  259   Thursday, November 05, 2015, 16:20 Laura Lambert 41077-3LP-SISIn progressSintering TaC coating on 'temporary endcaps' springs

 Thursday, November 05, 2015, 16:19

Springs coated with TaC and loaded into container for sintering.

3x Ta heat shield.

EVAP2 currently pumping down.


 Friday, November 06, 2015, 08:39

Opened HS water valves, no leaks detected.

Tapped up manually to 35A.

IGP1 = 5.5e-7 Torr.


 Friday, November 06, 2015, 10:08

IGP1 = 5.8e-7 Torr.

Vacuum stable.

Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.

See photos attached to view how springs were coated and loaded into container.


 Monday, November 09, 2015, 09:07

TGHT reached 450A, 7.2V ~8pm sat, nov 7th.

OMEGA = 1775C

IGP1 = 3.2e-7 Torr.

Tapping up manually to 1900C.


 

Attachment 1: 2015-11-02_16.03.10.jpg
2015-11-02_16.03.10.jpg
Attachment 2: 'temporary_endcap'_springs_nov.3_2015.jpg
'temporary_endcap'_springs_nov.3_2015.jpg
Attachment 3: IMG_20151105_141239627_HDR.jpg
IMG_20151105_141239627_HDR.jpg
Attachment 4: IMG_20151105_141248901_HDR.jpg
IMG_20151105_141248901_HDR.jpg
  210   Tuesday, June 09, 2015, 10:44 Laura LambertEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

 Tuesday, June 09, 2015, 9:16

Target container is coated with TaC. No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 01A/min.

Chamber is currently being pumped down.


 Tuesday, June 09, 2015, 15:37

HS water valves were opened. no leaks detected.

Tapped up manually to 35A.

Once vacuum stabilized after ~45min, initiated auto-ramp.


 Wednesday, June 10, 2015, 08:02

IGP1 = 5.3e-7 Torr.

TGHT = 250A and TBHT = 140A.

Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

  212   Wednesday, June 10, 2015, 16:35 John WongEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

Laura Lambert wrote:

 Tuesday, June 09, 2015, 9:16

Target container is coated with TaC. No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 01A/min.

Chamber is currently being pumped down.


 Tuesday, June 09, 2015, 15:37

HS water valves were opened. no leaks detected.

Tapped up manually to 35A.

Once vacuum stabilized after ~45min, initiated auto-ramp.


 Wednesday, June 10, 2015, 08:02

IGP1 = 5.3e-7 Torr.

TGHT = 250A and TBHT = 140A.

Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

 Wednesday, June 10, 2015, 16:32

TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.

Vac at 8.5e-7 Torr. 

Cooling down initiated at 1A/min.

Target container should be inspected once the chamber is vented.


 

  213   Thursday, June 11, 2015, 16:10 Laura LambertEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

John Wong wrote:

Laura Lambert wrote:

 Tuesday, June 09, 2015, 9:16

Target container is coated with TaC. No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 01A/min.

Chamber is currently being pumped down.


 Tuesday, June 09, 2015, 15:37

HS water valves were opened. no leaks detected.

Tapped up manually to 35A.

Once vacuum stabilized after ~45min, initiated auto-ramp.


 Wednesday, June 10, 2015, 08:02

IGP1 = 5.3e-7 Torr.

TGHT = 250A and TBHT = 140A.

Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 

 Wednesday, June 10, 2015, 16:32

TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.

Vac at 8.5e-7 Torr. 

Cooling down initiated at 1A/min.

Target container should be inspected once the chamber is vented.


 

 Thursday, June 11, 2015, 10:55

Vented in air and opened up this morning.

Same as last container sintered in evap2 [IG-LIS for UCx#13] - ends not quite fully sintered and coating not very good.

most likely due to old TaC spray.

See link for photos.

https://www.dropbox.com/sh/75o43x8y2z16e7j/AABc8Z1fTTaTRtJ5_Jr1eacWa?dl=0


 

  193   Tuesday, May 19, 2015, 13:54 Laura LambertEmpty41177-1LP-SISDoneSintering TaC coating container for ZrC

 Tuesday, May 19, 2015, 13:33

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.1A/min.

Chamber is currently being pumped down


 Tuesday, May 19, 2015, 15:04

Opened up HS water, no leaks detected.

Stepped up to 35A.

Waited ~35min, vacuum stable.

IGP1 = 1.7e-6 Torr.

Initiating auto-ramp.


