ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  611   Wednesday, March 01, 2023, 21:49 Darwin Ortiz RosalesTa44692-3HP-SISDoneTaC coating sinteringWednesday, March 01, 2023, 21:46
Ta HP-SIS was coated
  
  613   Monday, March 06, 2023, 21:34 Darwin Ortiz RosalesSiC44692-3HP-SISDone230306SiC conditioningMonday, March 06, 2023, 21:29
Total number of foils:382
  
  615   Sunday, March 12, 2023, 08:06 Darwin Ortiz RosalesTa44692-2HP-SISDoneTaC coating sinteringSunday, March 12, 2023, 08:04
Ta HP-SIS was coated
  
  616   Monday, March 13, 2023, 22:31 Darwin Ortiz RosalesSiC44692-2HP-SISDoneSiC-230313Monday, March 13, 2023, 22:28
Total number of foils:380
  
  645   Tuesday, September 12, 2023, 09:54 Darwin Ortiz RosalesTaC41369-2HP-SISDoneTaC coating sinteringTuesday, September 12, 2023, 09:51
The coated container was wrapped
in 3 Ta foil heatshield and left in evap2
  
  651   Thursday, December 14, 2023, 09:58 Darwin Ortiz RosalesSiC41369-2HP-SISDone231208SiC conditioningThursday, December 14, 2023, 09:53
Target left pumping down in Evap2
overnight. 
 Screenshot_2023-12-14_133432.png 
  659   Friday, April 26, 2024, 06:19 Darwin Ortiz RosalesTaC45447-29HP-SISDoneTaC coating sintering


 Monday, April 29, 2024, 19:50
Started coating with coating stand.
  
  660   Wednesday, May 01, 2024, 11:54 Darwin Ortiz RosalesTaC25447-27HP-SISDoneTaC coating sinteringWednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields.
  
  559   Monday, October 25, 2021, 11:53 Darwin Ortiz RosalesTaC 42218-4HP-IG-LISDoneTaC coating/sintering Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with
  
  368   Thursday, May 11, 2017, 11:25 Laura LambertEmpty41369-10HP-FEBIAD-CTLDoneRUSH! Sintering TaC coated container for SiC#36 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong
 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg 
  371   Tuesday, May 16, 2017, 11:57 Laura LambertSiC41369-10HP-FEBIAD-CTLDoneSintering SiC#36 Tuesday, May 16, 2017, 10:56
Target container contains 460
 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg 
  410   Wednesday, May 23, 2018, 15:21 Laura LambertEmpty HP-FEBIAD-CTLDoneSintering TaC coating container for UCx#23Wednesday, May 16, 2018, 09:56
Container coated with TaC using
  
  37   Sunday, July 22, 2012, 20:51 John WongNiO38481-7HP-FEBIADDoneSintering NiO#1 Sunday, July 22, 2012, 20:30
The NiO target materials were loaded
into the container today.  
 NiO#1_sinteringevap2.pngNIO#1_TGHT_TBHT_250_220.pngSintered_NiO.GIFEndcap.GIF 
  43   Tuesday, August 14, 2012, 15:57 John WongSiC38295-8 HP-FEBIADDoneTesting endcaps inserted /w the new expansion toolTuesday, August 14, 2012, 15:44
This SiC target was prepared in May
2011 with the Evaporator#1.  The target
 vacuum_leaks.PNGTGHT_TBHT.png 
  60   Wednesday, March 06, 2013, 10:41 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal testWednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing
 CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf 
  61   Wednesday, March 06, 2013, 17:53 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test

    

       
            
 rampingup_1.PNGrampingup_2.PNGautorampingdown_23.PNG 
  62   Monday, March 11, 2013, 12:23 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 2 

    
 2013-03-11_Evap2_Second_Thermal_Test.pdf 
  63   Monday, March 11, 2013, 15:59 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test 2

    

       
            
 autorampingup_110.PNG 
  64   Wednesday, March 13, 2013, 16:08 Anders MjosEmpty38481-4HP-FEBIADDoneThermal testWednesday, March 13, 2013 
Thermocouple channels (see attached
PDF for photos)
 HP-FEBIAD-A_TC_at_fins.pdf 
  65   Thursday, March 14, 2013, 12:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 3 (w/o CTL block)Thursday, March 12, 2013 
The CTL was removed and target heated
to 580A / 300A
 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx 