flex line HS removed, SS waterline HS installed
-AS.
  
  409   Tuesday, May 08, 2018, 15:06 John Wongnp-SiCTube container  DoneNanoSiC thermal treatment batch#2Tuesday, May 08, 2018, 15:02
22 np-SiC fibrous discs loaded in
the tube container (coated and sintered with
  
  408   Tuesday, May 01, 2018, 18:07 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch#1Tuesday, May 01, 2018, 18:06
21 fibrous discs of nanoSiC are loaded
into a tube container (coated/Sintered with
  
  413   Tuesday, July 03, 2018, 17:05 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch #3Tuesday, July 03, 2018, 17:02
49 discs/ 15.42g np-SiC fibrous discs
loaded into the tube container
 data-retrieval.JPG 
  389   Wednesday, September 27, 2017, 18:06 John Wongnp-SiC TARGET BOATDoneNS-npSiC & B3 pellets heat treatmentsWednesday, September 27, 2017, 18:05
 3 samples from NS-npSiC pellets,
pressured at 10T  (see lab book pg 53)
 Capture.JPG 
  313   Friday, August 12, 2016, 11:08 Laura Lambert   MaintenanceNEW PUMP FOR GLOVE BOXWednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber
  
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  565   Thursday, November 25, 2021, 14:00 Aaron Schmidt    Lower insulator replaced The Helicoil had mostly pulled out
of the old one.
  
  399   Monday, December 11, 2017, 14:22 Laura Lambert   MaintenanceInterlock limits updated to 500mTorr Monday, December 11, 2017, 14:21
Dave updated evap2 interlock limits
to 500mTorr for TGHT and TBHT on friday
  
  232   Friday, July 31, 2015, 15:10 John Wong   MaintenanceInstalled leftside portFriday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2.  Leak check was
  
  18   Tuesday, May 15, 2012, 14:00 John Wong   MaintenanceInstalled a new stainless metal heat shield Tuesday, May 15, 2012, 13:45
It was discovered that one of the
insulators that supported the target module
 Evaporator#2_broken_insulator.pdfEvaporator#2_upgrade_.pdf 
  218   Thursday, June 18, 2015, 11:39 Rick Maharaj    Installation of Extraction Electrode Insulator - New MaterialTuesday June 16, 2015
An Extraction Insulator ITD0381 made
from a different grade of AiN was installed
  
  497   Wednesday, August 12, 2020, 08:58 Aaron Schmidt   In progressInstall Flex line HSFlex line HS installed. New SS gaskets. 
Wednesday, August 12, 2020, 08:56:
Roughing (Check).
  
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  
  381   Tuesday, August 01, 2017, 15:34 Laura Lambert   ProblemsIGP1 mis-communicating with EPICS - PLC problem?Monday, July 31, 2017, 15:24
Turned on BV and TP this afternoon.
Started ramping down, ~1min after
 evap2_trip_7.31.2017.JPG 
  514   Wednesday, October 07, 2020, 12:25 Aaron Schmidt   In progressIEVAP2:TP1 Swap out. Wednesday, October 07, 2020
TP1 was not spinning up past 4krpm.
Stalling & tripping out. Examined with
  
  5   Thursday, March 01, 2012, 14:42 John Wong    IEVAP2:TGHT/TBHT max current setpoint issueThursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT
maximum current setpoints on the vacuum page
 TGHT_TBHT_setpoints.JPG 