 Wednesday, May 20, 2015, 11:43

IGP1 = 3e-7 Torr.

TGHT = 282A, 3.8V

TBHT = 156A, 2.2V

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Thursday, May 21, 2015, 10:42

IGP1 = 2.9e-7

Direct voltage = 5.48V

OMEGA = 1703C.

Initiating auto-cool at 2.0A/min  and 1.0A/min for the TGHT and TBHT.


 Friday, May 22, 2015, 11:41

Vented in air and opened up this morning.

TaC coating fully sintered, looks good! 


 

  410   Wednesday, May 23, 2018, 15:21 Laura LambertEmpty HP-FEBIAD-CTLDoneSintering TaC coating container for UCx#23

Wednesday, May 16, 2018, 09:56

Container coated with TaC using 'flushing technique' and let dry over weekend.

Cleaned ionizer tube with acetone, no coating inside ionizer tube.

Wrapped with 3 x Ta heat shields, not incl center block

OMEGA slope = 0.98

*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process


Thursday, May 17, 2018, 13:15 

HS water valves remained open since the last time evap2 was used, no leak check done.

Tapped up manually to 50A.

Waited ~1hr

Vacuum stable.

IGP1 = 1e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


Friday, May 18, 2018, 13:00 

Tapped up manually.

TGHT = 495A, 8.84V

TBHT = 230A, 3.26V

MIKRON = 2000C

Filament = 1910C

OMEGA = 1910C

Will remain at max setpoints over weekend.


Tuesday, May 22, 2018, 10:04 

Remained at max setpoints over long wknd.

TGHT = 495A, 8.85V

TBHT = 230A, 3.26V

IGP1 = 2.47e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, May 23, 2018, 10:08 

Vented in air this morning.

Container looks good!

Transferred into glove box.


 

 

  182   Thursday, February 19, 2015, 15:21 Laura LambertEmpty41177-2LP-SISDoneSintering TaC coating container for UCx#12

 Thursday, February 19, 2015, 15:19

Target container coated with TaC, loaded in EVAP2.

No Ta heat shields.

Will pump down over the weekend.


 Monday, February 23, 2015, 10:22

IGP1  = 1.75e-7 Torr

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min

evap2 power supply not responding to epics controls...waiting on fix


 Wednesday, February 25, 2015, 16:05

controls now fixed.

danceioc1 involving evap ioc will be updated tomorrow by controls.

once ioc update complete will ramp up.


 Friday, February 27, 2015, 09:34

ioc update complete yesterday afternoon.

IGP1 = 1.1e-7

initiating ramp up...

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Monday, March 02, 2015, 09:01

IGP1 = 2.5e-7 Torr

TGHT = 578A

TBHT = 232A

OMEGA = 1750C

Increasing to 1800C


 Monday, March 02, 2015, 10:42

Reached 1800C at 10:30

TGHT = 603A

TBHT = 232A

IGP1 = 2.8e-7 Torr


 Monday, March 02, 2015, 14:26

Sat at max set point for 4hrs.

IGP1 = 2.7e-7 Torr.

Initiating auto-cool, TGHT @ 2A/min, TBHT @ 1A/min.


 Tuesday, March 03, 2015, 09:17

vented and opened this a.m.

target container looks good, TaC coating fully sintered.


 

  170   Monday, November 10, 2014, 13:55 Laura LambertEmpty LP-SISDoneSintering TaC coating container for UCx#11 [2nd container]

Monday, November 10, 2014, 13:51

target container was sprayed with TaC on friday and sintered over the weekend.
vented and removed from evap2 this morning, looks good.

this container will be used as a round2 for UCx #11 since the last container broke as it was being assembled.

hopefully all the materials can be recovered and re-used/re-loaded into the new container...


 

  162   Monday, October 06, 2014, 12:17 John WongEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

  163   Wednesday, October 08, 2014, 11:51 Laura LambertEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

John Wong wrote:

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

 Wednesday, October 08, 2014, 11:46

Temperature readout from omega-IR2C = 2054C

TGHT = 11.14V, 628.0A

TBHT = 2.01V, 129.8A

IGP1 = 8.2e-7Torr

Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min


 Thursday, October 09, 2014, 16:00

vented in air and opened up this morning

target container looks good!


 

  165   Thursday, October 09, 2014, 16:37 John WongEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

 Wednesday, October 08, 2014, 11:46

Temperature readout from omega-IR2C = 2054C

TGHT = 11.14V, 628.0A

TBHT = 2.01V, 129.8A

IGP1 = 8.2e-7Torr

Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min


 Thursday, October 09, 2014, 16:00

vented in air and opened up this morning

target container looks good!


