139
|
Friday, June 20, 2014, 12:01 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target | Friday, June 20, 2014, 11:14
Made from batch's: oct 23/2013, oct 31/2013 and june 2012
Total number of foils: 515 discs
Total mass of materials [incl graphite foils]: 64.7224g
Total length packed: 17.8cm
Container is wrapped with 3x Ta-heat shields.
Currently being pumped down.
Friday, June 20, 2014, 14:56
HS cooling water valves opened, no leaks detected.
IGP1 = 6.2e-6 Torr
TGHT max = 820A/ 17V
TBHT max = 300A/ 5V
Stepping up manually to 40A
Friday, June 20, 2014, 16:04
IGP1 = 8e-6 Torr
Slowly stepped up to 35A manually.
Vacuum has stabilized.
Initiating auto-ramp at 0.1A/min
|
140
|
Friday, June 20, 2014, 16:22 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
Laura Lambert wrote: |
Friday, June 20, 2014, 11:14
Total number of foils: 515 discs
Total mass of materials [incl graphite foils]: 64.7224g
Total length packed: 17.8cm
Container is wrapped with 3x Ta-heat shields.
Currently being pumped down.
Friday, June 20, 2014, 14:56
HS cooling water valves opened, no leaks detected.
IGP1 = 6.2e-6 Torr
TGHT max = 820A/ 17V
TBHT max = 300A/ 5V
Stepping up manually to 40A
Friday, June 20, 2014, 16:04
IGP1 = 8e-6 Torr
Slowly stepped up to 35A manually.
Vacuum has stabilized.
Initiating auto-ramp at 0.1A/min
|
Friday, June 20, 2014, 16:16
Changing the heating current...
From the previous SiC targets, TGHT was ramped up to 800A and yellow crystals were found; the end caps and target legs were also found broken (see my iPad). This might be too hot for the Ta-boat to handle the sintering process.
For this process,
TGHT will ramp up to 600A and TBHT to 230A over the weekend.
Then, the temperature will be measured. The sintering temperature of SiC is ~1800 - 2000C.
|
141
|
Monday, June 23, 2014, 09:47 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
John Wong wrote: |
Laura Lambert wrote: |
Friday, June 20, 2014, 11:14
Total number of foils: 515 discs
Total mass of materials [incl graphite foils]: 64.7224g
Total length packed: 17.8cm
Container is wrapped with 3x Ta-heat shields.
Currently being pumped down.
Friday, June 20, 2014, 14:56
HS cooling water valves opened, no leaks detected.
IGP1 = 6.2e-6 Torr
TGHT max = 820A/ 17V
TBHT max = 300A/ 5V
Stepping up manually to 40A
Friday, June 20, 2014, 16:04
IGP1 = 8e-6 Torr
Slowly stepped up to 35A manually.
Vacuum has stabilized.
Initiating auto-ramp at 0.1A/min
|
Friday, June 20, 2014, 16:16
Changing the heating current...
From the previous SiC targets, TGHT was ramped up to 800A and yellow crystals were found; the end caps and target legs were also found broken (see my iPad). This might be too hot for the Ta-boat to handle the sintering process.
For this process,
TGHT will ramp up to 600A and TBHT to 230A over the weekend.
Then, the temperature will be measured. The sintering temperature of SiC is ~1800 - 2000C.
|
Monday, June 23, 2014, 09:45
IGP1 = 5e-6 Torr
TGHT and TBHT are at ~200A
Increasing ramping rate to 0.2A/min
Monday, June 23, 2014, 11:19
IGP1 = 6.9e-6 Torr
Increasing ramping rate to 2.0A/min
Monday, June 23, 2014, 12:09
JW: Pressure went up too fast... lower the TGHT ramping up rate to 1A/min.
Tuesday, June 24, 2014, 16:06
Increasing current with respect to temperature: See attached table
|
Attachment 1: current_vs_temp.jpeg
|
|
142
|
Tuesday, June 24, 2014, 23:57 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Friday, June 20, 2014, 11:14
Total number of foils: 515 discs
Total mass of materials [incl graphite foils]: 64.7224g
Total length packed: 17.8cm
Container is wrapped with 3x Ta-heat shields.
Currently being pumped down.
