Entry  Thursday, January 14, 2016, 11:48, Laura Lambert, , , , Maintenance, Backing Pump Replaced 

 Thursday, January 14, 2016, 11:47

Backing pump was making very loud high pitched noises during last couple processes in the evaporator.

Replaced with a new one this morning.


 

Entry  Monday, January 11, 2016, 15:47, Laura Lambert, SiC, 41077-3, LP-SIS, Done, Conditioning SiC test target for test stand measurements Photo_2016-0-13.jpgPhoto_2016-01-13_#2.jpgPhoto_2016-01-13_#3.jpgPhoto_2016-01-13_#4.jpg

Monday, January 11, 2016, 15:25

Small center block LP-SIS container previously sintered with TaC coating

3x Ta heat shields

Container is loaded with 260 discs of SiC with a total length of 8.5cm

Loaded into evap2 and pumped down this morning

HS water valves opened up, no leaks detected

Tapped up manually to 30A

Vacuum stable

IGP1 = 1e-6 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively

Final setpoints: 400A for the TGHT and 230A for the TBHT

Final desired temperature: 1700C


 Tuesday, January 12, 2016, 12:55

TGHT = 138A, TBHT = 80A

IGP1 =  7.7e-6 Torr.


Vacuum stable and coming down.

Increasing ramping rate to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 Wednesday, January 13, 2016, 09:32

TGHT reached 400A ~11.5hrs ago

TBHT reached 230A ~8hrs ago

OMEGA = 1400C

IGP1 = 1.75e-7 Torr

Tapping up manually to 1700C...


 Wednesday, January 13, 2016, 10:14

Previous temperature measurement of OMEGA = 1400C is wrong due to window port being coated with SiC [see attached photos]

Will remain at TGHT = 420A for 4hrs then cool down this afternoon


Wednesday, January 13, 2016, 14:29

Remained at max setpoints for 4.5hrs.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Thursday, January 14, 2016, 09:47

Vented in air and opened up this morning

Target looks good

Will insert and expand endcaps this afternoon


 

Entry  Thursday, January 07, 2016, 09:19, Aurelia Laxdal, Ta, 41369-5, HP-SIS, In progress, Temperature measurements Jan_9_and_10_2016_measurements.docx

Temperature measurements in progress this week for Ta HP-SIS.

See attachment for the current settings and rampings of the TGHT/TBHT  for the temperature measurements taken on  Jan. 9-10, 2016 .

Note: TBHT PS tripped off on Jan. 9, 2016 (see first page of the attached file) and couldn't turn it ON again over the week-end.

    Reply  Friday, January 08, 2016, 11:15, Laura Lambert, Ta, 41369-5, HP-SIS, Done, Temperature measurements 

Aurelia Laxdal wrote:

Temperature measurements in progress this week for Ta HP-SIS.

 Friday, January 08, 2016, 10:49

Rh foil added.

endcaps inserted and expanded.

total length of target with end caps = 3.45cm

spot weld one thermocouple onto center block and one thermocouple onto target leg [left side wrt ionizer tube into page].


 see elog id# 268 for more info regarding measurements taken and state of TBHT power supply...


 

Entry  Wednesday, December 16, 2015, 10:22, Laura Lambert, Ta, 41369-5, HP-SIS, Done, Conditioning back-up Ta Target & emissivity measurements 

 Wednesday, December 16, 2015, 10:09

Target consists of 505 discs.

Total packed length 3.4cm.

*same parameters at Ta#46*

Total mass of target materials 53.9381g [4 packs of 20 with Ta wire + 425 single discs].

3 x Ta Heat shields.

No Re foil inserted.

No endcaps inserted.

Chamber pumped down overnight.

IGP1 = 5.1e-7 Torr.

Tapped up manually to 35A.

IGP1 = 5.2e-7 Torr.

Vacuum stable, initiating auto-ramp.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 239]


 Wednesday, December 16, 2015, 15:08

TBHT reached max setpoint of 230A, 3.3V

TGHT = 600A, 8.9V

IGP1 = 1.1e-6 Torr.

OMEGA = 1543C

Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.


 Wednesday, December 16, 2015, 16:02

TGHT = 700A, 10.6V

IGP1 = 2.1e-6 Torr.

OMEGA = 1740C

Tapping up manually to 1800C.


 Wednesday, December 16, 2015, 16:28

TGHT = 730A, 11.2V

Vacuum is coming down from IGP1 = 2.6e-6 Torr.

OMEGA = 1800C

Will condition the target at 1800C overnight and ramp down in the morning.


 Thursday, December 17, 2015, 09:31

OMEGA = 1802C on right side

Temp on leg of left side = 2150C, the hottest point - measured with the Mikron pyrometer.


 Friday, December 18, 2015, 08:53

Evap2 remained at 1800C for ~26.5hrs

Auto-ramped down to TGHT = 300A and TBHT = 90A at a rate of 2.0A/min and 1.0A/min respectively.

Conditioning complete.

TGHT will be ramped up later today for emissivity measurements.


 Monday, January 04, 2016, 11:21

the following was performed by aurelia.

emissivity measurements were taken late december.

evap2 was cooled down and left under vacuum over the xmas break.

currently ramping back up for more emissivity measurements.


 Friday, January 08, 2016, 10:47

Aurelia done measurements.

vented and opened this morning.


 

Entry  Monday, December 07, 2015, 09:06, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, emissivity measurements with no h.s on HP-FEBIAD container - round2 

 Monday, December 07, 2015, 09:04

No heat shields.

Container empty.

IGP1 = 1.1e-7 Torr.

Slope of OMEGA = 0.98

Tapped up manually to 35A.

Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

Final setpoints: TBHT = 90A, TGHT = 360A

Will tap up with the same parameters as last round to confirm results.


 Friday, December 11, 2015, 11:44

Took out of evap2 yesterday.

Aurelia took many emissivity measurements to compare with previous data - which matched up.

The dip in emissivity before going up again around ~560A could be due to oxidation of the materials.


 

Entry  Thursday, September 24, 2015, 09:48, Laura Lambert, Empty, 41077-5, , In progress, Sintering TaC coating container for UCx Target 

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 Thursday, September 24, 2015, 12:03

Vacuum spiking rapidly.

Stopped auto-ramp, tapped TGHT and TBHT down manually, allowing vacuum to stabilize.

IGP1 = 3.5e-6 Torr.

Re-initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 

    Reply  Thursday, September 24, 2015, 12:18, John Wong, Empty, 41077-5, LP-SIS, Done, Sintering TaC coating container for UCx Target Screen_Shot_2015-09-24_at_11.51.11_AM.png420A_1900.pngTaC_coat_sintered.png

Laura Lambert wrote:

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 

 Thursday, September 24, 2015, 12:04

 A few notes about the target container:The Ta-foil is cut in a full length of the target container, and that also covers up the back block, and the container is wrapped with 3 sheets (see attachment)

 The inner tube is coated with TaC, using the "flushing technique" - the coating looks much better; will see how it turns out after the sintering process

The target will be heated up to 1900C .  Due to the new wrapping of the Ta-heat shield, the heat distribution may be different.  So the target heater will be ramped up to achieve the desired temperature.  


