459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
523
|
Thursday, November 05, 2020, 15:13 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | cleaning treatment. | 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on. |
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
506
|
Thursday, September 10, 2020, 07:53 |
Aaron Schmidt | Empty | 41790-8 | LP-FEBIAD | Done | Fernando FEBIAD / Anode testing. | FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check |
|
623
|
Thursday, April 20, 2023, 07:00 |
Darwin Ortiz Rosales | TaC | 41790-7 | LP-FEBIAD | Done | TaC coating sintering | Thursday, April 20, 2023, 06:59
The coated container was wrapped
in 3 Ta foil heatshields. |
|
327
|
Wednesday, September 28, 2016, 17:09 |
Laura Lambert | Empty | 41790-6 | LP-SIS | Done | sintering TaC coating on UCx container | Wednesday, September 28, 2016, 17:08
Container coated with TaC using |
   |
328
|
Friday, October 07, 2016, 16:42 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 | Friday, October 07, 2016, 16:40
Target consists of 470 discs. |
|
329
|
Wednesday, October 12, 2016, 21:18 |
John Wong | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 |
|
|
330
|
Thursday, October 13, 2016, 17:32 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Conditioning Ta#50 |
|
|
331
|
Thursday, October 13, 2016, 18:05 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 | Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields. |
|
332
|
Saturday, October 15, 2016, 12:42 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
333
|
Sunday, October 16, 2016, 17:55 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
334
|
Tuesday, October 18, 2016, 09:23 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Temperature measurements for Ta#50 |
|
|