Friday, June 20, 2014, 14:56
HS cooling water valves opened, no leaks detected.
IGP1 = 6.2e-6 Torr
TGHT max = 820A/ 17V
TBHT max = 300A/ 5V
Stepping up manually to 40A
Friday, June 20, 2014, 16:04
IGP1 = 8e-6 Torr
Slowly stepped up to 35A manually.
Vacuum has stabilized.
Initiating auto-ramp at 0.1A/min
|
Friday, June 20, 2014, 16:16
Changing the heating current...
From the previous SiC targets, TGHT was ramped up to 800A and yellow crystals were found; the end caps and target legs were also found broken (see my iPad). This might be too hot for the Ta-boat to handle the sintering process.
For this process,
TGHT will ramp up to 600A and TBHT to 230A over the weekend.
Then, the temperature will be measured. The sintering temperature of SiC is ~1800 - 2000C.
|
Monday, June 23, 2014, 09:45
IGP1 = 5e-6 Torr
TGHT and TBHT are at ~200A
Increasing ramping rate to 0.2A/min
Monday, June 23, 2014, 11:19
IGP1 = 6.9e-6 Torr
Increasing ramping rate to 2.0A/min
Monday, June 23, 2014, 12:09
JW: Pressure went up too fast... lower the TGHT ramping up rate to 1A/min.
Tuesday, June 24, 2014, 16:06
Increasing current with respect to temperature: See attached table
|
Tuesday, June 24, 2014, 23:44
Target has been heated at 600A. Local temperature measured on the right leg = 1814C.
RGA/ striptool/temperature data can be found on this link:
https://www.dropbox.com/sh/69memvh6fthodoz/AABZiSKAR9njhbqO4sBATVbla
Something interesting was observed about the out gassing of this target - the right window was coated when the temperature rose above 1500C (on the right end, could be hotter inside?) - see attachment.
I suspect this is Si vapour deposited on the window when the target heater got closed to the sintering temperature for SiC (1800 - 2000C).
Once the chamber is vented, the coated window will be inspected and analyzed. More details later...
Initiate auto-cooling (slow cool down) TGHT 1A/min; TBHT 0.5/min. Chamber should be able for venting tomorrow afternoon.
|
Attachment 1: 2014-06-24_16.57.17.jpg
|
|
167
|
Thursday, October 23, 2014, 15:38 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Testing the new OMEGA-IR2C on SiC#31 target | Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed for OMEGA-IR2C beam to reach material [see pic]
no heat shields
currently being pumped down
Friday, October 24, 2014, 11:34
EVAP2 pumped down overnight.
IGP1 = 7e-7 Torr
HS water valves opened, no leaks detected.
TGHT will be ramped up to 1400C
TBHT will be ramped up to 230A
Friday, October 24, 2014, 14:32
TBHT reached 230A, TGHT reached 1400C
Stepped TGHT up manually to 1600C; TGHT = 693A, 10.6V [see pic]
Friday, October 24, 2014, 15:58
TGHT = 760A, 12.07V [local read back] = setpoint.
epics readback TGHT = 754.8A, 11.76V
OMEGA = 1700C
Friday, October 24, 2014, 16:26
OMEGA = 1800C
epics readback TGHT = 828.7A, 13.15V
Friday, October 24, 2014, 16:34
OMEGA = 1900C
epics readback TGHT = 899A, 14.53V
Friday, October 24, 2014, 16:46
OMEGA = 2000C
epics readback TGHT = 967A, 15.8V
MIKRON target spot on SiC = 1650C, e = 0.97
|
Attachment 1: 2014-10-23_15.12.56.jpg
|
|
Attachment 2: 2014-10-24.jpeg
|
|
169
|
Tuesday, November 04, 2014, 16:21 |
John Wong | SiC | 39530-8 | HP-FEBIAD | Done | Testing the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE) |
Laura Lambert wrote: |
Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed for OMEGA-IR2C beam to reach material [see pic]
no heat shields
currently being pumped down
Friday, October 24, 2014, 11:34
EVAP2 pumped down overnight.
IGP1 = 7e-7 Torr
HS water valves opened, no leaks detected.
