  ID Date Author Target Material Target Oven W.O#down Source Status Subject
  506   Thursday, September 10, 2020, 07:53 Aaron SchmidtEmpty41790-8LP-FEBIADDoneFernando FEBIAD / Anode testing.

 FEBIAD installed. Anode PS installed. ANODE connected!.

Leak check

Thursday, September 10, 2020, 07:46: Vacuum @ 6.30e-07T

Thursday, September 10, 2020, 07:47: HS Waterline open. Stable vacuum.

Thursday, September 10, 2020, 07:51: Auto-ramp TGHT / TBHT to 400 / 200 A @ 2 A per min. 


FM

Thursday, September 10, 2020, 13:28: Pyrometer aligned.  Current reading 1106.7 @ slope=0.9

Thursday, September 10, 2020, 13:46: Auto-ramp TGHT / TBHT to 580/ 250A @ 2 A per min. 

Thursday, September 10, 2020, 13:47: Recording pyrometer data 

Thursday, September 10, 2020, 15:33: Auto-ramp finished. Temperature=1568.0 @slope=0.9

Thursday, September 10, 2020, 15:35: Voltage power supply limited to 150 mA.

Thursday, September 10, 2020, 15:36: Voltage power supply is set to output. Nothing strange on the other PS.

Thursday, September 10, 2020, 15:42: Slowly increased the voltage to 150 V but nothing read. two times during the voltage sweep the current on the Ps showed 1mA. Nothing strangeon the vacumm or the other power supply voltages

Thursday, September 10, 2020, 15:45: Auto-rampup TBHT to 290 @ 2A/min 

Thursday, September 10, 2020, 16:08: Voltage sweep  

Thursday, September 10, 2020, 17:24: Auto-rampup to 300 @ 2A/min


Friday, September 11, 2020, 11:05: Auto-ramping to 290 @ -2A/min 

Friday, September 11, 2020, 13:22: auto-ramping to 305 @ 2A/min 

Friday, September 11, 2020, 14:10: The power supply is not reading current anymore. At 305 A I couldn't get any reading. I lowered the current to 290 A and the PS displays 0 mA even at 500 V, whereas before it showed 13 mA.

Vacuum looks normal not any sort of spike.

I will open the system to inspect the interior.

Friday, September 11, 2020, 14:15: Auto-cooling to 0 A TGHT/TBHT @-2A/min 


Saturday, September 12, 2020, 10:52: Venting 

Saturday, September 12, 2020, 14:00: Confirmed anode de-attached. I will spot welded again. 

Saturday, September 12, 2020, 18:29: After many failures I aborted the spot welding. The anode ended up looking pretty bad. 


 Sunday, September 13, 2020, 19:06: Opened waterlines. Vacuum still decreasing.

Monday, September 14, 2020, 09:12: Vacuum @  8.15e-7 T. and decreasing. I will start the ramping now.

Monday, September 14, 2020, 09:28: Auto-ramping to 400/200 A @ 4/min (1 A/15 s) .

No reading on the 2-color pyrometer channel. 1-color channels indicate around 1000C

 Monday, September 14, 2020, 12:49: Recording temperature and vacuum. Auto-ramp TBHT to 210 @ 4A/min.

 Monday, September 14, 2020, 12:57: Emissivity slope sweep. Only "under" is being shown

Monday, September 14, 2020, 12:58:  Auto-ramp TBHT to 220 @ 4A/min. 

Monday, September 14, 2020, 13:05: Emissivity slope sweep. Only "under" is being shown

Monday, September 14, 2020, 13:06: Auto-ramp TBHT to 240 @ 4A/min.  

Monday, September 14, 2020, 13:17: Auto-ramp TBHT to 250 @ 4A/min.   

Monday, September 14, 2020, 13:22: Emissivity slope sweep. Only "under" is being shown 

Monday, September 14, 2020, 13:23: Auto-ramp TBHT to 260 @ 4A/min.    

Monday, September 14, 2020, 13:27 : Emissivity slope sweep. Only "under" is being shown 

Monday, September 14, 2020, 13:27 : Auto-ramp TBHT to 275 @ 4A/min.    

Monday, September 14, 2020, 13:36: Emissivity slope sweep. Only "under" is being shown for the 2-color channel. 1-color channel displays around 1200 C. Maybe there is a different  cutoff for the 2-color channel

Monday, September 14, 2020, 13:38: At 400V the PS reads back 1mA 

Monday, September 14, 2020, 13:39 : Auto-ramp TBHT to 290 @ 4A/min.   