 

 Thursday, October 09, 2014, 16:36

Photos for the OMEGA-IR2C temp measurement can be found on this link (see also the subfolder for the heating process):

https://www.dropbox.com/sh/n5sxcepg7e847xw/AACMubuKW1idd49D1Nz_0diNa?dl=0

  160   Thursday, October 02, 2014, 11:52 Laura LambertEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

  249   Thursday, September 24, 2015, 09:48 Laura LambertEmpty41077-5 In progressSintering TaC coating container for UCx Target

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 Thursday, September 24, 2015, 12:03

Vacuum spiking rapidly.

Stopped auto-ramp, tapped TGHT and TBHT down manually, allowing vacuum to stabilize.

IGP1 = 3.5e-6 Torr.

Re-initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 

  250   Thursday, September 24, 2015, 12:18 John WongEmpty41077-5LP-SISDoneSintering TaC coating container for UCx Target

Laura Lambert wrote:

Thursday, September 24, 2015, 08:39

IGP1 = 6.5e-7Torr

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Waited ~20min.

Vacuum stable, IGP1 = 1.5e-6 Torr.

Initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively with final setpoints of 250A and 230A.

Final temp of 1200C on auto-ramp in order to initiate temperature measurements starting at ~1200C.


Thursday, September 24, 2015, 10:24  

IGP1 = 8.7e-7 Torr

TGHT = 44A, TBHT = 38A

Increasing auto-ramp to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 

 Thursday, September 24, 2015, 12:04

 A few notes about the target container:The Ta-foil is cut in a full length of the target container, and that also covers up the back block, and the container is wrapped with 3 sheets (see attachment)

 The inner tube is coated with TaC, using the "flushing technique" - the coating looks much better; will see how it turns out after the sintering process

The target will be heated up to 1900C .  Due to the new wrapping of the Ta-heat shield, the heat distribution may be different.  So the target heater will be ramped up to achieve the desired temperature.  


Thursday, September 24, 2015, 18:45  

TGHT reached to 250A3.6V, TGHT at 230A and stayed for 1.5 hours.  Temp-L = 1280C, Temp-R = 1360C.  

Auto-ramp TGHT to 500A at 1A/min and heat at that current for overnight.  Will take temp reading tomorrow.  


Thursday, September 24, 2015, 23:08  

TGHT has reached to 500A/8.57V.  Temp-L = 1895C, Temp-R = 2073C. (Not sure why the temperature is real, will need to investigate more to get an absolute temp)

Just to be safe… Ramping down TGHT to 425A (according to e-log id 216, Temp-R reached to 1800C with TGHT at 425A/6.84V, but no temp measured for the left at that time)

Will check again later.


Friday, September 25, 2015, 11:52  

The target has been heated at 420A for ~12hours; temp measured ~1900C, slightly higher than the previous target container (W.O#40860-1); the Ta-wraping could affect the heat distribution.  

The temperature is also confirmed by using the 2-C digital pyrometer.  The tube inner surface is measured about 1900C, and the ionizer tube is about 2400C.  (see attachment #2).

Initiating auto-cooling at 2A/min for TGHT and 1A/min for TBHT.

The target will be inspected next Monday


 Wednesday, September 30, 2015, 16:01

The target container is fully sintered (see attachment#3) 

It is still in the discussion where this container will be used online for the UCx.  Nevertheless, the target contain is ready and it looks pretty good. 


 

Attachment 1: Screen_Shot_2015-09-24_at_11.51.11_AM.png
Screen_Shot_2015-09-24_at_11.51.11_AM.png
Attachment 2: 420A_1900.png
420A_1900.png
Attachment 3: TaC_coat_sintered.png
TaC_coat_sintered.png
  207   Thursday, June 04, 2015, 11:10 Laura LambertEmpty LP-IG-LISIn progressSintering TaC coating container for UCx

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

  208   Friday, June 05, 2015, 12:19 John WongEmpty LP-IG-LISIn progressSintering TaC coating container for UCx

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 

  209   Friday, June 05, 2015, 13:22 Laura LambertEmpty40860-1LP-IG-LISIn progressSintering TaC coating container for UCx

John Wong wrote:

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 

 Friday, June 05, 2015, 13:21

OMEGA = 1995C

Increasing TGHT to 470A to achieve desired max temperature of 2000C


Friday, June 05, 2015, 15:59

TGHT sat at max desired temperature of 2000C for ~4hrs.

