359
|
Thursday, April 20, 2017, 12:45 |
John Wong | np-SiC | | TARGET BOAT | In progress | Higher Temp Treament: B3-92Mpa pellets | Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta boat and wrapped with heat shield (1 long piece, 3 rounds): 2x of B3-92Mpa pellets and 10% pure PAN pellet as control. See lab book page 32 for more details.
The B3-92Mpa pellets were previously heated to 1550C (TGHT 400A/6.94V), see elog#351
Attempting to heat samples up to 1800C to determine the weight loss and shrinkage.
Est. TGHT 480A.
OK to auto ramp to 400A at 1A/min. Check for coating on the window.
Chamber is currently being pumped down.
Thursday, April 20, 2017, 14:28
Pressure 3.14e-6 Torr. Auto ramp TGHT at 1A/min to reach 400A.
Friday, April 21, 2017, 10:56
TGHT at 400A/6.75V, temp at 1475C (75C/0.19V lower).
Tapping up TGHT
Friday, April 21, 2017, 12:32
TGHT ramped up to 530A/9.85V, temp at 1800C.
Friday, April 21, 2017, 15:38
TGHT dropped slightly, no coating on windows.
Checked with Mikron, agreed with the dropped temp.
Tapped up TGHt to 545A/10.1V to reach 1800C. Will keep at that temp for several days.
Wednesday, April 26, 2017, 17:06
Samples have been heated at 1800C (-25C) for 7 days now (see attachment for archiver).
Cooling down TGHT at 1A/min.
|
Attachment 1: B3_PAN_pellets_1800c.JPG
|
|
|
358
|
Thursday, April 13, 2017, 12:03 |
Laura Lambert | SiC | | TARGET BOAT | Done | Sintering SiC pellets | Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is placed inside a previously TaC coated boat.
Boat is wrapped with 3x Ta heat shields.
Loaded into evap2.
Chamber currently pumping down.
Tuesday, April 18, 2017, 13:53
HS water valves were opened this morning, no leaks detected.
Tapped up manually to 100A, 1.28V
Vacuum stable.
IGP1 = 3.63e-6 Torr.
Initiating auto ramp at a rate of 1.0A/min to 150A
Final desired temperature of 1100C
Tuesday, April 18, 2017, 14:57
TGHT = 150A, 2.08V
Still no temperature reading on OMEGA.
Vacuum stable, IGP1 = 1.16e-6 Torr.
Initiating auto ramp at the same rate of 1.0A/min up to 200A.
Tuesday, April 18, 2017, 15:56
TGHT = 200A, 2.91V
OMEGA = 990C
IGP1 = 8.59e-7 Torr
Tapping up manually to 1100C...
Wednesday, April 19, 2017, 08:34
TGHT = 235A, 3.47V
OMEGA = 1090C
IGP1 = 1.6e-7 Torr.
Has remained at ~1100C since 16:30 yesterday.
Intitiating auto-cool at 2.0A/min
Thursday, April 20, 2017, 08:40
Vented in air and taken out yesterday.
Pellets look good.
No obvious colour change.
|
Attachment 1: IMG_1657.JPG
|
|
Attachment 2: IMG_1659.JPG
|
|
|
357
|
Thursday, April 06, 2017, 13:16 |
Laura Lambert | Empty | 40282-2 | TARGET BOAT | Done | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Thursday, April 06, 2017, 13:16
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited almost 2hrs
IGP1 = 9.9e-7 Torr
Initiating auto-ramp at 0.2A/min to 400A
Final desired temperature = 1900C
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Monday, April 10, 2017, 09:26
IGP1 = 1.79e-7 Torr
TGHT = 400A, 6.47V
OMEGA = 1505C
Tapping up manually to 1900C...
Monday, April 10, 2017, 11:46
TGHT tripped off at 410A, ~1530C
Water is still on and good flow.
Vacuum was stable ~1.8e-7 Torr.
No power trips according to controls.
Not sure of reasoning behind trip.
Initially tried tapping back-up, no current was being applied.