TGHT will be ramped up to 1400C
TBHT will be ramped up to 230A
Friday, October 24, 2014, 14:32
TBHT reached 230A, TGHT reached 1400C
Stepped TGHT up manually to 1600C; TGHT = 693A, 10.6V [see pic]
Friday, October 24, 2014, 15:58
TGHT = 760A, 12.07V [local read back] = setpoint.
epics readback TGHT = 754.8A, 11.76V
OMEGA = 1700C
Friday, October 24, 2014, 16:26
OMEGA = 1800C
epics readback TGHT = 828.7A, 13.15V
Friday, October 24, 2014, 16:34
OMEGA = 1900C
epics readback TGHT = 899A, 14.53V
Friday, October 24, 2014, 16:46
OMEGA = 2000C
epics readback TGHT = 967A, 15.8V
MIKRON target spot on SiC = 1650C, e = 0.97
|
Tuesday, November 04, 2014, 15:59
Target was heated up to 2000C and last for about 1.5 days before the right leg (ionizer points into the page) broke off.
Interesting discovery... The "yellowish" crystals are forming on the discs.
Suspecting a phase transformation of 6H (hexagonal/- alpha SiC (hexagonal) polytype to 3C(cubic) - beta SiC
More study needs to be done...
See elog # 168.
The leg of this target was repaired in the Machine shop.
THIS TARGET WILL NOT BE USED ONLINE - IT WILL BE USED FOR OFFLINE R&D PURPOSES.
|
241
|
Tuesday, August 25, 2015, 11:54 |
Laura Lambert | Empty | | HP-FEBIAD | In progress | Sintering TaC coating container for SiC Target | Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, August 25, 2015, 13:52
IGP1 = 2.2e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C
Wednesday, August 26, 2015, 09:56
IGP1 = 8.8e-7 Torr.
TGHT = 260A, 3.0V
TBHT = 145A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, August 26, 2015, 14:15
IGP1 = 3.5e-6 Torr.
TGHT = 720A, 11.3V
TBHT = 230A, 3.2V
DV = 5.48V
OMEGA RS [right side-old port] = 1745C
OMEGA LS [left side-new port] = 1880C
Tapping up manually to achieve 1800C on OMEGA RS
Wednesday, August 26, 2015, 14:44
IGP1 = 3.7e-6 Torr.
TGHT = 748A, 11.9V
DV = 5.78V
OMEGA RS = 1803C
OMEGA LS = 1935C
Thursday, August 27, 2015, 07:31
Remained at max setpoints for ~17hrs.
IGP1 = 1.3e-6 Torr.
DV = 5.79V
OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]
OMEGA LS = 1955
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
242
|
Thursday, August 27, 2015, 16:37 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating container for SiC Target |
Laura Lambert wrote: |
Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, August 25, 2015, 13:52
IGP1 = 2.2e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C
Wednesday, August 26, 2015, 09:56
IGP1 = 8.8e-7 Torr.
TGHT = 260A, 3.0V
TBHT = 145A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, August 26, 2015, 14:15
IGP1 = 3.5e-6 Torr.
TGHT = 720A, 11.3V
TBHT = 230A, 3.2V
DV = 5.48V
OMEGA RS [right side-old port] = 1745C
OMEGA LS [left side-new port] = 1880C
Tapping up manually to achieve 1800C on OMEGA RS
Wednesday, August 26, 2015, 14:44
IGP1 = 3.7e-6 Torr.
TGHT = 748A, 11.9V
DV = 5.78V
OMEGA RS = 1803C
OMEGA LS = 1935C
Thursday, August 27, 2015, 07:31
Remained at max setpoints for ~17hrs.
IGP1 = 1.3e-6 Torr.
DV = 5.79V
OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]
OMEGA LS = 1955
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 27, 2015, 16:34
Target is removed from the evaporator and inspected.
The "flushing technique" has a much better result. The inner coated surface is sintered well.
|
243
|
Tuesday, September 01, 2015, 17:20 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 | Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
244
|
Wednesday, September 02, 2015, 11:28 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Attachment 1: Screenshot-1stsintering-prewindow_coating.JPG
|
|
245
|
Tuesday, September 08, 2015, 15:56 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Attachment 1: SiC#33_HPFEBIAD_temp.PNG
|
|
Attachment 2: SiC#33_HPFEBIAD_temp.xlsx
|
Attachment 3: left_window.JPG
|
|
Attachment 4: left_window_1.JPG
|
|
246
|
Wednesday, September 09, 2015, 18:24 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Attachment 1: Screen_Shot_2015-09-09_at_5.53.15_PM.png
|
|
247
|
Thursday, September 10, 2015, 09:58 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Thursday, September 10, 2015, 09:55
HS water valves opened this morning, no leaks detected.