Thursday, September 24, 2015, 18:45  

TGHT reached to 250A3.6V, TGHT at 230A and stayed for 1.5 hours.  Temp-L = 1280C, Temp-R = 1360C.  

Auto-ramp TGHT to 500A at 1A/min and heat at that current for overnight.  Will take temp reading tomorrow.  


Thursday, September 24, 2015, 23:08  

TGHT has reached to 500A/8.57V.  Temp-L = 1895C, Temp-R = 2073C. (Not sure why the temperature is real, will need to investigate more to get an absolute temp)

Just to be safe… Ramping down TGHT to 425A (according to e-log id 216, Temp-R reached to 1800C with TGHT at 425A/6.84V, but no temp measured for the left at that time)

Will check again later.


Friday, September 25, 2015, 11:52  

The target has been heated at 420A for ~12hours; temp measured ~1900C, slightly higher than the previous target container (W.O#40860-1); the Ta-wraping could affect the heat distribution.  

The temperature is also confirmed by using the 2-C digital pyrometer.  The tube inner surface is measured about 1900C, and the ionizer tube is about 2400C.  (see attachment #2).

Initiating auto-cooling at 2A/min for TGHT and 1A/min for TBHT.

The target will be inspected next Monday


 Wednesday, September 30, 2015, 16:01

The target container is fully sintered (see attachment#3) 

It is still in the discussion where this container will be used online for the UCx.  Nevertheless, the target contain is ready and it looks pretty good. 


 

       Reply  Tuesday, October 06, 2015, 15:18, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#1: Measuring temp with thermocouple (centre) & 2C-IR Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG

John Wong wrote:

Laura Lambert wrote:

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 

 Thursday, September 24, 2015, 12:04

 A few notes about the target container:The Ta-foil is cut in a full length of the target container, and that also covers up the back block, and the container is wrapped with 3 sheets (see attachment)

 The inner tube is coated with TaC, using the "flushing technique" - the coating looks much better; will see how it turns out after the sintering process

The target will be heated up to 1900C .  Due to the new wrapping of the Ta-heat shield, the heat distribution may be different.  So the target heater will be ramped up to achieve the desired temperature.  


Thursday, September 24, 2015, 18:45  

TGHT reached to 250A3.6V, TGHT at 230A and stayed for 1.5 hours.  Temp-L = 1280C, Temp-R = 1360C.  

Auto-ramp TGHT to 500A at 1A/min and heat at that current for overnight.  Will take temp reading tomorrow.  


Thursday, September 24, 2015, 23:08  

TGHT has reached to 500A/8.57V.  Temp-L = 1895C, Temp-R = 2073C. (Not sure why the temperature is real, will need to investigate more to get an absolute temp)

Just to be safe… Ramping down TGHT to 425A (according to e-log id 216, Temp-R reached to 1800C with TGHT at 425A/6.84V, but no temp measured for the left at that time)

Will check again later.


Friday, September 25, 2015, 11:52  

The target has been heated at 420A for ~12hours; temp measured ~1900C, slightly higher than the previous target container (W.O#40860-1); the Ta-wraping could affect the heat distribution.  

The temperature is also confirmed by using the 2-C digital pyrometer.  The tube inner surface is measured about 1900C, and the ionizer tube is about 2400C.  (see attachment #2).

Initiating auto-cooling at 2A/min for TGHT and 1A/min for TBHT.

The target will be inspected next Monday


 Wednesday, September 30, 2015, 16:01

The target container is fully sintered (see attachment#3) 

It is still in the discussion where this container will be used online for the UCx.  Nevertheless, the target contain is ready and it looks pretty good. 


 

 Tuesday, October 06, 2015, 15:09

After further discussion, we are going to reheat this container to 420A.  The temperature will be measured with the thermocouple - probe inside the centre of the tube - and the 2C-IR for comparison. 

This test is to ensure that the container is actually heated to 1900C before the UCx material can be loaded

The chamber has been pumped down to 1.92e-6 Torr.  Heat shield valve is open and no leaks are detected. 

Ramping up TBHT to 230A max and TGHT to achieve ~1900C


 Wednesday, October 07, 2015, 11:12

Yesterday...

TBHT ramped up to 230A and TGHT was at 160A before taking temperature readings. 

TGHT from 160A to 423A, IR2C temp reading increases linearly from 1138C to 1900C, whereas the thermocouple readouts are not quite linear, 1040C to 1748C (see attachment)

After 18 hours, both temp reader dropped about 45C. 

Increased TGHT to 440C, IR2C & thermocouple currently read 1912C & 1762C, respectively. 


 Wednesday, October 07, 2015, 12:28

Lowered TBHT to 200A and TGHT remained at 440A.  IR2C = 1900C, TypeC = 1745C.  Not much affect from TBHT. 

Will increase TBHT back to 230A, then start ramping down TGHT and taking temp readings. 


 Wednesday, October 07, 2015, 17:49

Stepped down TGHT to 160A and TBHT stayed at 230A.  Cooling down temp is generated.  See attachment. 

Notice the overall temp during cooling is lower than that during heating. 

TGHT and TBHT will be ramped down to 0A. 

Chamber will be vented tomorrow. 

More details later...


 

          Reply  Thursday, October 08, 2015, 12:26, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR Test_2_tempcurves.PNGTest1&2_IV_temp_.png

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 

 Thursday, September 24, 2015, 12:04

 A few notes about the target container:The Ta-foil is cut in a full length of the target container, and that also covers up the back block, and the container is wrapped with 3 sheets (see attachment)

 The inner tube is coated with TaC, using the "flushing technique" - the coating looks much better; will see how it turns out after the sintering process

The target will be heated up to 1900C .  Due to the new wrapping of the Ta-heat shield, the heat distribution may be different.  So the target heater will be ramped up to achieve the desired temperature.  


Thursday, September 24, 2015, 18:45  

TGHT reached to 250A3.6V, TGHT at 230A and stayed for 1.5 hours.  Temp-L = 1280C, Temp-R = 1360C.  

Auto-ramp TGHT to 500A at 1A/min and heat at that current for overnight.  Will take temp reading tomorrow.  


Thursday, September 24, 2015, 23:08  

TGHT has reached to 500A/8.57V.  Temp-L = 1895C, Temp-R = 2073C. (Not sure why the temperature is real, will need to investigate more to get an absolute temp)

Just to be safe… Ramping down TGHT to 425A (according to e-log id 216, Temp-R reached to 1800C with TGHT at 425A/6.84V, but no temp measured for the left at that time)

Will check again later.