TGHT = 470A, 7.7V

Initiating auto-cool at 1.0A/min.


 Monday, June 08, 2015, 11:31

Vented in air and opened up this morning.

Target container mostly sintered, two tiny patches near both ends not fully sintered.

Will re-install and re-sinter next week as another container with priority needs to be sintered first.


 Tuesday, June 09, 2015, 10:45

See attachements for 'not-fully-sintered' photos


 

Attachment 1: IMG_20150608_145926159.jpg
IMG_20150608_145926159.jpg
Attachment 2: IMG_20150608_145950384.jpg
IMG_20150608_145950384.jpg
  211   Wednesday, June 10, 2015, 12:15 John WongEmpty40860-1LP-IG-LISIn progressSintering TaC coating container for UCx

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 

 Friday, June 05, 2015, 13:21

OMEGA = 1995C

Increasing TGHT to 470A to achieve desired max temperature of 2000C


Friday, June 05, 2015, 15:59

TGHT sat at max desired temperature of 2000C for ~4hrs.

TGHT = 470A, 7.7V

Initiating auto-cool at 1.0A/min.


 Monday, June 08, 2015, 11:31

Vented in air and opened up this morning.

Target container mostly sintered, two tiny patches near both ends not fully sintered.

Will re-install and re-sinter next week as another container with priority needs to be sintered first.


 Tuesday, June 09, 2015, 10:45

See attachements for 'not-fully-sintered' photos


 

 Wednesday, June 10, 2015, 12:06

After inspecting the target container,  the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.  

See link for photos:  https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0 

Attempt to re-spray the container and re-sinter.  


 

 

  214   Friday, June 12, 2015, 14:59 Laura LambertEmpty40860-1LP-IG-LISIn progressSintering TaC coating container for UCx

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 

 Friday, June 05, 2015, 13:21

OMEGA = 1995C

Increasing TGHT to 470A to achieve desired max temperature of 2000C


Friday, June 05, 2015, 15:59

TGHT sat at max desired temperature of 2000C for ~4hrs.

TGHT = 470A, 7.7V

Initiating auto-cool at 1.0A/min.


 Monday, June 08, 2015, 11:31

Vented in air and opened up this morning.

Target container mostly sintered, two tiny patches near both ends not fully sintered.

Will re-install and re-sinter next week as another container with priority needs to be sintered first.


 Tuesday, June 09, 2015, 10:45

See attachements for 'not-fully-sintered' photos


 

 Wednesday, June 10, 2015, 12:06

After inspecting the target container,  the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.  

See link for photos:  https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0 

Attempt to re-spray the container and re-sinter.  


 

 

 Friday, June 12, 2015, 14:58

re-sprayed with second layer of TaC spray this morning.

re-loaded into evap2.

HS water valves opened, no leaks detected.

will ramp-up over weekend.

  117   Tuesday, February 11, 2014, 13:49 Laura LambertEmpty38817-8HP-SISDoneSintering TaC coating container for TiC

 Tuesday, February 11, 2014, 13:43

Target container is coated with TaC and wrapped with 3-Ta heat shields.

TGHT and TBHT will be ramped up to 820A and 300A, respectively.

Ramping rate set to 0.2A/min.

Good vac = 3e-5 Torr, Bad vac = 4e-5 Torr.

Chamber currently being pumped down...


 Tuesday, February 11, 2014, 16:33

Chamber pumped down to 2e-6 Torr.

HS cooling water valves opened; no leaks detected.

Will step up in the a.m.


 Wednesday, February 12, 2014, 11:41

IGP1 = 1.5e-7 Torr

TGHT max voltage = 17.05V, TBHT max voltage = 5V

Stepped TGHT and TBHT up to 35A

Waited 1hr15 before vacuum stabilized/ started to drop.

Initiating auto-ramping.


 Thursday, February 13, 2014, 10:19

TBHT and TGHT have both reached 300A

IGP1 = 2.4e-7 Torr.

Increasing TGHT auto-ramp to 2.0A/min


 Friday, February 14, 2014, 08:58

TGHT reached 820A yesterday afternoon. Measured internal temp this morning at 1300C.

Initiated TGHT auto-cooling at 2.0A/min and TBHT at 1.0A/min.

IGP1 = 3.2e-7 Torr.


 Monday, February 17, 2014, 12:02

Cooled down friday. Vented this morning.

Container fully sintered, smooth run!


 