    Reply  Monday, May 13, 2013, 12:53, Nikita Bernier, BeO, , , Done, Sintering BeO pellets #6 600Down.png


    
        
            Nikita Bernier wrote:
        
        
            
             Tuesday, May 07, 2013, 16:48
    Reply  Monday, May 13, 2013, 17:17, Nikita Bernier, BeO, , , Done, Sintering BeO pellets #6 


    
        
            Nikita Bernier wrote:
        
        
            
            
            
              
Entry  Thursday, April 05, 2012, 16:40, Nikita Bernier, BeO, Target boat #2, , Done, Sintering BeO pellets #3 
Thursday, April 05, 2012, 16:31
Target boat contains 6 BeO pellets :
Sample,    Mass (g),   Thickness (mm),   Density (g/cm3)
    Reply  Tuesday, May 22, 2012, 16:45, Nikita Bernier, BeO, Target boat #2, , Done, Sintering BeO pellets #3 


    
        
            Nikita Bernier wrote:
        
        
            
            Thursday, April 05, 2012, 16:31
    Reply  Wednesday, May 23, 2012, 17:45, John Wong, BeO, Target boat #2, , Done, Sintering BeO pellets #3 past_5_hrs.JPGpast_21_hrs.pngpower_lost_2012-05-27_12_0630hr.pngTGHT_600A.pngTGHT@600A_past_12hr.JPG


    
        
            Nikita Bernier wrote:
        
        
            
            
            
              
    Reply  Tuesday, May 29, 2012, 15:43, Nikita Bernier, BeO, Target boat #2, , Failed, Sintering BeO pellets #3 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Monday, March 19, 2012, 17:10, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets 
 Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets with 30% PVB:
    Reply  Tuesday, March 20, 2012, 14:39, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets 


    
        
            Nikita Bernier wrote:
        
        
            
             Monday, March 19, 2012, 17:04
    Reply  Thursday, March 22, 2012, 00:34, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG


    
        
            Nikita Bernier wrote:
        
        
            
             Monday, March 19, 2012, 17:04
    Reply  Thursday, March 22, 2012, 17:56, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets 


    
        
            Nikita Bernier wrote:
        
        
            
             Monday, March 19, 2012, 17:04
Entry  Wednesday, September 26, 2012, 15:14, Nikita Bernier, BeO, , , Done, Sintering BeO Pellets #4 Sans_titre3.png
 Wednesday, September 26, 2012, 15:07
 
The samples were made of BeO powder with 30% PVB which was treated at 400 RPM for 26 minutes.
    Reply  Friday, September 28, 2012, 12:59, Nikita Bernier, BeO, , , Done, Sintering BeO Pellets #4 striptool7.pngstriptool8.PNGRetired.png


    
        
            Nikita Bernier wrote:
        
        
            
             Wednesday, September 26, 2012, 15:07
Entry  Monday, March 13, 2023, 22:31, Darwin Ortiz Rosales, SiC, 44692-2, HP-SIS, Done, SiC-230313 
Monday, March 13, 2023, 22:28
Total number of foils:380 ( including 5 analysis discs on the front side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
Entry  Monday, July 20, 2020, 19:25, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 2 of 2 
Monday, July 20, 2020, 19:27 
Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
Entry  Thursday, July 16, 2020, 11:15, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 1 of 2 
 Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
Entry  Tuesday, January 19, 2016, 14:27, John Wong, np-SiC, targetboat (TaC coated), TARGET BOAT, Done, SiC Nanofiber Heat Treatment  Screen_Shot_2016-01-19_at_2.15.32_PM.pngSiC_Nanofiber_1600.PNGScreen_Shot_2016-01-27_at_12.30.48_PM.png
 Tuesday, January 19, 2016, 14:19
SiC nanofiber was prepared at UBC Material Engineering Sci.  
4 samples are loaded in a Ta target contained (sintered with TaC coating): 
Entry  Monday, May 27, 2024, 07:12, Darwin Ortiz Rosales, SiC, , LP TUBE, Done, SiC (PAA dispersant experiment) 
Monday, May 27, 2024, 07:09
Small graphite cartridge was loaded with SiC discs 240523-1 and 240523-2.  Discs produced without milling using PAA as a dispersant.
The coated container tube was wrapped in four Ta foil heatshields.
Entry  Thursday, April 19, 2018, 12:38, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Round 2. Temp measurements for Aurelia target Ta#56 
 Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description and first round of heating.
Endcaps inserted and expanded.
Entry  Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1 
 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.  The pump couldn't get on full speed and eventually timed out.  Vacuum group inspected the pump
and it is time for a service.  
Entry  Tuesday, August 14, 2012, 15:11, John Wong, , , , Maintenance, Replacing Cu-heatshield insulators insulators.PNGMM800_insulator.PNG
Tuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are broken due to prolong heating time during the target processes (see attachment#1). 
The insulators are replaced with the MM800 type (see attachment #2). 