TGHT and TBHT tapped up manually to 35A.
IGP1 = 4.4e-7 Torr, vacuum stable.
Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.
|
248
|
Thursday, September 10, 2015, 12:05 |
John Wong | SiC | 39530-5 | HP-FEBIAD | Done | Re-conditioning SiC#32 |
Laura Lambert wrote: |
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Thursday, September 10, 2015, 09:55
HS water valves opened this morning, no leaks detected.
TGHT and TBHT tapped up manually to 35A.
IGP1 = 4.4e-7 Torr, vacuum stable.
Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.
|
Thursday, September 10, 2015, 12:05
Changed TGHT to 2A/min and TGHT remains at 1A/min. Vacuum is table at 1.0e-6 Torr.
Friday, September 11, 2015, 11:34
TGHT was at 600A for almost 20 hours. Vac at 5.2 e-7 Torr. L-temp at 1490C, R-temp at 1685 (odd?). Using pyrometer to measure - Right end does seem brighter than the L end.
Continue to ramp up TGHT. Date is collected, will be posted later.
Friday, September 11, 2015, 11:53
L/R-temp measurements just don't seem normal.
Ramped up to 220A- temp reads L = 1522C, R = 1722C.
Ramping down TBHT doesn't change the temp.
Will cool TGHT/TBHT to 0A at 2A/min & 1A/min, respectively.
Will vent the chamber on Monday and inspect for any wrong.
Monday, September 14, 2015, 12:13
The target has taken out for inspection. No visible damage/problem was observed. The Ta-foil for loss particle capture only showed some heat marking but no material was trapped.
Target was weighted, no mass loss was observed.
Try expending the end caps to get a good thermal conductivity and will re-conditiong again.
Tuesday, September 15, 2015, 12:31
The end caps have been expended.
New Ta foils are used for the heat shields. The foils are cut in 3 1/4" x 12" and wrapped around the target. (see attachment). This is to see if the heat is evenly distributed.
Both omega optical lens are aligned properly.
Target is installed but the chamber is NOT yet being pumped down. Awaiting for the fume hood work in B2 level to be complete before the evaporator can be started.
Wednesday, September 16, 2015, 17:57
The work in the B2 level is done; the nuclear ventilation for the evaporators is now operational.
Chamber is currently being pumped down.
Thursday, September 17, 2015, 12:19
Chamber has been pump down overnight and pressure is currently at 5.8e-7 Torr.
HS valves are opened and no leaks are detected.
Ramping up TGHT/TBHT to 600A at 2A/min and 230A at 1A/min, respectively.
Thursday, September 17, 2015, 17:58
TGHT has reached to 600A/9.14V. Both the L and R temperatures are measured at 1710C and 1760C, respectively. At 600A, the temperature now is about 300C higher compared to that during the sintering process.
The difference in the temperature could be from Ta surface vs SiC surface. (But the 2-color IR temp reader shouldn't matter what color it's measuring?!! I don't know!)
Note:
Both temperature readings are fairly close. Could this be improved from the new Ta-foils? Possible!
It is still unclear what is the absolute temperature. A more systematic student needs to be done.
Using a thermocouple couple to measurement the endcaps at 600A and compared with the Omage reader may help to understand more.
After discussing with Friedhelm, it is decided to stay the target at 600A for the conditioning process.
Friday, September 18, 2015, 09:10
Target has been heated at 600A at stable temperature at 1716C (LS) and 1769C (RS), see attachment.
Friday, September 18, 2015, 11:45
Initiated cooling down at 2A/min for TGHT, and 1A/min TBHT.
Currently vac at 5.48e-7 Torr.
Thursday, September 24, 2015, 11:31
Target was inspected after the 2nd conditioning, up to 1700C at 600A for overnight.
No solid particle was observed that might have extracted from the ionizer tube.