Friday, September 25, 2015, 11:52  

The target has been heated at 420A for ~12hours; temp measured ~1900C, slightly higher than the previous target container (W.O#40860-1); the Ta-wraping could affect the heat distribution.  

The temperature is also confirmed by using the 2-C digital pyrometer.  The tube inner surface is measured about 1900C, and the ionizer tube is about 2400C.  (see attachment #2).

Initiating auto-cooling at 2A/min for TGHT and 1A/min for TBHT.

The target will be inspected next Monday


 Wednesday, September 30, 2015, 16:01

The target container is fully sintered (see attachment#3) 

It is still in the discussion where this container will be used online for the UCx.  Nevertheless, the target contain is ready and it looks pretty good. 


 

 Tuesday, October 06, 2015, 15:09

After further discussion, we are going to reheat this container to 420A.  The temperature will be measured with the thermocouple - probe inside the centre of the tube - and the 2C-IR for comparison. 

This test is to ensure that the container is actually heated to 1900C before the UCx material can be loaded

The chamber has been pumped down to 1.92e-6 Torr.  Heat shield valve is open and no leaks are detected. 

Ramping up TBHT to 230A max and TGHT to achieve ~1900C


 Wednesday, October 07, 2015, 11:12

Yesterday...

TBHT ramped up to 230A and TGHT was at 160A before taking temperature readings. 

TGHT from 160A to 423A, IR2C temp reading increases linearly from 1138C to 1900C, whereas the thermocouple readouts are not quite linear, 1040C to 1748C (see attachment)

After 18 hours, both temp reader dropped about 45C. 

Increased TGHT to 440C, IR2C & thermocouple currently read 1912C & 1762C, respectively. 


 Wednesday, October 07, 2015, 12:28

Lowered TBHT to 200A and TGHT remained at 440A.  IR2C = 1900C, TypeC = 1745C.  Not much affect from TBHT. 

Will increase TBHT back to 230A, then start ramping down TGHT and taking temp readings. 


 Wednesday, October 07, 2015, 17:49

Stepped down TGHT to 160A and TBHT stayed at 230A.  Cooling down temp is generated.  See attachment. 

Notice the overall temp during cooling is lower than that during heating. 

TGHT and TBHT will be ramped down to 0A. 

Chamber will be vented tomorrow. 

More details later...


 

Thursday, October 08, 2015, 12:01  

Test 2: To heat the target container back to ~440A and measure the temperature with the type C thermocouple (inside the tube, away from the centre block) and compared the temp reading with the 2C-IR.   

Chamber is currently being pump down, vac at 9e-6 Torr.  

Will ramp up TGHT to 160A and TBHT to 230A at 2A/min.


 Thursday, October 08, 2015, 17:01

TGHT is now at 440A, TBHT is constant at 230A - IR2C is reading the same as before, 1910C, but Type C is reading lower at 1770C.  (see attachment)

Will keep the current at 440A overnight. 


 Friday, October 09, 2015, 10:06

TGHT has stayed at 440A, TBHT at 230A for ~18hours.  R-temp dropped slightly from 1910C to 1890C and typeC dropped from 1770 to 1756; otherwise the measurements are reproducible. 

After the group discussion, the online heating curve will be re-calculated based on the temp reading from the IR2C curve. 

Next, the target container will be filled with UCx material and the conditioning current for Evap#1 will only go up to 440A (or at least the required current to reach the end of the re-carbonization step). 

So pay attention to the current when heating the target up in EVAP#1.

Initiate cooling at 2A/min for TGHT and 1A/min TBHT


 Friday, October 09, 2015, 11:35

A note about the voltage that may explain the change in the temperature: 

 

See attachment #2: 

Left plot = Test #1:

Initially TGHT ramped up to 423A and temp measured at 1900C.  Notice, about an hour later, there was a sudden drop in the voltage, and from thereon, the temp was measured at 1860C.  About 18 hours later, TGHT was increased to 440A to achieve 1910C.  

Right plot = Test #2 
Ramped up TGHT to 440A, temp measured 1910C.  At that constant current over the 6 hours period, the voltage slowly increased, and the temperature slightly dropped to 1895C.  


 

             Reply  Tuesday, December 01, 2015, 11:35, Anders Mjos, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx

 Data from thermocouple attached. Raw data and Excel sheet with plot.

Entry  Monday, November 30, 2015, 15:38, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, emissivity measurements with no h.s on HP-FEBIAD container emissivity_measurements.xlsx

 Monday, November 30, 2015, 15:37

No heat shields.

Container empty.

Loaded into evap2 and currently pumping down.


Tuesday, December 01, 2015, 10:07 

HS water valves opened this morning, no leaks detected.

IGP1 = 4.3e-7 Torr.

Slope of OMEGA = 0.98

Tapped up manually to 35A.

Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

Final setpoints: TBHT = 90A, TGHT = 360A

Once final setpoints reached, will tap up manually to max 1800C [legs = 2000C]


 Monday, December 07, 2015, 09:06

Container was tapped up manually with emissivity measurements taken every 50A starting at 360A.

The final measurement was taken at 640A.

Container was ramped down for the weekend.

See attachment for raw data.


 

 

Entry  Monday, November 23, 2015, 14:36, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, temp measurements with no h.s on HP-FEBIAD container temp_measurements.xlsx

Monday, November 23, 2015, 14:29

No heat shields.

Container empty.

Loaded into evap2 and currently pumping down.


 Tuesday, November 24, 2015, 09:36

HS water valves opened this morning, no leaks detected.

IGP1 = 4.5e-7 Torr.

Changed slope of OMEGA IR to 0.98 for empty container.

Tapped up manually to 35A.

IGP1 = 4.7e-7 Torr.

Vacuum stable, initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

Final setpoints: TBHT = 230A, TGHT = 300A

Will tap up manually to 2000C


 Tuesday, November 24, 2015, 14:00

TGHT = 300A, 3.75V

TBHT = 230A, 3.08V

IGP1 = 4.7e-7 Torr

No reading yet on the OMEGA.

Re-initiating auto-ramp to final setpoint TGHT = 450A


 Wednesday, November 25, 2015, 09:11

IGP1 = 3.0e-7Torr.

TGHT = 450A, 6.37V

Tapping up manually to 2000C


 Wednesday, November 25, 2015, 15:31

container was tapped up manually to 650A, slope/emissivity settings were checked.

ramped back down to 450A and tapped up manually while recording data up to 1800C [legs = 2000C]

once reached 1800C, tapped TBHT down manually to see relation of TBHT to temperature/ TGHT

remained at 1800C for ~1hr [while tapping down TBHT] before initiating auto-cool at 2.0A/min for the TGHT

see attachment for raw data.


