Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32
|
John Wong wrote:
|
Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32  
|
Laura Lambert wrote:
|
Friday, December 16, 2016, 14:14, Laura Lambert, Ta, 39530-3, LP-FEBIAD, Done, Conditioning Ta FEBIAD target for shutdown tests 
|
Friday, December 16, 2016, 14:08
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides] |
Wednesday, November 29, 2017, 16:18, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL
|
Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today and currently pumping down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development. |
Wednesday, December 13, 2017, 10:55, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL
|
Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development. |
Monday, February 19, 2018, 14:16, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL
|
Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development. |
Thursday, March 08, 2018, 11:05, Marla Cervantes, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL
|
Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2 and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development. |
Wednesday, November 19, 2014, 15:10, Laura Lambert, Empty, 39530-2, LP-FEBIAD, Done, test#1. direct voltage and OMEGA temperature measurements ![test#1_TGHT_[without_vacuum].JPG test#1_TGHT_[without_vacuum].JPG](attachment.png)  
|
Wednesday, November 19, 2014, 15:10
currently pumping down
Wednesday, November 19, 2014, 15:28 |
Tuesday, January 31, 2017, 16:03, Laura Lambert, Empty, 39530-10, HP-FEBIAD, Done, Sintering TaC coated container for backup 
|
Tuesday, January 31, 2017, 13:43
Container coated with TaC using new method: Ends taped off, with liquid poured in and swirled
around entire container, then poured back out - 'flushing technique' |
Thursday, April 27, 2017, 15:54, Laura Lambert, SiC, 39530-10, HP-FEBIAD, In progress, Sintering SiC#36
|
Thursday, April 27, 2017, 14:01
Target container contains 470 discs of SiC
Target packed length = 16cm. |
Wednesday, May 03, 2017, 13:48, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Problems, Sintering SiC#36 
|
Laura Lambert wrote:
Thursday, April 27, 2017, 14:01 |
Wednesday, May 03, 2017, 16:09, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Problems resolved, Sintering SiC#36
|
Laura Lambert wrote:
|
Wednesday, May 03, 2017, 16:10, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Done, Sintering SiC#36 8x
|
Laura Lambert wrote:
|
Thursday, May 11, 2017, 11:36, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Done, Sintering SiC#36 - not SiC#36: now back-up [SiC#36 should be HP-FEBIAD-CTL!!!]
|
Laura Lambert wrote:
|
Wednesday, October 31, 2018, 19:35, Marla Cervantes, TaC, 39530-1, LP-FEBIAD, Done, TaC coating/sintering for graphite insert test 
|
Wednesday, October 31, 2018, 19:35
Container is coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Friday, November 02, 2018, 17:36, Marla Cervantes, Empty, 39530-1, LP-FEBIAD, Done, Graphite insert test #1
|
Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and syntered (e-log 421 Evaporator_2)
The container was loaded with an empty graphite insert. |
Wednesday, January 15, 2014, 17:45, John Wong, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container
|
Wednesday, January 15, 2014, 17:30
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min. |
Thursday, January 16, 2014, 13:06, Laura Lambert, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container
|
John Wong wrote:
Wednesday, January 15, 2014, 17:30 |
Friday, January 17, 2014, 09:34, John Wong, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container
|
Laura Lambert wrote:
|
Friday, January 17, 2014, 10:18, Laura Lambert, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container
|
John Wong wrote:
|
|