The heat shields have been removed and the target is ready for assembly.
|
Attachment 1: Screen_Shot_2015-09-15_at_12.37.19_PM.png
|
|
Attachment 2: Screen_Shot_2015-09-18_at_9.10.13_AM.png
|
|
Attachment 3: Screen_Shot_2015-09-24_at_11.30.25_AM.png
|
|
263
|
Monday, November 23, 2015, 14:36 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | temp measurements with no h.s on HP-FEBIAD container | Monday, November 23, 2015, 14:29
No heat shields.
Container empty.
Loaded into evap2 and currently pumping down.
Tuesday, November 24, 2015, 09:36
HS water valves opened this morning, no leaks detected.
IGP1 = 4.5e-7 Torr.
Changed slope of OMEGA IR to 0.98 for empty container.
Tapped up manually to 35A.
IGP1 = 4.7e-7 Torr.
Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Final setpoints: TBHT = 230A, TGHT = 300A
Will tap up manually to 2000C
Tuesday, November 24, 2015, 14:00
TGHT = 300A, 3.75V
TBHT = 230A, 3.08V
IGP1 = 4.7e-7 Torr
No reading yet on the OMEGA.
Re-initiating auto-ramp to final setpoint TGHT = 450A
Wednesday, November 25, 2015, 09:11
IGP1 = 3.0e-7Torr.
TGHT = 450A, 6.37V
Tapping up manually to 2000C
Wednesday, November 25, 2015, 15:31
container was tapped up manually to 650A, slope/emissivity settings were checked.
ramped back down to 450A and tapped up manually while recording data up to 1800C [legs = 2000C]
once reached 1800C, tapped TBHT down manually to see relation of TBHT to temperature/ TGHT
remained at 1800C for ~1hr [while tapping down TBHT] before initiating auto-cool at 2.0A/min for the TGHT
see attachment for raw data.
Thursday, November 26, 2015, 10:08
Vented in air and took out this morning.
|
Attachment 1: temp_measurements.xlsx
|
264
|
Monday, November 30, 2015, 15:38 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | emissivity measurements with no h.s on HP-FEBIAD container | Monday, November 30, 2015, 15:37
No heat shields.
Container empty.
Loaded into evap2 and currently pumping down.
Tuesday, December 01, 2015, 10:07
HS water valves opened this morning, no leaks detected.
IGP1 = 4.3e-7 Torr.
Slope of OMEGA = 0.98
Tapped up manually to 35A.
Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Final setpoints: TBHT = 90A, TGHT = 360A
Once final setpoints reached, will tap up manually to max 1800C [legs = 2000C]
Monday, December 07, 2015, 09:06
Container was tapped up manually with emissivity measurements taken every 50A starting at 360A.
The final measurement was taken at 640A.
Container was ramped down for the weekend.
See attachment for raw data.
|
Attachment 1: emissivity_measurements.xlsx
|
266
|
Monday, December 07, 2015, 09:06 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | emissivity measurements with no h.s on HP-FEBIAD container - round2 | Monday, December 07, 2015, 09:04
No heat shields.
Container empty.
IGP1 = 1.1e-7 Torr.
Slope of OMEGA = 0.98
Tapped up manually to 35A.
Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Final setpoints: TBHT = 90A, TGHT = 360A
Will tap up with the same parameters as last round to confirm results.
Friday, December 11, 2015, 11:44
Took out of evap2 yesterday.
Aurelia took many emissivity measurements to compare with previous data - which matched up.
The dip in emissivity before going up again around ~560A could be due to oxidation of the materials.
|
322
|
Thursday, September 15, 2016, 16:37 |
Laura Lambert | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 | Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
323
|
Monday, September 19, 2016, 18:48 |
John Wong | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 - Change OMEGA/MiKRON slopes |
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
324
|
Tuesday, September 20, 2016, 15:40 |
Laura Lambert | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
Tuesday, September 20, 2016, 15:18
there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA
this prompted another change in the slope on the OMEGA to 1.08
TGHT was then tapped up manually to 600A/ 1800C
will remain at this max setpoint for a few days before ramping down
see attachment for raw data
Wednesday, September 21, 2016, 11:34
temperatures dropped a small amount overnight.
tapped up manually to 625A/ 1810C
still no coating on window.
see attachment for updated raw data
|
Attachment 1: sintering_target_data.xlsx
|
|