  Evaporator_2, Page 23 of 34  Not logged in ELOG logo
Entry  Wednesday, March 01, 2023, 21:49, Darwin Ortiz Rosales, Ta, 44692-3, HP-SIS, Done, TaC coating sintering 
Wednesday, March 01, 2023, 21:46
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins)
Entry  Monday, March 06, 2023, 21:34, Darwin Ortiz Rosales, SiC, 44692-3, HP-SIS, Done, 230306SiC conditioning 
Monday, March 06, 2023, 21:29
Total number of foils:382 ( including 5 analysis discs on the right side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
Entry  Sunday, March 12, 2023, 08:06, Darwin Ortiz Rosales, Ta, 44692-2, HP-SIS, Done, TaC coating sintering 
Sunday, March 12, 2023, 08:04
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins)
Entry  Monday, March 13, 2023, 22:31, Darwin Ortiz Rosales, SiC, 44692-2, HP-SIS, Done, SiC-230313 
Monday, March 13, 2023, 22:28
Total number of foils:380 ( including 5 analysis discs on the front side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
Entry  Tuesday, September 12, 2023, 09:54, Darwin Ortiz Rosales, TaC, 41369-2, HP-SIS, Done, TaC coating sintering 
Tuesday, September 12, 2023, 09:51
The coated container was wrapped in 3 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
Entry  Thursday, December 14, 2023, 09:58, Darwin Ortiz Rosales, SiC, 41369-2, HP-SIS, Done, 231208SiC conditioning Screenshot_2023-12-14_133432.png
Thursday, December 14, 2023, 09:53
Target left pumping down in Evap2 overnight. 
Initial weight including protective jig = 1474.3 g
Entry  Friday, April 26, 2024, 06:19, Darwin Ortiz Rosales, TaC, 45447-29, HP-SIS, Done, TaC coating sintering 



 Monday, April 29, 2024, 19:50
Started coating with coating stand.
Entry  Wednesday, May 01, 2024, 11:54, Darwin Ortiz Rosales, TaC, 25447-27, HP-SIS, Done, TaC coating sintering 
Wednesday, May 01, 2024, 11:53
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-06 Torr
Entry  Monday, October 25, 2021, 11:53, Darwin Ortiz Rosales, TaC, 42218-4, HP-IG-LIS, Done, TaC coating/sintering 
 Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Entry  Thursday, May 11, 2017, 11:25, Laura Lambert, Empty, 41369-10, HP-FEBIAD-CTL, Done, RUSH! Sintering TaC coated container for SiC#36 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg
 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has finished conditioning is loaded in the wrong container and it should be a SiC HP-FEBIAD cold transfer line...so
rush on new target.
Entry  Tuesday, May 16, 2017, 11:57, Laura Lambert, SiC, 41369-10, HP-FEBIAD-CTL, Done, Sintering SiC#36 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg
 Tuesday, May 16, 2017, 10:56
Target container contains 460 discs of SiC 
Target packed length = 17cm. 
Entry  Wednesday, May 23, 2018, 15:21, Laura Lambert, Empty, , HP-FEBIAD-CTL, Done, Sintering TaC coating container for UCx#23 
Wednesday, May 16, 2018, 09:56
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube.
Entry  Sunday, July 22, 2012, 20:51, John Wong, NiO, 38481-7, HP-FEBIAD, Done, Sintering NiO#1 NiO#1_sinteringevap2.pngNIO#1_TGHT_TBHT_250_220.pngSintered_NiO.GIFEndcap.GIF
 Sunday, July 22, 2012, 20:30
The NiO target materials were loaded into the container today.  
Total discs = 500, (10 discs/pack) 
Entry  Tuesday, August 14, 2012, 15:57, John Wong, SiC, 38295-8 , HP-FEBIAD, Done, Testing endcaps inserted /w the new expansion tool vacuum_leaks.PNGTGHT_TBHT.png
Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May 2011 with the Evaporator#1.  The target will not used for online. 
Two endcaps were inserted with the new expansion tool.  The target will be heated up to the normal operating condition (TGHT =580A, TBHT =
Entry  Wednesday, March 06, 2013, 10:41, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
    Reply  Wednesday, March 06, 2013, 17:53, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test rampingup_1.PNGrampingup_2.PNGautorampingdown_23.PNG


    
        
            Anders Mjos wrote:
        
        
            
            Wednesday, March 06, 2013
    Reply  Monday, March 11, 2013, 12:23, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2 2013-03-11_Evap2_Second_Thermal_Test.pdf
 

    
        
            Anders Mjos wrote:
        
        
            
    Reply  Monday, March 11, 2013, 15:59, John Wong, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2 autorampingup_110.PNG


    
        
            Anders Mjos wrote:
        
        
            
            
            
              
Entry  Wednesday, March 13, 2013, 16:08, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, Thermal test HP-FEBIAD-A_TC_at_fins.pdf
Wednesday, March 13, 2013 
Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
Entry  Thursday, March 14, 2013, 12:27, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 3 (w/o CTL block) 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx
Thursday, March 12, 2013 
The CTL was removed and target heated to 580A / 300A
T1: Left target leg close to tube