Turned off and back on TGHT power supply - this restarted things and now works again.
Have tapped back up to 35A, vacuum still good.
Restarting auto-ramp to 400A at 1.0A/min
Monday, April 10, 2017, 13:13
Vacuum looks good.
IGP1 = 1.1e-7 Torr
TGHT = 127A, 1.30V
Increasing ramping rate to 2.0A/min
Monday, April 10, 2017, 16:08
IGP1 = 1.5e-7 Torr
TGHT = 400A, 6.24V
OMEGA = 1510V
Increasing auto ramp setpoint to 450A at a rate of 0.2A/min
Wednesday, April 12, 2017, 11:06
IGP1 = 2.96e-7 Torr
TGHT = 555A, 9.74V
OMEGA = 1935C
Has remained at max setpoints overnight.
Initiating auto-cool at 2.0A/min
Thursday, April 13, 2017, 11:59
vented in air and opened up this morning.
container looks good.
see photo attached.
|
Attachment 1: IMG_1653.JPG
|
|
|
356
|
Thursday, April 06, 2017, 11:15 |
Laura Lambert | Empty | | TARGET BOAT | Problems resolved | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Attachment 1: IMG_1615.JPG
|
|
Attachment 2: IMG_1611.JPG
|
|
|
355
|
Thursday, April 06, 2017, 08:57 |
Laura Lambert | Empty | | TARGET BOAT | Problems | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Attachment 1: Capture.JPG
|
|
|
354
|
Wednesday, April 05, 2017, 15:42 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on evap1 target boat | Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
|
353
|
Friday, March 31, 2017, 12:22 |
John Wong | np-SiC | | TARGET BOAT | In progress | Thermo test: B3 Pellets (13.3K-PSI) | Friday, March 31, 2017, 12:21
Two compressed pellets loaded into the target boat and wrapped with Ta foil. (see lab book p32 for details).
Chamber is pumping down.
Desired temp 1550C, TGHT expected to be around 400A.
Friday, March 31, 2017, 16:31
Auto-ramp at 0.5A/min to reach 350A.
Saturday, April 01, 2017, 12:30
TGHT reached to 350A/5.7V, temp around 1200C - notice voltage is much lower than previous process (ID 351), possible target/heat shield shorted therefore lower temp observed. (This should not cause any damage to the container.)
Continue to ramp up to 400A. Notice some evolution of gasses similar to the previous process (ID351) during ramping up of TGHT around 220A . (see attachment1)
Saturday, April 01, 2017, 13:52
TGHT reached to 400A/6.7V; temp stabilized at 1400C.
Tap up to 1550, TGHT 456A/8.08V (3.7KW, about 1KW higher than before).
Pressure coming down (see attachment 2)
Hold temp for several days.
Saturday, April 01, 2017, 17:22
Temp went up by 10C. Lowered TGHT to 450A.
|
Attachment 1: heating_curve_00.JPG
|
|
Attachment 2: heating_curve_13PSI_pellets_01.JPG
|
|
|
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield foils and installed by JW
Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T
Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.
Monday, March 13, 2017, 15:54: Started auto-ramping to TGHT / TBHT 150 / 75 A at 1 / 0.5 A/min. Good/bad vacuum 3 / 4 E-5 Torr
Tuesday, March 14, 2017, 08:23: Continue auto-ramping to TGHT / TBHT 300 / 150 A. Vacuum stable at IG1 2.3E-7 T
Tuesday, March 14, 2017, 11:18: Continue auto-ramping to TGHT / TBHT 350 / 200 A. Vacuum stable at IG1 3.8E-7 T
Wednesday, March 15, 2017, 08:31: Continue auto-ramping to TGHT 375. Vacuum stable at IG1 2.5E-7 T. Omega at 1500 C
Wednesday, March 15, 2017, 16:34: Continue auto-ramping to TGHT 500. Vacuum increased to IG1 5.5E-7 T. Omega at 1887 C
Thursday, March 16, 2017, 08:34: Continue auto-ramping to TGHT 520. Vacuum increased to IG1 3.3E-7 T. Omega at 1888 C
Thursday, March 16, 2017, 08:48: TGHT at 521 A 8.99 V. Omega at 1899 C
Friday, March 17, 2017, 08:25: TGHT at 521 A 8.88 V. Omega at 1886 C. Vacuum IG1 2.5E-7 Torr
Ramping down
Wednesday, March 22, 2017, 08:42: Turbo pump stopped |
|
351
|
Saturday, March 11, 2017, 11:58 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test B3 Pellets | Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into the container for thermo test.
