ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  115   Tuesday, January 28, 2014, 15:46 Laura Lambert 40282-4TARGET BOATFailedSintering TaC coated end caps Tuesday, January 28, 2014, 15:43
The target containers end-caps were
coated with TaC spray and let dry.
 end_capsIMG_20140131_101959838.jpgfeb11-2014(3).jpgfeb11-2014(2).jpg 
  153   Thursday, August 07, 2014, 10:13 Laura Lambert  TARGET BOATFailedSintering TaC coated end caps

    

       
            
  
  155   Thursday, September 11, 2014, 14:23 Laura Lambert 40282-3TARGET BOATFailedSintering TaC coated end caps Thursday, September 11, 2014, 13:14
The target container end caps were
coated with TaC spray and let dry.
 IMG_20140917_142605683.jpgIMG_20140917_143120141.jpgIMG_20140917_143343399_HDR.jpgCapture.JPGCapture2.JPG 
  320   Monday, September 12, 2016, 17:22 John WongEmpty39530-9HP-SISFailedTaC coating chipped off

    

       
            
 Screen_Shot_2016-09-12_at_4.52.53_PM.png 
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned  Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
 See attachment#1 for the commissioning
 Evap2_Commissioning_Report.PDF 
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  6   Monday, March 19, 2012, 17:10 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets
  
  7   Tuesday, March 20, 2012, 14:35 John Wong   DoneEvap#2 Backing up muffler not connected to the exhaust system. Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust
 Evap2_backingpump.jpgscroll_pump_exhaust.jpg 
  8   Tuesday, March 20, 2012, 14:39 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  9   Thursday, March 22, 2012, 00:34 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
 voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG 
  10   Thursday, March 22, 2012, 17:56 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  11   Thursday, March 29, 2012, 19:30 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets Thursday, March 29, 2012, 19:17
 
  
  12   Thursday, March 29, 2012, 22:44 John WongBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
 Parameter.jpg 
  13   Friday, March 30, 2012, 23:21 John WongBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
 archive_24hr.jpgTGHT@240A.jpgTGHT@700A.jpgTGHT@750A.jpgTGHT@0A.jpg 
  14   Monday, April 02, 2012, 16:26 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
  
  16   Thursday, April 05, 2012, 16:40 Nikita BernierBeOTarget boat #2 DoneSintering BeO pellets #3Thursday, April 05, 2012, 16:31
Target boat contains 6 BeO
  
  17   Tuesday, May 15, 2012, 12:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC targetTuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010.  The target consists of
  
  22   Friday, May 18, 2012, 12:19 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 autoramp1.pngievap2autoheat1.png 
  23   Friday, May 18, 2012, 13:17 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
  
  24   Tuesday, May 22, 2012, 12:15 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 TGHT-VAC1.JPGTBHT-VAC1.JPG 