Entry  Thursday, September 10, 2020, 07:53, Aaron Schmidt, Empty, 41790-8, LP-FEBIAD, Done, Fernando FEBIAD / Anode testing. 
 FEBIAD installed. Anode PS installed. ANODE connected!.
Leak check
Thursday, September 10, 2020, 07:46: Vacuum @ 6.30e-07T
Entry  Thursday, April 20, 2023, 07:00, Darwin Ortiz Rosales, TaC, 41790-7, LP-FEBIAD, Done, TaC coating sintering 
Thursday, April 20, 2023, 06:59
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
Entry  Wednesday, September 28, 2016, 17:09, Laura Lambert, Empty, 41790-6, LP-SIS, Done, sintering TaC coating on UCx container sintering_TaC_coating.xlsxsintering_TaC_coating.JPGsintering_TaC_coating2.JPGsintering_TaC_coating-combo_of_both_pics.JPG
 Wednesday, September 28, 2016, 17:08
Container coated with TaC using 'flushing technique' today, cleaned ionizer tube with acetone,
no coating inside ionizer tube
Entry  Friday, October 07, 2016, 16:42, Laura Lambert, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50 Ta#50_no_endcaps_3xh.s..xlsx
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
    Reply  Wednesday, October 12, 2016, 21:18, John Wong, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50 


    
        
            Laura Lambert wrote:
        
        
            
            Friday, October 07, 2016, 16:40
    Reply  Thursday, October 13, 2016, 17:32, Laura Lambert, Ta, 41790-5, LP-SIS, Done, Conditioning Ta#50 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Thursday, October 13, 2016, 18:05, Laura Lambert, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 
Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
    Reply  Saturday, October 15, 2016, 12:42, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, October 13, 2016, 18:04
    Reply  Sunday, October 16, 2016, 17:55, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
    Reply  Tuesday, October 18, 2016, 09:23, Laura Lambert, Ta, 41790-5, LP-SIS, Done, Temperature measurements for Ta#50 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
Entry  Monday, March 13, 2017, 15:34, Anders Mjos, Ta, 41790-4, LP-SIS, Done, Conditioning Ta#51 
Target container wrapped in 3x heat shield foils and installed by JW
 Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T 
Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.
Entry  Monday, June 27, 2016, 11:08, Laura Lambert, Empty, 41790-3, LP-SIS, Done, sintering TaC coating on UCx#17 container LP-SIS_post_sintering_TaC(3).jpgLP-SIS_post_sintering_TaC(4).jpg
 Monday, June 27, 2016, 11:07
Container coated with TaC using 'flushing technique'.
Wrapped with 3 x Ta heat shields, incl center block - new method of each layer being one long
Entry  Sunday, March 13, 2016, 14:58, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
    Reply  Monday, March 14, 2016, 09:22, Laura Lambert, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the
    Reply  Monday, March 14, 2016, 13:12, Anders Mjos, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Monday, March 14, 2016, 19:22, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Anders Mjos wrote:
        
        
            
            
            
    Reply  Friday, March 18, 2016, 17:13, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
    Reply  Monday, March 21, 2016, 18:57, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
    Reply  Tuesday, March 22, 2016, 11:31, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
    Reply  Thursday, March 24, 2016, 11:32, John Wong, Ta, 41790-1, LP-SIS, Done, Ta#47 LP-SIS (with new center block) conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            