(see lab book1 Pg 26, 28-30 for more detail about the materials)
Desired temp ~1500C; one long-sheet of Ta foil is used, est 400A.
Auto ramping 0.5A/min to 300A first. Check later...
Saturday, March 11, 2017, 11:58
Increased TGHT from 300A to 350A last night at ramping rate of 0.5A/min.
Tapped up further from 350A to 400A, 6.92V (2.8kW), Temp measured at ~1550C.
Pressure peaked at 1.5e-6 Torr and coming down when ramping TGHT from 350A to 400A. (see attachment1)
Will remain at the current. Continue monitoring..
Monday, March 13, 2017, 01:14
Temp was held at 1550C for about 1.5days. Vac stabilized at 3.08e-7 torr. TGHT 400A/6.94V.
Initiated cooling at 1A/min.
Next, Materials inspection.
Monday, March 13, 2017, 11:24
Target has been at room temp for about 4 hours. Venting chamber.
|
Attachment 1: heating_curve_900PSI_pellet.JPG
|
|
|
350
|
Tuesday, February 21, 2017, 15:21 |
Laura Lambert | Empty | 42218-1 | LP-IG-LIS | Done | sintering TaC coating on UCx#20 container | Tuesday, February 21, 2017, 15:19
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Wednesday, February 22, 2017, 09:41
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited ~45min
Vacuum stable.
IGP1 = 1.2e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, February 24, 2017 by Anders
Continue manually to 1900 C
Friday, February 24, 2017, 16:24: TGHT at 400 A 6.35V IG1 = 4.5e-7 Torr 1660 C
Friday, February 24, 2017, 16:57: TGHT at 410 A 6.6 V IG1 = 5.0e-7 Torr 1700 C
Sunday, February 26, 2017 by Anders
Sunday, February 26, 2017, 14:13: TGHT at 425 A 6.9 V IG1 = 2.5e-7 Torr
Lab closed for weekend. No access to temp reading.
Monday, February 27, 2017, 16:12
Tapped up manually to 1900C this morning.
TGHT = 490A, 8.14V
TBHT = 230A, 2.98V
MIKRON = 1911C
OMEGA = 1904C
evap2 has remained at max setpoints for ~6hrs
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, February 28, 2017, 11:57
Container finished sintering.
Vented in air and opened up this morning.
Container looks good
|
Attachment 1: IMG_1562.JPG
|
|
Attachment 2: IMG_1564.JPG
|
|
|
349
|
Tuesday, February 14, 2017, 15:48 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps and springs |
Laura Lambert wrote: |
Laura Lambert wrote: |
Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Tuesday, February 14, 2017, 15:43
Heatshield was ground back and target boat now fits nicely into heatshield without contact.
|
Tuesday, February 14, 2017, 15:44
Boat with endcaps and springs reloaded today and pumped back down this afternoon.
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Vacuum stable.
IGP1 = 3.5e-6 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 400A.
Final desired temperature = 1800C
Wednesday, February 15, 2017, 10:24
IGP1 = 7.2e-7 Torr
TGHT = 260A, 3.95V
OMEGA = 1158C
Vacuum stable.
Increasing ramping rate to 1.0A/min.