Monday, September 14, 2020, 17:41: Roughing 


Tuesday, September 15, 2020, 07:03: Vacuum stable at 4.65e-7T.

Tuesday, September 15, 2020, 07:03:  Auto-ramp TGHT / TBHT to 400/ 200A @ 4 A per min. 

Tuesday, September 15, 2020, 10:00:  Auto-ramp TGHT  to 500 @ 4 A per min. 

Tuesday, September 15, 2020, 11:13:  Auto-ramp  TBHT to 250@ 4 A per min. 

Tuesday, September 15, 2020, 15:44: There is a short inside the system. I  thought it might be the vanadium wire but increasing the tbht current did not indicate a clear evaporation so I don't think this is the case.

I'll ramp down to 0 at 8A/min to open and inspect. My measurements don't make any sense without both the pyrometer and the anode leakage current reading.

Tuesday, September 15, 2020, 15:49: Auto-cooling TGHT/TBHT to 0A at 8A/min (2A /15 s).

 Tuesday, September 15, 2020, 16:00: Auto-cooling aborted, the system is no longer current limited. The contact causing the issue probably moved while cooling.

***many ramp ups.downs, Temperature measurements, voltage sweeps, inverse temperature estimations. Absolute temperature measurements for when the vanadium wire melted, the pyrometer was already reading 1920, a slightly adjust on the emissivity slope move it to 1911C

Tuesday, September 15, 2020, 18:47: Ramp down TGHT/TBHT to 500/250 A @ -1A/min

Tuesday, September 15, 2020, 18:48: Done for today. 


Wednesday, September 16, 2020, 10:02: Auto-ramp up TGHT/TBHT to 580/285 A @ 2A/min 

Wednesday, September 16, 2020, 12:59: Auto-ramp  up TGHT/TBHT to 600 A @ 2 A/min 

Wednesday, September 16, 2020, 13:45: Auto-ramp up TBHT to 290 A @ 1A/min 

Wednesday, September 16, 2020, 18:45: Auto-ramp down TGHT/TBHT to 400/200 A @ -2A/min 


Thursday, September 17, 2020, 08:46: Auto-ramp up TBHT to 285 A @ 2A/min 

Thursday, September 17, 2020, 12:03: Auto-cooling TGHT/TBHT to 0A @ -4A/min

Thursday, September 17, 2020, 13:49: Turbo off. Roughing pump off 

  623   Thursday, April 20, 2023, 07:00 Darwin Ortiz RosalesTaC41790-7LP-FEBIADDoneTaC coating sintering

Thursday, April 20, 2023, 06:59

The coated container was wrapped in 3 Ta foil heatshields.

Target temperature on OMEGA= 1830-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Thursday, April 20, 2023, 07:02

Started TBHT and TBHT ramp at 1A/min to 230A


Thursday, April 20, 2023, 09:55

From 170 A started ramping at 2A/min to 230 A on both TGHT and TBHT


Thursday, April 20, 2023, 10:27

Starting ramp on TGHT to 300A, TBHT kept at 230A, 3.0 V


Thursday, April 20, 2023, 11:19

ramping at 4A/min (2A/30s) to 340 A on TGHT


Thursday, April 20, 2023, 11:40

After plot, ramping @ 2A/min to 460A on TGHT expected to reeach at 1245.  4 hours at 4:45 pm


Thursday, April 20, 2023, 13:44

Note that top temperature was 1835C @  480 A, 7.9V


Thursday, April 20, 2023, 17:00

Start rampdown at -2A/min TGHT and -1A/min TBHT


Monday, April 24, 2023, 13:35

The coating is not as good as expected.  Maybe too much time between coating and sintering.  Will not use for TiC target.

  327   Wednesday, September 28, 2016, 17:09 Laura LambertEmpty41790-6LP-SISDonesintering TaC coating on UCx container

 Wednesday, September 28, 2016, 17:08

Container coated with TaC using 'flushing technique' today, cleaned ionizer tube with acetone, no coating inside ionizer tube

Dried by blowing air into tube

Wrapped with 3 x Ta heat shields, incl center block - new method of each layer being one long single Ta foil covering entire container incl center block

Currently pumping down in evap2


 Thursday, September 29, 2016, 11:11

HS water valves opened

Tapped up to 35A

Waited ~45min, vacuum stable

IGP1 = 1.4e-6 Torr

Initiating auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Max setpoints for TGHT = 350A and TBHT  = 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Friday, September 30, 2016, 10:51

IGP1 = 7.8e-7 Torr

TGHT = 315A, 4.57V

TBHT = 174A, 2.8V

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Friday, September 30, 2016, 11:44

Changed OMEGA slope to 0.98

IGP1 = 1e-6 Torr

TGHT = 350A, 5.2V

TBHT = 201A, 3.4V

Increasing ramping rate of TBHT to 1.0A/min

OMEGA = 1625C / MIKRON = 1625C


 Friday, September 30, 2016, 15:45

IGP1 = 1.1e-6 Torr

TGHT = 430A, 6.79V

TBHT = 230A, 4.07V

OMEGA = 1903C

Will remain at max setpoints over weekend.