 Thursday, November 26, 2015, 10:08

Vented in air and took out this morning.


 

Entry  Tuesday, November 10, 2015, 14:34, Laura Lambert, SiC, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container with SiC Evernote_Camera_Roll_20151110_110128.jpgEvernote_Camera_Roll_20151110_110129.jpgstriptool_screenshot_above_1700C.JPGtemp_measurements_on_LPSIS_(small_block)_container.xlsx

 Tuesday, November 10, 2015, 14:20

Container previously sintered with TaC coating and temperature measurements taken [see elog ID# 256, 257, 258]

3x Ta heat shields

2 packs of 5 SiC discs ~2inches from the end of the right side wrt ionizer tube into page.

Loaded into evap2 and currently pumping down.

see photos attached.


 Monday, November 16, 2015, 11:24

HS water valves opened up this morning, no leaks detected.

Tapped up manually to 35A.

Vacuum stable.

IGP1 = 3.4e-7 Torr.

Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.

Final setpoints: 250A for the TGHT and 230A for the TBHT


Monday, November 16, 2015, 13:29

Vacuum too high.

IGP1 = 2.9e-5 Torr.

Decreasing ramping rate down to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 Tuesday, November 17, 2015, 09:12

IGP1 = 1.45e-7 Torr.

TGHT = 250A, 3.28V

TBHT = 230A, 3.33V

OMEGA = 1194C

Tapping up manually to 1900C


 Tuesday, November 17, 2015, 11:22

Tapped up manually to 1800C, realized SiC should only be tapped up to 1700C, backed off immediately down to 415A from 460A/ 1800C.

See attachment for photo of striptool/ time spent above 1700C [~20min].


 Tuesday, November 17, 2015, 15:46

TGHT remained at 1700C for ~4hrs.

TGHT = 420A, 6.44V.

IGP1 = 2.3e-7 Torr.

Initiating cool-down at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

See attachment for raw data of temperature measurements.


 Wednesday, November 18, 2015, 13:32

Vented in air and took out this morning.

Looks good, no visual changes with the container.


 

Entry  Thursday, November 05, 2015, 16:20, Laura Lambert, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs 2015-11-02_16.03.10.jpg'temporary_endcap'_springs_nov.3_2015.jpgIMG_20151105_141239627_HDR.jpgIMG_20151105_141248901_HDR.jpg

 Thursday, November 05, 2015, 16:19

Springs coated with TaC and loaded into container for sintering.

3x Ta heat shield.

EVAP2 currently pumping down.


 Friday, November 06, 2015, 08:39

Opened HS water valves, no leaks detected.

Tapped up manually to 35A.

IGP1 = 5.5e-7 Torr.


 Friday, November 06, 2015, 10:08

IGP1 = 5.8e-7 Torr.

Vacuum stable.

Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.

See photos attached to view how springs were coated and loaded into container.


 Monday, November 09, 2015, 09:07

TGHT reached 450A, 7.2V ~8pm sat, nov 7th.

OMEGA = 1775C

IGP1 = 3.2e-7 Torr.

Tapping up manually to 1900C.


 

    Reply  Monday, November 09, 2015, 12:56, John Wong, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) 

Laura Lambert wrote:

 Thursday, November 05, 2015, 16:19

Springs coated with TaC and loaded into container for sintering.

3x Ta heat shield.

EVAP2 currently pumping down.


 Friday, November 06, 2015, 08:39

Opened HS water valves, no leaks detected.

Tapped up manually to 35A.

IGP1 = 5.5e-7 Torr.


 Friday, November 06, 2015, 10:08

IGP1 = 5.8e-7 Torr.

Vacuum stable.

Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.

See photos attached to view how springs were coated and loaded into container.


 Monday, November 09, 2015, 09:07

TGHT reached 450A, 7.2V ~8pm sat, nov 7th.

OMEGA = 1775C

IGP1 = 3.2e-7 Torr.

Tapping up manually to 1900C.


 

 Monday, November 09, 2015, 12:30

Checked the temp on the inner surface (not at the spring) of the container was around 2050C at 500A. 

The TaC coated spring is reading at 1900C; that's what the OMEGA is reading with the setting for 2-colors and slope at 0.98.

Lower TGHT to 450A/ 7.12V.

By comparing the data from the previous temp curve (OMEGA slope at 0.98) with no material inside the container,  the voltage and current plot is aligned with the curve.

Changed OMEGA setting slope to 1.04.  Current temp is reading at 1917C at 450A.

For 2-Color setting, the emissivity should be negligible.  That makes me believe that different materials has different slope setting for the temp reading.  

One thing to note is that, the sintering temp of TaC is around 1900-2000C.  It was clear that the container was fully sintered with TGHT at 450A.

Will need to gather more data with different material to understand the slope setting better. 

Try: 

SiC at 1700C, slope at 1.04

ZrC at 1900C, slope at 104

Ta at 1900C, slope at 0.98.

Compare the data...


 

       Reply  Monday, November 09, 2015, 14:22, Laura Lambert, , 41077-3, LP-SIS, Done, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) Evernote_Camera_Roll_20151110_113123.jpg

John Wong wrote:

Laura Lambert wrote:

 Thursday, November 05, 2015, 16:19

Springs coated with TaC and loaded into container for sintering.

3x Ta heat shield.

EVAP2 currently pumping down.


 Friday, November 06, 2015, 08:39

Opened HS water valves, no leaks detected.

Tapped up manually to 35A.

IGP1 = 5.5e-7 Torr.


 Friday, November 06, 2015, 10:08

IGP1 = 5.8e-7 Torr.

Vacuum stable.

Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.

See photos attached to view how springs were coated and loaded into container.


 Monday, November 09, 2015, 09:07

TGHT reached 450A, 7.2V ~8pm sat, nov 7th.

OMEGA = 1775C

IGP1 = 3.2e-7 Torr.

Tapping up manually to 1900C.


 

 Monday, November 09, 2015, 12:30

Checked the temp on the inner surface (not at the spring) of the container was around 2050C at 500A. 

The TaC coated spring is reading at 1900C; that's what the OMEGA is reading with the setting for 2-colors and slope at 0.98.

Lower TGHT to 450A/ 7.12V.

By comparing the data from the previous temp curve (OMEGA slope at 0.98) with no material inside the container,  the voltage and current plot is aligned with the curve.

Changed OMEGA setting slope to 1.04.  Current temp is reading at 1917C at 450A.

For 2-Color setting, the emissivity should be negligible.  That makes me believe that different materials has different slope setting for the temp reading.  

One thing to note is that, the sintering temp of TaC is around 1900-2000C.  It was clear that the container was fully sintered with TGHT at 450A.

Will need to gather more data with different material to understand the slope setting better. 

Try: 

SiC at 1700C, slope at 1.04

ZrC at 1900C, slope at 104

Ta at 1900C, slope at 0.98.