Wednesday, February 15, 2017, 13:02
IGP1 = 2.0e-6 Torr
TGHT = 400A, 6.67V
OMEGA = 1530C
Increasing final setpoint to 450A
Wednesday, February 15, 2017, 13:55
IGP1 = 2.5e-6 Torr
TGHT =450A, 7.7V
OMEGA = 1640C
Increasing final setpoint to 500A
Wednesday, February 15, 2017, 15:13
IGP1 = 1.8e-6 Torr
TGHT = 500A, 8.59V
OMEGA = 1770C
MIKRON = 1740C
Tapping up manually to ~1800C...
Thursday, February 16, 2017, 09:09
IGP1 = 5.28e-7 Torr
TGHT = 520A, 9.1V
OMEGA = 1821C
Target boat has remained at max setpoints for 17.5hrs.
Initiating auto-cool at 1A/min
Thursday, February 16, 2017, 13:49
Increasing auto-cool to 2.0A/min
Friday, February 17, 2017, 16:00
Vented in air and opened up today.
Endcaps looks good see photos attached
|
Attachment 1: IMG_1542.JPG
|
|
Attachment 2: IMG_1545.JPG
|
|
Attachment 3: IMG_1549.JPG
|
|
Attachment 4: IMG_1552.JPG
|
|
|
348
|
Tuesday, February 14, 2017, 15:44 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems resolved | Sintering TaC coating on Ta endcaps and springs |
Laura Lambert wrote: |
Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Tuesday, February 14, 2017, 15:43
Heatshield was ground back and target boat now fits nicely into heatshield without contact.
|
|
347
|
Thursday, February 09, 2017, 23:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermotest: SiC-SiO2-Lys and SiC pellets | Thursday, February 09, 2017, 23:26
There are two types of samples being test for thermal stability:
1. SiC-SiO2-Lys nanofiber mats
2. SiC pellets
(see Lab Book for more info)
Desired temperature: ~1500C
One-Ta heat shield is used, est. TGHT 450A.
Thursday, February 09, 2017, 23:38
TGHT currently at 322A/5.28V, OMEGA 1204C.
Vac 2.9e-6 Torr.
Friday, February 10, 2017, 08:58
TGHT at 400A, temp at 1425C for 8 hours.
Decided to cool down for analysis. Check for carboreduction for SiO2 at 1400C. Then continue to ramp up to 1500C.
Ramping down at 2A/min
Friday, February 10, 2017, 10:47
Rapid out-gas (2.7e-6 to 3.8e-6 Torr) from TGHT 330A until current stopped at 400A (see attachment). Could be the evolution of O2 from SiO2...
|
Attachment 1: striptool_01.JPG
|
|
|
346
|
Thursday, February 09, 2017, 11:49 |
Laura Lambert | | | | Maintenance | New heatshield with flexible water lines | Thursday, February 09, 2017, 11:47
A new heatshield with flexible water lines has been put into evap2 last Friday Feb3rd
|
|
345
|
Monday, February 06, 2017, 11:17 |
Anders Mjos | | | | Problems resolved | IOC restart after power outagae | Dave Morris did a remote restart of the IOC after the outage. Turbo pump started. |
|
344
|
Friday, February 03, 2017, 14:18 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps and springs | Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Attachment 1: IMG_1526.JPG
|
|
Attachment 2: IMG_1527.JPG
|
|
|
343
|
Tuesday, January 31, 2017, 16:03 |
Laura Lambert | Empty | 39530-10 | HP-FEBIAD | Done | Sintering TaC coated container for backup | Tuesday, January 31, 2017, 13:43
Container coated with TaC using new method: Ends taped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, January 31, 2017, 16:02
IGP1 = 3.9e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 450A and TBHT = 230A, with final desired temp of 1900C
OMEGA slope = 0.98
Wednesday, February 01, 2017, 10:01
IGP1 = 5.7e-7 Torr.
TGHT = 254A, 3.0V
TBHT = 142A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, February 01, 2017, 11:48
IGP1 = 1.7e-6 Torr.
TGHT = 450A, 6.27V
TBHT = 230A, 3.14V
OMEGA = 1176C
Increasing max setpoint of TGHT = 600A
Wednesday, February 01, 2017, 13:09
IGP1 = 3.7e-6 Torr.
