Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 23 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  321   Monday, September 12, 2016, 17:27 John WongEmpty39530-9HP-SISDoneRUSH. Round 2: Sinering TaC coating

    

       
            
 Screen_Shot_2016-09-14_at_5.05.08_PM.pngScreen_Shot_2016-09-14_at_5.03.48_PM.png 
  377   Tuesday, June 20, 2017, 16:07 Laura LambertTa42218-6HP-SISDoneConditioning Ta#53 Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
 Ta#53.JPG 
  388   Friday, September 15, 2017, 10:56 Laura LambertTa42218-10HP-SISDoneConditioning Ta#54 Friday, September 15, 2017, 09:44
Target consists of 470 discs.
 Capture.JPG 
  412   Thursday, June 21, 2018, 11:38 Aaron SchmidtTa42218-9HP-SISDoneConditioning Ta#56 Ta#56 HP-SIS target description:
 Ta#56_Evap_2_Conditioning.docx 
  476   Tuesday, March 10, 2020, 09:34 Darwin Ortiz RosalesEmpty42218-8HP-SISDoneTaC coating/sinteringMonday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields.
 SiC#40.PNG 
  477   Friday, March 13, 2020, 14:21 Darwin Ortiz RosalesSiC42218-8 HP-SISDone Conditioning of SiC discs (sintering) (RUSH) Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
  
  488   Monday, June 15, 2020, 14:28 Darwin Ortiz RosalesEmpty42218-7HP-SISDoneTaC coating/sintering Monday, June 15, 2020, 13:30
Container coated with TaC and
  
  549   Wednesday, April 28, 2021, 11:57 Darwin Ortiz RosalesSiC42218-7HP-SISDonesintering discs for SiC#41 (or back-up for #40)Wednesday, April 28, 2021, 11:54
Total number of foils: 449 (not including
analysis discs)
  
  611   Wednesday, March 01, 2023, 21:49 Darwin Ortiz RosalesTa44692-3HP-SISDoneTaC coating sinteringWednesday, March 01, 2023, 21:46
Ta HP-SIS was coated
  
  613   Monday, March 06, 2023, 21:34 Darwin Ortiz RosalesSiC44692-3HP-SISDone230306SiC conditioningMonday, March 06, 2023, 21:29
Total number of foils:382
  
  615   Sunday, March 12, 2023, 08:06 Darwin Ortiz RosalesTa44692-2HP-SISDoneTaC coating sinteringSunday, March 12, 2023, 08:04
Ta HP-SIS was coated
  
  616   Monday, March 13, 2023, 22:31 Darwin Ortiz RosalesSiC44692-2HP-SISDoneSiC-230313Monday, March 13, 2023, 22:28
Total number of foils:380
  
  645   Tuesday, September 12, 2023, 09:54 Darwin Ortiz RosalesTaC41369-2HP-SISDoneTaC coating sinteringTuesday, September 12, 2023, 09:51
The coated container was wrapped
in 3 Ta foil heatshield and left in evap2
  
  651   Thursday, December 14, 2023, 09:58 Darwin Ortiz RosalesSiC41369-2HP-SISDone231208SiC conditioningThursday, December 14, 2023, 09:53
Target left pumping down in Evap2
overnight. 
 Screenshot_2023-12-14_133432.png 
  659   Friday, April 26, 2024, 06:19 Darwin Ortiz RosalesTaC45447-29HP-SISDoneTaC coating sintering


 Monday, April 29, 2024, 19:50
Started coating with coating stand.
  
  660   Wednesday, May 01, 2024, 11:54 Darwin Ortiz RosalesTaC25447-27HP-SISDoneTaC coating sinteringWednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields.
  
  680   Thursday, January 30, 2025, 09:21 Darwin Ortiz RosalesEmpty45447-30HP-SISDoneTaC coating sinteringThursday, January 30, 2025, 09:17
Left to pump down on previous night
The coated container was wrapped
  
  681   Saturday, February 01, 2025, 09:24 Darwin Ortiz RosalesEmpty45447-28HP-SISDoneTaC coating sinteringSaturday, February 01, 2025, 09:23
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2
  
  559   Monday, October 25, 2021, 11:53 Darwin Ortiz RosalesTaC 42218-4HP-IG-LISDoneTaC coating/sintering Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with
  
  368   Thursday, May 11, 2017, 11:25 Laura LambertEmpty41369-10HP-FEBIAD-CTLDoneRUSH! Sintering TaC coated container for SiC#36 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong
 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg 
ELOG V2.9.2-2455