ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
33
|
Thursday, June 21, 2012, 18:13 |
John Wong | NiO | Ta target boat | | Failed | NiO development - Container broke! |
|
    |
31
|
Wednesday, June 20, 2012, 17:29 |
Nikita Bernier | NiO | Ta target boat | | Done | NiO development | Wednesday, June 20, 2012, 17:23
New Target boat, with no coating,
wrapped with a 0.002 inches thick Ta foil, |
 |
32
|
Wednesday, June 20, 2012, 22:33 |
John Wong | NiO | Ta target boat | | Done | NiO development |
|
|
346
|
Thursday, February 09, 2017, 11:49 |
Laura Lambert | | | | Maintenance | New heatshield with flexible water lines | Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday |
|
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
369
|
Thursday, May 11, 2017, 11:30 |
Laura Lambert | | | | Maintenance | New Ion Gauge for IGP2 | Thursday, May 11, 2017, 11:25
IGP2 has been having problems where
sometimes it turns off and requires simply |
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. |
|
550
|
Friday, June 11, 2021, 08:41 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb treatment for Norman | Friday, June 11, 2021, 08:05
Target boat with a layer of |
|
85
|
Tuesday, September 17, 2013, 11:21 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) | Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs.
3 discs are wraps with 0.001" thin of |
 |
86
|
Thursday, September 19, 2013, 11:56 |
Laura Lambert | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
87
|
Thursday, September 19, 2013, 17:02 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
88
|
Friday, September 20, 2013, 14:59 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
89
|
Monday, September 23, 2013, 16:18 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
566
|
Wednesday, February 09, 2022, 08:08 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
568
|
Tuesday, February 15, 2022, 12:37 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
509
|
Thursday, September 24, 2020, 13:37 |
Aaron Schmidt | Nb | | TARGET BOAT | | Nb Test SRF group | Sample loaded into a vertical target boat.
Flex line HS removed, SS waterline HS installed
-AS. |
|
409
|
Tuesday, May 08, 2018, 15:06 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch#2 | Tuesday, May 08, 2018, 15:02
22 np-SiC fibrous discs loaded in
the tube container (coated and sintered with |
|
408
|
Tuesday, May 01, 2018, 18:07 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch#1 | Tuesday, May 01, 2018, 18:06
21 fibrous discs of nanoSiC are loaded
into a tube container (coated/Sintered with |
|
413
|
Tuesday, July 03, 2018, 17:05 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch #3 | Tuesday, July 03, 2018, 17:02
49 discs/ 15.42g np-SiC fibrous discs
loaded into the tube container |
|
389
|
Wednesday, September 27, 2017, 18:06 |
John Wong | np-SiC | | TARGET BOAT | Done | NS-npSiC & B3 pellets heat treatments | Wednesday, September 27, 2017, 18:05
3 samples from NS-npSiC pellets,
pressured at 10T (see lab book pg 53) |
|