See attached link for raw data of manual tap up.

Also see attached photos of screenshots showing oval - not circular - tube of target container at two different temperatures...


 Monday, October 03, 2016, 13:28

IGP1 = 1.79e-7 Torr

TGHT = 430A, 6.87V

TBHT = 230A, 4.06V

OMEGA = 1892C

MIKRON = 1847C

Attached is a picture taken through the MIKRON, the slight oval shape appears to be a minor bend in the target container:

With the ionizer tube facing into the page, the bend appears to be in the center with both ends of the container bent slightly towards the page

This possible bend in the container gives the appearance of the oval shape through the camera while it is being heated, due to the angle of the camera

Remained at max setpoints over weekend.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, October 04, 2016, 13:40

Vented in air and opened up this morning.

Container done, TaC coating looks good.

Waiting further inspection...


 Tuesday, October 04, 2016, 14:48

Container placed on jig and inspected.

Approved to go ahead for use online by Anders and Friedhelm.


 

Attachment 1: sintering_TaC_coating.xlsx
Attachment 2: sintering_TaC_coating.JPG
sintering_TaC_coating.JPG
Attachment 3: sintering_TaC_coating2.JPG
sintering_TaC_coating2.JPG
Attachment 4: sintering_TaC_coating-combo_of_both_pics.JPG
sintering_TaC_coating-combo_of_both_pics.JPG
  328   Friday, October 07, 2016, 16:42 Laura LambertTa41790-5LP-SISIn progressConditioning Ta#50

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass 47.6889g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

Attachment 1: Ta#50_no_endcaps_3xh.s..xlsx
  329   Wednesday, October 12, 2016, 21:18 John WongTa41790-5LP-SISIn progressConditioning Ta#50

Laura Lambert wrote:

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

 Wednesday, October 12, 2016, 21:14

Current status before cooling down:

TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C

Vacuum at 4.05 e-7 Torr.

Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT


 

  330   Thursday, October 13, 2016, 17:32 Laura LambertTa41790-5LP-SISDoneConditioning Ta#50

John Wong wrote:

Laura Lambert wrote:

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

 Wednesday, October 12, 2016, 21:14

Current status before cooling down:

TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C

Vacuum at 4.05 e-7 Torr.

Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT


 

 Thursday, October 13, 2016, 17:32

vented in air and opened up this morning.

target looks good.

  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

  332   Saturday, October 15, 2016, 12:42 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

Laura Lambert wrote:

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>

Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.

  333   Sunday, October 16, 2016, 17:55 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

Aurelia Laxdal wrote:

Laura Lambert wrote:

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>

Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.

 Sunday October 16: the target temperature measurements up to 620A/230A were performed today not on October 15 (yesterday, it was cooled down before reaching 300A/230A). Currently the target is cooling down, to be ready tomorrow morning for the Test Stand. 

  334   Tuesday, October 18, 2016, 09:23 Laura LambertTa41790-5LP-SISDoneTemperature measurements for Ta#50

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Laura Lambert wrote:

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>

Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.

 Sunday October 16: the target temperature measurements up to 620A/230A were performed today not on October 15 (yesterday, it was cooled down before reaching 300A/230A). Currently the target is cooling down, to be ready tomorrow morning for the Test Stand. 

 Monday, October 17, 2016, 09:21

Vented in air and taken out this morning.

Target looks good!


 

  352   Monday, March 13, 2017, 15:34 Anders MjosTa41790-4LP-SISDoneConditioning Ta#51

Target container wrapped in 3x heat shield foils and installed by JW

 Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T 

Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.