Compare the data...


 

 Monday, November 09, 2015, 14:20

IGP1 = 3.3e-7 Torr.

TGHT = 450A, 7.12V

OMEGA = 1915C

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, November 10, 2015, 13:23

Vented and opened this morning.

springs look [mostly] sintered.

see photo attached.

 

Entry  Monday, November 02, 2015, 16:29, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container temp_measurements_on_LPSIS_(small_block)_container.xlsx3xTa_h.s_-_striptool_voltage.JPG

 Monday, November 02, 2015, 16:28

Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256] and 2x Ta heat shield [see elog ID#257]

3x Ta heat shields on this container.

Loaded into evap2 and currently pumping down.


 Tuesday, November 03, 2015, 10:37

HS water valves opened up this morning, no leaks detected.

Tapped up manually to 35A.

Vacuum stable.

IGP1 = 6.8e-7 Torr.

Initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

Final setpoints: 250A for the TGHT and 230A for the TBHT


 Tuesday, November 03, 2015, 13:09

IGP1 = 7.7e-7 Torr

TGHT = 250A, 3.42V

TBHT = 185A, 3.0V

OMEGA = 1237C

Increasing ramping rate of TBHT to 2.0A/min.


 Tuesday, November 03, 2015, 13:47

Reached final setpoints.

IGP1 = 8.7e-7 Torr.

Tapping up manually to 1900C


 Tuesday, November 03, 2015, 15:45

Tapped up manually to 1900C

TGHT = 450A, 7.26V

IGP1 = 1.6e-6 Torr

Will remain at 450A overnight and ramp-down in the morning.


 Wednesday, November 04, 2015, 10:00

TGHT remained at 450A for ~18hrs.

IGP1 = 6e-7 Torr.

OMEGA = 1908C

See attachment for raw data of temperature measurements and picture showing voltage movement at max setpoint.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, November 04, 2015, 16:43

Vented and took out this afternoon.

Container looks good.

No visible changes to container compared to 2xTa heat shield temp measurements.


 

Entry  Monday, October 26, 2015, 16:17, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 2xTa h.s on LPSIS (small block) container 6x

 Monday, October 26, 2015, 16:16

Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256]

2x Ta heat shields on this container.

Loaded into evap2 and currently pumping down.


 Tuesday, October 27, 2015, 10:07

HS water valves opened up this morning, no leaks detected.

Tapped up manually to 35A.

Waited ~10min, vacuum stable

Initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

Final setpoints: 300A for the TGHT and 230A for the TBHT


 Tuesday, October 27, 2015, 13:54

Reached final setpoints.

IGP1 = 5.3e-7 Torr.

Tapping up manually to 1900C


Tuesday, October 27, 2015, 16:42

Tapped up manually to 1900C

TGHT = 455A, 7.66V

IGP1 = 9e-7 Torr

Will remain at 455A overnight and ramp-down in the morning.


Wednesday, October 28, 2015, 09:32 

TGHT remained at 455A for ~17hrs.

IGP1 = 4.3e-7 Torr.

OMEGA = 1888C

See attachment for raw data of temperature measurements.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, October 28, 2015, 16:32

Vented and took out this afternoon.

Container looks good. 

See photos attached.


 

Entry  Wednesday, October 21, 2015, 17:39, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 Friday, October 23, 2015, 16:15

TGHT reached to 500A and temp measured at 1940C.  More about the temp plot can be found in the dropbox.

Initiated cooling down at 2A/min. 

Target will be inspected next Monday.


 

    Reply  Thursday, October 22, 2015, 11:41, Laura Lambert, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

       Reply  Thursday, October 22, 2015, 17:10, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

Laura Lambert wrote:

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

 Thursday, October 22, 2015, 17:09

Pressure coming down to 1.5e-6 Torr. 

Increased ramping rate to 2A/min for both TGHT and TBHT.


 

          Reply  Monday, October 26, 2015, 16:14, Laura Lambert, Empty, 41077-3, LP-SIS, Done, Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

 Thursday, October 22, 2015, 17:09

Pressure coming down to 1.5e-6 Torr. 

Increased ramping rate to 2A/min for both TGHT and TBHT.


 

 Monday, October 26, 2015, 16:10

Target container was ramped down over the weekend and taken out today.

Coating looks good.

Will add on another Ta layer and continue with temperature measurements.

See attachment for raw data.


 

Entry  Tuesday, September 01, 2015, 17:20, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

    Reply  Wednesday, September 02, 2015, 11:28, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 Screenshot-1stsintering-prewindow_coating.JPG

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

       Reply  Tuesday, September 08, 2015, 15:56, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG

Laura Lambert wrote:

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

 Tuesday, September 08, 2015, 15:44

TGHT has stepped up to 820A.  Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right.  See attachment for The Temp (and Power) vs current plots.

Target will remained heated at the current and will be cooled down later today. 

 

The target will be re-conditioned up to 820A and temp and mass will be re-measured.

Plans:

The chamber will be vented tomorrow and the target will be taken out to weigh for mass change. 

The chamber windows will need to be clean.

A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).


 Tuesday, September 08, 2015, 17:37

TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating.  More coating on the right window is observed and temp reading came down to 1340C.  The left window remains the same and temp reads at 1646C.  

Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.  


 Wednesday, September 09, 2015, 12:27

Result after the sintering process:

No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C). 

Total green mass = 57.90g 

mass of graphite foil = 0.035g x 533 discs = 18.7g 

mass of green SiC = 39.30g 

Target container with SiC before sintered = 1455g 

Target container after sintered = 1450g 

mass loss ~ 5.0g ~ 13% organic mass, as expected!  

The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A. 


 

          Reply  Wednesday, September 09, 2015, 18:24, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 Screen_Shot_2015-09-09_at_5.53.15_PM.png

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

 Tuesday, September 08, 2015, 15:44

TGHT has stepped up to 820A.  Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right.  See attachment for The Temp (and Power) vs current plots.

Target will remained heated at the current and will be cooled down later today. 

 

The target will be re-conditioned up to 820A and temp and mass will be re-measured.

Plans:

The chamber will be vented tomorrow and the target will be taken out to weigh for mass change. 

The chamber windows will need to be clean.

A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).


 Tuesday, September 08, 2015, 17:37

TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating.  More coating on the right window is observed and temp reading came down to 1340C.  The left window remains the same and temp reads at 1646C.  

Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.  


 Wednesday, September 09, 2015, 12:27

Result after the sintering process:

No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C). 

Total green mass = 57.90g 

mass of graphite foil = 0.035g x 533 discs = 18.7g 

mass of green SiC = 39.30g 

Target container with SiC before sintered = 1455g 

Target container after sintered = 1450g 

mass loss ~ 5.0g ~ 13% organic mass, as expected!  

The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A. 