TGHT = 600A, 9.0V
TBHT = 230A, 3.18V
OMEGA = 1480C
Increasing max setpoint of TGHT = 700A
Wednesday, February 01, 2017, 14:08
IGP1 = 3.8e-6 Torr.
TGHT = 700A, 10.96V
TBHT = 230A, 3.2V
OMEGA = 1705C
Increasing max setpoint of TGHT = 750A
Wednesday, February 01, 2017, 15:02
IGP1 = 5.1e-6 Torr.
TGHT = 750A, 11.87V
TBHT = 230A, 3.2V
OMEGA = 1808C
Increasing max setpoint of TGHT = 800A
Wednesday, February 01, 2017, 15:30
IGP1 = 6.6e-6 Torr.
TGHT = 800A, 12.86V
TBHT = 230A, 3.2V
OMEGA = 1903C
Will remain at max setpoints overnight.
Thursday, February 02, 2017, 09:16
Remained at max setpoints for ~18hrs.
IGP1 = 9.5e-7 Torr.
OMEGA =1914C
TGHT = 800A, 12.83V
TBHT = 230A, 3.22V
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Friday, February 03, 2017, 14:24
Vented in air and opened up this morning
Coating looks good.
See photos attached.
|
Attachment 1: 39530-10(1).JPG
|
|
Attachment 2: 39530-10(2).JPG
|
|
|
342
|
Tuesday, December 20, 2016, 15:04 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | Tuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove box --> ~1600psi |
|
341
|
Friday, December 16, 2016, 14:14 |
Laura Lambert | Ta | 39530-3 | LP-FEBIAD | Done | Conditioning Ta FEBIAD target for shutdown tests | Friday, December 16, 2016, 14:08
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 45.9091g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
3x Ta Heat shields.
LP-FEBIAD container with large center block.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 350A at 2.0A/min.
Final desired temperature = 1900C
Friday, December 16, 2016, 14:32
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2.1e-6 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Monday, December 19, 2016, 11:52
Tapped up manually to ~1900C [see attached excel for details on data collected - interesting temperature fluctuations]
Will remain at max setpoints for min 4hrs then auto-cool
Monday, December 19, 2016, 15:20
Target has remained at max setpoints for just over 4hrs
TGHT = 520A, 8.67V
OMEGA = 1820C
IGP1 = 5.2e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, December 20, 2016, 11:52
Vented in air and opened up this morning.
Looks like the windows was coated in evap2, unsure if this was missed and coated before conditioning target or if this is from materials coming out during conditioning process...
Target looks good.
Endcaps inserted but not expanded.
|
Attachment 1: Ta-FEBIAD.xlsx
|
Attachment 2: Evernote_Camera_Roll_20161220_145947.jpg
|
|
|
340
|
Thursday, December 01, 2016, 16:08 |
Laura Lambert | Empty | 42218-12 | LP-SIS | Done | sintering TaC coating on UCx#19 container | Thursday, December 01, 2016, 16:06
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Friday, December 02, 2016, 11:24
Opened up HS water valves, no leaks detected.
Tapped up manually to 35A.
Waited ~25min, vacuum stable.
IGP1 = 1.65e-6 Torr
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set for 350A and 230A for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Monday, December 05, 2016, 09:38
TGHT = 350A, 5.38V
TBHT = 230A, 4.03V
OMEGA = 1550C
IGP1 = 3.2e-7 Torr
Tapping up to 1900C...
Monday, December 05, 2016, 14:11
OMEGA = 1905C
TGHT = 475A, 7.63V
TBHT = 230A, 4.07V
IGP1 = 8.5e-7 Torr
Tuesday, December 06, 2016, 08:41
TGHT = 475A, 7.76V
TBHT = 230A, 4.07V
IGP1 = 3.9e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, December 07, 2016, 08:46
Evap2 was vented in air and opened up yesterday afternoon.
Container looks good, coating fully sintered.
|
|