Monday, March 13, 2017, 15:54: Started auto-ramping to TGHT / TBHT 150 / 75 A at 1 / 0.5 A/min. Good/bad vacuum 3 / 4 E-5 Torr


Tuesday, March 14, 2017, 08:23: Continue auto-ramping to TGHT / TBHT 300 / 150 A. Vacuum stable at IG1 2.3E-7 T 

Tuesday, March 14, 2017, 11:18: Continue auto-ramping to TGHT / TBHT 350 / 200 A. Vacuum stable at IG1 3.8E-7 T 


Wednesday, March 15, 2017, 08:31: Continue auto-ramping to TGHT 375. Vacuum stable at IG1 2.5E-7 T. Omega at 1500 C

Wednesday, March 15, 2017, 16:34: Continue auto-ramping to TGHT 500. Vacuum increased to IG1 5.5E-7 T. Omega at 1887 C


Thursday, March 16, 2017, 08:34: Continue auto-ramping to TGHT 520. Vacuum increased to IG1 3.3E-7 T. Omega at 1888 C

Thursday, March 16, 2017, 08:48: TGHT at 521 A 8.99 V. Omega at 1899 C


Friday, March 17, 2017, 08:25: TGHT at 521 A 8.88 V. Omega at 1886 C. Vacuum IG1 2.5E-7 Torr

Ramping down


Wednesday, March 22, 2017, 08:42: Turbo pump stopped

  308   Monday, June 27, 2016, 11:08 Laura LambertEmpty41790-3LP-SISDonesintering TaC coating on UCx#17 container

 Monday, June 27, 2016, 11:07

Container coated with TaC using 'flushing technique'.

Wrapped with 3 x Ta heat shields, incl center block - new method of each layer being one long single Ta foil covering entire container incl center block

Currently pumping down in evap2


 Monday, June 27, 2016, 13:23

HS water valves opened

Tapped up manually to 35A

Waited ~1hr, vacuum stable

IGP1 = 1.8e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 400A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Wednesday, June 29, 2016, 11:33

IGP1 = 1.9e-7

TGHT = 400A, 6.0V

TBHT = 223A, 3.9V

OMEGA = 1885C

Remained at these settings for ~13hrs

Increased TBHT max voltage to 4.3V to achieve 230A

TBHT = 230A, 4.1V

OMEGA = 1890C

Tapped up to TGHT = 405A, 6.17V to achieve 1900C...OMEGA reached 1915C

Lowered TGHT to = 403A, 6.12V

OMEGA = 1905C

Measured ~1870C with the mikron, same window the OMEGA measurements are taken out of.

IGP1 = 2.1e-7


 Thursday, June 30, 2016, 08:44

TGHT = 403A, 6.07V

OMEGA = 1886C

Tapped back up to 1900C

TGHT = 410A, 6.22V

OMEGA = 1911C


Thursday, June 30, 2016, 16:01

OMEGA = 1911C

Container has remained at ~1900C for ~1.5 days

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Monday, July 04, 2016, 09:59

Vented in air and opened up this morning.

Container looks good.

Confirmed coating fully sintered with J.Wong.

Photos attached.


 

Attachment 1: LP-SIS_post_sintering_TaC(3).jpg
LP-SIS_post_sintering_TaC(3).jpg
Attachment 2: LP-SIS_post_sintering_TaC(4).jpg
LP-SIS_post_sintering_TaC(4).jpg
  279   Sunday, March 13, 2016, 14:58 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

  280   Monday, March 14, 2016, 09:22 Laura LambertTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

  281   Monday, March 14, 2016, 13:12 Anders MjosTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

  282   Monday, March 14, 2016, 19:22 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Anders Mjos wrote:

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

 After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.

  283   Friday, March 18, 2016, 17:13 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Aurelia Laxdal wrote:

Anders Mjos wrote:

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

 After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.

 Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.

  284   Monday, March 21, 2016, 18:57 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

 After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.

 Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.

Today, lowered the TGHT from 620A (at 1894 deg C) to 300A.  TBHT is still at 230A.

  285   Tuesday, March 22, 2016, 11:31 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

 After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.

 Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.

Today, lowered the TGHT from 620A (at 1894 deg C) to 300A.  TBHT is still at 230A.

 Cooling down the target.

 

  286   Thursday, March 24, 2016, 11:32 John WongTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

Laura Lambert wrote:

Aurelia Laxdal wrote:

Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).

 Monday, March 14, 2016, 09:20

One thermocouple was not welded on correctly and is not working. 

Cooling evap2 back down, to remove target and re-weld thermocouple.

Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.


 

 Monday, March 14, 2016, 13:12: Stopped turbo pump

 After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.

 Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.

Today, lowered the TGHT from 620A (at 1894 deg C) to 300A.  TBHT is still at 230A.

 Cooling down the target.

 

Thursday, March 24, 2016, 11:29 

Target was removed from the Evaporator.  

The thermocouples broke off.  

Need to insert Re foil prior to installing


 

 