 

 Wednesday, September 09, 2015, 17:39

Both end-caps are inserted onto the targets.  The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.

Target is wrapped with 3 layers of heat shields.  

The extraction electrode is wrapped with Ta-foil (see attachment).  This is to trap any lose particle, if any.  

Chamber is currently being pumped down, currently at 1.2e-5 Torr.  


 

             Reply  Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

 Tuesday, September 08, 2015, 15:44

TGHT has stepped up to 820A.  Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right.  See attachment for The Temp (and Power) vs current plots.

Target will remained heated at the current and will be cooled down later today. 

 

The target will be re-conditioned up to 820A and temp and mass will be re-measured.

Plans:

The chamber will be vented tomorrow and the target will be taken out to weigh for mass change. 

The chamber windows will need to be clean.

A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).


 Tuesday, September 08, 2015, 17:37

TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating.  More coating on the right window is observed and temp reading came down to 1340C.  The left window remains the same and temp reads at 1646C.  

Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.  


 Wednesday, September 09, 2015, 12:27

Result after the sintering process:

No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C). 

Total green mass = 57.90g 

mass of graphite foil = 0.035g x 533 discs = 18.7g 

mass of green SiC = 39.30g 

Target container with SiC before sintered = 1455g 

Target container after sintered = 1450g 

mass loss ~ 5.0g ~ 13% organic mass, as expected!  

The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A. 


 

 Wednesday, September 09, 2015, 17:39

Both end-caps are inserted onto the targets.  The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.

Target is wrapped with 3 layers of heat shields.  

The extraction electrode is wrapped with Ta-foil (see attachment).  This is to trap any lose particle, if any.  

Chamber is currently being pumped down, currently at 1.2e-5 Torr.  


 

 Thursday, September 10, 2015, 09:55

HS water valves opened this morning, no leaks detected.

TGHT and TBHT tapped up manually to 35A.

IGP1 = 4.4e-7 Torr, vacuum stable.

Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.


 

                Reply  Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

 Tuesday, September 08, 2015, 15:44

TGHT has stepped up to 820A.  Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right.  See attachment for The Temp (and Power) vs current plots.

Target will remained heated at the current and will be cooled down later today. 

 

The target will be re-conditioned up to 820A and temp and mass will be re-measured.

Plans:

The chamber will be vented tomorrow and the target will be taken out to weigh for mass change. 

The chamber windows will need to be clean.

A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).


 Tuesday, September 08, 2015, 17:37

TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating.  More coating on the right window is observed and temp reading came down to 1340C.  The left window remains the same and temp reads at 1646C.  

Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.  


 Wednesday, September 09, 2015, 12:27

Result after the sintering process:

No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C). 

Total green mass = 57.90g 

mass of graphite foil = 0.035g x 533 discs = 18.7g 

mass of green SiC = 39.30g 

Target container with SiC before sintered = 1455g 

Target container after sintered = 1450g 

mass loss ~ 5.0g ~ 13% organic mass, as expected!  

The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A. 


 

 Wednesday, September 09, 2015, 17:39

Both end-caps are inserted onto the targets.  The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.

Target is wrapped with 3 layers of heat shields.  

The extraction electrode is wrapped with Ta-foil (see attachment).  This is to trap any lose particle, if any.  

Chamber is currently being pumped down, currently at 1.2e-5 Torr.  


 

 Thursday, September 10, 2015, 09:55

HS water valves opened this morning, no leaks detected.

TGHT and TBHT tapped up manually to 35A.

IGP1 = 4.4e-7 Torr, vacuum stable.

Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.


 

Thursday, September 10, 2015, 12:05  

Changed TGHT to 2A/min and TGHT remains at 1A/min.  Vacuum is table at 1.0e-6 Torr. 


Friday, September 11, 2015, 11:34  

TGHT was at 600A for almost 20 hours.  Vac at 5.2 e-7 Torr.   L-temp at 1490C, R-temp at 1685 (odd?).   Using pyrometer to measure - Right end does seem brighter than the L end.  

Continue to ramp up TGHT.  Date is collected, will be posted later.  


 Friday, September 11, 2015, 11:53

L/R-temp measurements just don't seem normal.  

Ramped up to 220A- temp reads L = 1522C, R = 1722C.  

Ramping down TBHT doesn't change the temp.  

Will cool TGHT/TBHT to 0A at 2A/min & 1A/min, respectively.  

Will vent the chamber on Monday and inspect for any wrong.


 Monday, September 14, 2015, 12:13

The target has taken out for inspection.  No visible damage/problem was observed.  The Ta-foil for loss particle capture only showed some heat marking but no material was trapped. 

Target was weighted, no mass loss was observed.

Try expending the end caps to get a good thermal conductivity and will re-conditiong again.  


 Tuesday, September 15, 2015, 12:31

The end caps have been expended. 

New Ta foils are used for the heat shields.  The foils are cut in 3 1/4" x 12" and wrapped around the target.  (see attachment).  This is to see if the heat is evenly distributed.  

Both omega optical lens are aligned properly.  

Target is installed but the chamber is NOT yet being pumped down.  Awaiting for the fume hood work in B2 level to be complete before the evaporator can be started. 


 Wednesday, September 16, 2015, 17:57

The work in the B2 level is done; the nuclear ventilation for the evaporators is now operational. 

Chamber is currently being pumped down.


 Thursday, September 17, 2015, 12:19

Chamber has been pump down overnight and pressure is currently at 5.8e-7 Torr.

HS valves are opened and no leaks are detected.

Ramping up TGHT/TBHT to 600A at 2A/min and 230A at 1A/min, respectively.


 Thursday, September 17, 2015, 17:58

TGHT has reached to 600A/9.14V.  Both the L and R temperatures are measured at 1710C and 1760C, respectively.  At 600A, the temperature now is about 300C higher compared to that during the sintering process. 

The difference in the temperature could be from Ta surface vs SiC surface.  (But the 2-color IR temp reader shouldn't matter what color it's measuring?!! I don't know!)

Note: 

Both temperature readings are fairly close.  Could this be improved from the new Ta-foils?  Possible!

It is still unclear what is the absolute temperature.  A more systematic student needs to be done. 

Using a thermocouple couple to measurement the endcaps at 600A and compared with the Omage reader may help to understand more. 

After discussing with Friedhelm, it is decided to stay the target at 600A for the conditioning process. 


 Friday, September 18, 2015, 09:10

Target has been heated at 600A at stable temperature at 1716C (LS) and 1769C (RS), see attachment. 


 Friday, September 18, 2015, 11:45

Initiated cooling down at 2A/min for TGHT, and 1A/min TBHT. 

Currently vac at 5.48e-7 Torr.


 Thursday, September 24, 2015, 11:31

Target was inspected after the 2nd conditioning, up to 1700C at 600A for overnight. 

