  599   Tuesday, November 01, 2022, 17:35 John WongTiC TARGET BOATDoneNp-TiC fibres systhesisTuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner.  Each
 TiO2_C_fibres_carbonization_elog599.png 
  605   Thursday, November 24, 2022, 11:08 John WongTiC TARGET BOATDoneSynthesis of TiC fibrous disc (TiO2/PAN only)Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample
 striptool_1600C.jpgstriptool_1887C.jpg 
  627   Wednesday, April 26, 2023, 22:26 John WongTiC44692-5LP-FEBIADIn progressTiC230425


   
        
            
 Screenshot_2023-04-26_221720.jpg 
  630   Thursday, April 27, 2023, 22:18 John WongTiC44692-5LP-FEBIADIn progressTiC230425


   
        
            
 Screenshot_2023-04-27_204948.jpgScreenshot_2023-04-27_205012.jpgScreenshot_2023-04-27_220239.jpgScreenshot_2023-04-27_220323.jpgScreenshot_2023-04-28_010640.jpg 
  633   Tuesday, May 02, 2023, 14:20 John Wongnp-TiO2 TARGET BOATIn progressCarbonization of np-TiO2 spun fibrous pellets/fibre matsTuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with
 7x 
  667   Friday, July 26, 2024, 10:05 John Wongnp-Ta TARGET BOATDoneCarbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt)

    

       
            
 Screenshot_2024-07-26_170518.pngScreenshot_2024-07-28_112630.pngScreenshot_2024-07-31_112557.pngScreenshot_2024-07-31_171808.png 
  673   Monday, August 19, 2024, 13:17 John Wongnp-Ta TARGET BOATIn progressCarbonization of heat stabilized np-Ta fibres - 2nd AttemptMonday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at
 Capture.PNG 
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  595   Tuesday, October 18, 2022, 13:59 Hannah ToyTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2
  
  579   Wednesday, June 08, 2022, 10:00 Flora Wu boat Donecarbonize PAN 10% discsThursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun
  
  493   Friday, July 31, 2020, 11:16 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneThermocouple measurent of boat temperatureBoat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020
  
  495   Wednesday, August 05, 2020, 19:14 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneParasitic target cooling test 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr.
  
  496   Tuesday, August 11, 2020, 10:17 Ferran Boix PamiesEmpty41882-1TARGET BOATIn progressContamination foils temperature testThe target was prepared and put under vacuum
on 2020-08-10
 
  
  515   Friday, October 09, 2020, 09:50 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneTests, radiation gun for parasitic target 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on,
  
  516   Tuesday, October 13, 2020, 11:15 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDonefoil heating 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s
  
  517   Thursday, October 15, 2020, 18:51 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneheat gun plus parasitic target thermal comissioning. 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. 
  
  520   Tuesday, October 27, 2020, 10:25 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneparasitic target commissioning 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements
  
  521   Monday, November 02, 2020, 18:32 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneHEA heat treatment2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok.
 20201104_102925.jpg20201104_144831.jpg 
  522   Wednesday, November 04, 2020, 17:31 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneParasitic target graphite outgassing. 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on.
  
  523   Thursday, November 05, 2020, 15:13 Ferran Boix PamiesEmpty41882-2TARGET BOATDonecleaning treatment. 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on.
  