Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 21 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  374   Wednesday, June 14, 2017, 15:51 Laura LambertSiC40282-4TARGET BOATIn progressSintering SiC pellets Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla
and weighed.
  
  375   Friday, June 16, 2017, 10:42 Marla CervantesSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
  
  376   Friday, June 16, 2017, 15:14 Laura LambertSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
 20170619_111816.jpg20170619_111848.jpg 
  37   Sunday, July 22, 2012, 20:51 John WongNiO38481-7HP-FEBIADDoneSintering NiO#1 Sunday, July 22, 2012, 20:30
The NiO target materials were loaded
into the container today.  
 NiO#1_sinteringevap2.pngNIO#1_TGHT_TBHT_250_220.pngSintered_NiO.GIFEndcap.GIF 
  80   Thursday, August 08, 2013, 15:41 Laura LambertNiO39530-6HP-FEBIADIn progressSintering NiO # 2Thursday, August 08, 2013, 15:19
NiO target materials loaded into
the container yesterday.
 NiO#2.PNG 
  81   Thursday, August 08, 2013, 17:28 John WongNiO39530-6HP-FEBIADDoneSintering NiO # 2

    

       
            
  
  382   Wednesday, August 02, 2017, 16:12 Marla Cervantes 40282-5 DoneSintering La(OH)3/C pellets Monday, July 31, 2017,  
Pellets previously pressed by
  
  383   Friday, August 04, 2017, 10:52 Laura Lambert 40282-5TARGET BOATProblemsSintering La(OH)3/C pellets

    

       
            
 evap2_trip_8.4.2017.JPGevap2_trip_8.4.2017[2].JPGevap2_trip_8.4.2017[3].JPGevap2_trip_8.4.2017[4].JPG 
  384   Friday, August 04, 2017, 14:09 Laura Lambert 40282-5TARGET BOATDoneSintering La(OH)3/C pellets

    

       
            
  
  380   Wednesday, July 19, 2017, 13:55 Marla Cervantes 40282-5TARGET BOATDoneSintering La(OH)3/C discs Wednesday, July 19, 2017, 13:44
Discs previously casted by Marla
and Pauline and weighed. 
 170724-LaC2-CarbothermalReduction-EPICS-PLOTS.PNGIMG-20170725-WA0018.jpg 
  72   Tuesday, May 07, 2013, 16:53 Nikita BernierBeO  DoneSintering BeO pellets #6 Tuesday, May 07, 2013, 16:48
 
  
  73   Monday, May 13, 2013, 12:53 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
 600Down.png 
  74   Monday, May 13, 2013, 17:17 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
  
  16   Thursday, April 05, 2012, 16:40 Nikita BernierBeOTarget boat #2 DoneSintering BeO pellets #3Thursday, April 05, 2012, 16:31
Target boat contains 6 BeO
  
  26   Tuesday, May 22, 2012, 16:45 Nikita BernierBeOTarget boat #2 DoneSintering BeO pellets #3

    

       
            
  
  27   Wednesday, May 23, 2012, 17:45 John WongBeOTarget boat #2 DoneSintering BeO pellets #3

    

       
            
 past_5_hrs.JPGpast_21_hrs.pngpower_lost_2012-05-27_12_0630hr.pngTGHT_600A.pngTGHT@600A_past_12hr.JPG 
  29   Tuesday, May 29, 2012, 15:43 Nikita BernierBeOTarget boat #2 FailedSintering BeO pellets #3

    

       
            
  
  6   Monday, March 19, 2012, 17:10 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets
  
  8   Tuesday, March 20, 2012, 14:39 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  9   Thursday, March 22, 2012, 00:34 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
 voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG 
ELOG V2.9.2-2455