No solid particle was observed that might have extracted from the ionizer tube.  

The heat shields have been removed and the target is ready for assembly. 


 

Entry  Tuesday, August 25, 2015, 11:54, Laura Lambert, Empty, , HP-FEBIAD, In progress, Sintering TaC coating container for SiC Target 

 Tuesday, August 25, 2015, 11:50

Container coated with TaC using new method: Ends tapped off,  with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'

Container is wrapped with 3 x Ta heat shields, not incl center block.

Loaded into EVAP2 and currently pumping down.


 Tuesday, August 25, 2015, 13:52

IGP1 = 2.2e-6 Torr.

HS water valves opened.

No leaks detected.

Tapped up manually to 35A.

Vacuum stable.

Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C


 Wednesday, August 26, 2015, 09:56

IGP1 = 8.8e-7 Torr.

TGHT = 260A, 3.0V

TBHT = 145A, 1.8V

Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, August 26, 2015, 14:15

IGP1 = 3.5e-6 Torr.

TGHT = 720A, 11.3V

TBHT = 230A, 3.2V

DV = 5.48V

OMEGA RS [right side-old port] = 1745C

OMEGA LS [left side-new port] = 1880C

Tapping up manually to achieve 1800C on OMEGA RS


 Wednesday, August 26, 2015, 14:44

IGP1 = 3.7e-6 Torr.

TGHT = 748A, 11.9V

DV = 5.78V

OMEGA RS = 1803C

OMEGA LS = 1935C


Thursday, August 27, 2015, 07:31

 Remained at max setpoints for ~17hrs.

IGP1 = 1.3e-6 Torr.

DV = 5.79V

OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]

OMEGA LS = 1955

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

    Reply  Thursday, August 27, 2015, 16:37, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating container for SiC Target 

Laura Lambert wrote:

 Tuesday, August 25, 2015, 11:50

Container coated with TaC using new method: Ends tapped off,  with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'

Container is wrapped with 3 x Ta heat shields, not incl center block.

Loaded into EVAP2 and currently pumping down.


 Tuesday, August 25, 2015, 13:52

IGP1 = 2.2e-6 Torr.

HS water valves opened.

No leaks detected.

Tapped up manually to 35A.

Vacuum stable.

Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C


 Wednesday, August 26, 2015, 09:56

IGP1 = 8.8e-7 Torr.

TGHT = 260A, 3.0V

TBHT = 145A, 1.8V

Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, August 26, 2015, 14:15

IGP1 = 3.5e-6 Torr.

TGHT = 720A, 11.3V

TBHT = 230A, 3.2V

DV = 5.48V

OMEGA RS [right side-old port] = 1745C

OMEGA LS [left side-new port] = 1880C

Tapping up manually to achieve 1800C on OMEGA RS


 Wednesday, August 26, 2015, 14:44

IGP1 = 3.7e-6 Torr.

TGHT = 748A, 11.9V

DV = 5.78V

OMEGA RS = 1803C

OMEGA LS = 1935C


Thursday, August 27, 2015, 07:31

 Remained at max setpoints for ~17hrs.

IGP1 = 1.3e-6 Torr.

DV = 5.79V

OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]

OMEGA LS = 1955

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

 Thursday, August 27, 2015, 16:34

Target is removed from the evaporator and inspected.  

The "flushing technique" has a much better result.  The inner coated surface is sintered well.  


 

Entry  Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1 

 Monday, August 24, 2015, 12:54

The turbo pump was found to be faulty.  The pump couldn't get on full speed and eventually timed out.  Vacuum group inspected the pump and it is time for a service.  

A new pump has been installed.  Leak  check was performed and no leaks were detected.  

Pump is now fully operational. 

Back in business…. 


 

Entry  Tuesday, August 18, 2015, 16:02, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 

Tuesday, August 18, 2015, 15:53

Target consists of 505 discs.

Total packed length 3.4cm.

Total mass 75.2772g.

Re foil inserted.

3x Ta Heat shields.

No endcaps inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]

*Note: Turbo Pump is on low speed


 Wednesday, August 19, 2015, 10:15

IGP1 = 8.3e-7 Torr.

Tapped up manually to 35A.

Initiating auto-ramp.


Wednesday, August 19, 2015, 15:55  

IGP1 = 3.3e-6 Torr.

TBHT reached max setpoint of 230A

TGHT reached max setpoint of 600A

OMEGA = 1554C

Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.


 

    Reply  Wednesday, August 19, 2015, 17:26, John Wong, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 

Laura Lambert wrote:

Tuesday, August 18, 2015, 15:53

Target consists of 505 discs.

Total packed length 3.4cm.

Total mass 75.2772g.

Re foil inserted.

3x Ta Heat shields.

No endcaps inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]

*Note: Turbo Pump is on low speed


 Wednesday, August 19, 2015, 10:15

IGP1 = 8.3e-7 Torr.

Tapped up manually to 35A.

Initiating auto-ramp.


Wednesday, August 19, 2015, 15:55  

IGP1 = 3.3e-6 Torr.

TBHT reached max setpoint of 230A

TGHT reached max setpoint of 600A

OMEGA = 1554C

Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.


 

 Wednesday, August 19, 2015, 17:13

TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C.  Vac is coming down from 4.2e-6 Torr. 

Stepping up TGHT to reach 1800C


Wednesday, August 19, 2015, 17:22

Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)

Will continue to condition the target at this temperature for overnight. 

Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.


 

       Reply  Thursday, August 20, 2015, 10:07, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 

John Wong wrote:

Laura Lambert wrote:

Tuesday, August 18, 2015, 15:53

Target consists of 505 discs.

Total packed length 3.4cm.

Total mass 75.2772g.

Re foil inserted.

3x Ta Heat shields.

No endcaps inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]

*Note: Turbo Pump is on low speed


 Wednesday, August 19, 2015, 10:15

IGP1 = 8.3e-7 Torr.

Tapped up manually to 35A.

Initiating auto-ramp.


Wednesday, August 19, 2015, 15:55  

IGP1 = 3.3e-6 Torr.

TBHT reached max setpoint of 230A

TGHT reached max setpoint of 600A

OMEGA = 1554C

Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.


 

 Wednesday, August 19, 2015, 17:13

TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C.  Vac is coming down from 4.2e-6 Torr. 

Stepping up TGHT to reach 1800C


Wednesday, August 19, 2015, 17:22

Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)

Will continue to condition the target at this temperature for overnight. 

Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.


 

 Thursday, August 20, 2015, 08:27

OMEGA = 1830C

Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.

IGP1 = 1.5e-6 Torr.

EVAP2 has been sitting at max setpoints for ~15hours.

Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

          Reply  Thursday, August 20, 2015, 17:15, John Wong, Ta, , HP-SIS, Done, Conditioning Ta#46 Target 

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

Tuesday, August 18, 2015, 15:53

Target consists of 505 discs.

Total packed length 3.4cm.

Total mass 75.2772g.

Re foil inserted.

3x Ta Heat shields.

No endcaps inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]

*Note: Turbo Pump is on low speed


 Wednesday, August 19, 2015, 10:15

IGP1 = 8.3e-7 Torr.

Tapped up manually to 35A.

Initiating auto-ramp.


Wednesday, August 19, 2015, 15:55  

IGP1 = 3.3e-6 Torr.

TBHT reached max setpoint of 230A

TGHT reached max setpoint of 600A

OMEGA = 1554C

Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.


 

 Wednesday, August 19, 2015, 17:13

TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C.  Vac is coming down from 4.2e-6 Torr. 

Stepping up TGHT to reach 1800C


Wednesday, August 19, 2015, 17:22

Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)

Will continue to condition the target at this temperature for overnight. 

Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.


 

 Thursday, August 20, 2015, 08:27

OMEGA = 1830C

Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.

IGP1 = 1.5e-6 Torr.

EVAP2 has been sitting at max setpoints for ~15hours.

Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

 Thursday, August 20, 2015, 17:14

Target was removed the the evaporator and inspected.  It looks good! 

Ta-heat shields are removed. 

End caps are inserted but need to be expended.

Ready for assembly.


 

Entry  Thursday, August 06, 2015, 15:45, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on Ta endcaps round2_july_batch_(1).jpground2_july_batch_(2).jpground2_july_batch_(3).jpgsingle_round_sintering_(1).jpgsingle_round_sintering_(2).jpg

 Thursday, August 06, 2015, 15:36

The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.

The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158]

There are two separate tubes in the target boat:

1) endcaps coated with TaC coating - never been sintered

2) previously sintered [but not fully] endcaps with a second coating done on the one side of each endcap

The boat is wrapped with 3-layers of Ta heatshields.

Chamber is currently being pumped down.


 Friday, August 07, 2015, 08:45

HS water valves opened, no leaks detected.

IGP1 = 3.6e-7 Torr.

Tapped up manually to 30A.


 Friday, August 07, 2015, 11:23

IGP1 = 2.2e-6 Torr.

Vacuum stable.

Initiating auto-ramp at 0.2A/min with a final setpoint of 480A.

Will ramp up over the weekend, confirm temperature readings on monday and tap up to final desired temperature of 1800C manually.


 Friday, August 07, 2015, 13:04

Vacuum climbed quite fast.

IGP1 = 6.3e-6 Torr.

Stopped auto-ramp to allow vacuum to settle.

Waited ~1hr.

IGP1 = 4.3e-6 Torr.

Re-initiating auto-ramp.


 Monday, August 10, 2015, 09:22

TGHT reached 480A, 8.2V on the weekend.

OMEGA = 1708C

IGP1 = 3.8e-7 Torr.

Tapped up manually to 1803C, 520A, 9.0V

IGP1 = 5.9e-7 Torr.


 Monday, August 10, 2015, 14:50

EVAP2 remained at 1800C for 4.5hours.

Internal temperature taken at new window port read 1800C using the mikron.

Initiating auto-cool at 2.0A/min.


 Tuesday, August 11, 2015, 09:23

Vented in air and opened up this morning.

The following observations were noted:

1) single round sintered endcaps:

-Batch of green endcaps, single round of sintering look good. fully sintered.

-however when applying a scratch test, excess TaC scrapes off.

[see single round sintering photos]

2) Re-sintering of batch from july 14th
-Outside of endcap [concave side] was re-coated, Inside of endcap had good first coating - therefore no second coating applied [see photos from elog ID#230]

-A few endcaps almost heated too long and started to appear brittle/ further crystallization on inside of endcap - the side that did not have a second coating applied.

-Outside of endcap looks good/ fully sintered - the side that had a second round of TaC coating

-further tests confirm this batch should still be okay to use

[see round2 batch photos]


 

 

Entry  Friday, July 31, 2015, 15:51, John Wong, Ta, , TARGET BOAT, In progress, Test for homogeneity: Sintering TaC coating on a Ta tube Screen_Shot_2015-07-31_at_3.46.10_PM.png

 Friday, July 31, 2015, 15:39

A Ta tube was coated with TaC.  The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating.  The outer layer of the tube was brushed with TaC. 

The tube is installed in a target boat and wrapped with 3 layers of heat shields.  

Chamber is currently pumped down and the target heater will be ramped up after the long weekend (Tue)

A new window port is installed (see photo).  TGHT will need to be ramped up slowly to make sure the new window can sustain the heat shine from the target - local check on the Evap is required to make sure it's safe to keep ramping up the heater.     


 

    Reply  Tuesday, August 04, 2015, 12:04, Laura Lambert, Ta, , TARGET BOAT, Done, Test for homogeneity: Sintering TaC coating on a Ta tube Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg

John Wong wrote:

 Friday, July 31, 2015, 15:39

A Ta tube was coated with TaC.  The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating.  The outer layer of the tube was brushed with TaC. 

The tube is installed in a target boat and wrapped with 3 layers of heat shields.  

Chamber is currently pumped down and the target heater will be ramped up after the long weekend (Tue)

A new window port is installed (see photo).  TGHT will need to be ramped up slowly to make sure the new window can sustain the heat shine from the target - local check on the Evap is required to make sure it's safe to keep ramping up the heater.     


 

Tuesday, August 04, 2015, 11:26

HS water valves opened, no leaks detected.

IGP1 = 2.2e-7 Torr.

Tapped up manually to 30A.

IGP1 = 2.7e-7 Torr.

Initiating auto-ramp at 0.2A/min with a final value of 350A.


 Tuesday, August 04, 2015, 15:30

IGP1 = 2.8e-6 Torr.

TGHT = 79A.

Increasing ramping rate to 0.5A/min


 Wednesday, August 05, 2015, 15:25

EVAP2 reached 350A this morning, OMEGA = 1414C

Temperature measurements were taken using the FLUKE IR camera of the new window port to be used for the second OMEGA camera.

Measurements were taken of both the Cu seal on the inside of the window and in the centre of the window [the hottest point].

TGHT was ramped up at 2.0A/min from 1414C --> 1800C with auto ramp paused at each measurement reading taken.

See attachment for raw data.

TGHT remained at 500A/1800C for 4hrs and will be cooled down at a rate of 2.0A/min.


 Thursday, August 06, 2015, 15:32

Vented and opened today.

New window port passed inspection, max temperature reached = 32.4C

Coating on tube looks good, partial sintering. Internal sintered better than outside of tube.

See attached photos.


 

Entry  Friday, July 31, 2015, 15:10, John Wong, , , , Maintenance, Installed leftside port 

Friday, July 31, 2015, 15:09

The left side port was installed on the evaporator #2.  Leak check was performed and no leak was detected. 


 