Entry  Tuesday, May 15, 2012, 17:06, John Wong, , , , Problems resolved, TBHT power supply faulty tubeheater_control.png
 Tuesday, May 15, 2012, 17:03
The tube heater power supply current readback and setpoint are not matching.  Ray Dube checked the power supply and confirmed that it is faulty.
 He will replace a functional p/s tomorrow. 
Entry  Tuesday, May 15, 2012, 17:03, John Wong, , , , Problems, TBHT cooling line leaky TBHT_cooling_line_leaky.pdf
 Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line.  The joint is leaky.  (see attachment 1) 
A message has sent to Rick M. 
    Reply  Wednesday, May 16, 2012, 14:04, John Wong, , , , Problems resolved, TBHT cooling line leaky 


    
        
            John Wong wrote:
        
        
            
             Tuesday, May 15, 2012, 17:00
Entry  Tuesday, June 21, 2022, 09:48, Darwin Ortiz Rosales, SiC, 37978-1, HP-FEBIAD, Done, T-220617 sintering 
Tuesday, June 21, 2022, 09:43
Total number of foils: 377 ( including 6 analysis discs on the right side of the container)
Total weight = 1454 g (includes heatshields, spring and T bar)
Entry  Tuesday, June 07, 2022, 07:31, Darwin Ortiz Rosales, SiC, 42464-2, HP-FEBIAD, Done, T-220524 Sintering SiC 
Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Entry  Wednesday, May 18, 2022, 09:59, Darwin Ortiz Rosales, SiC, 44692-9, HP-FEBIAD, Done, T-220516 Sintering SiC 
 Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Entry  Thursday, November 24, 2022, 11:08, John Wong, TiC, , TARGET BOAT, Done, Synthesis of TiC fibrous disc (TiO2/PAN only) striptool_1600C.jpgstriptool_1887C.jpg
Thursday, November 24, 2022, 11:01
Target container contains one disc of e-spun TiO2/PAN fibrous disc, (Ref sample P-134).
Sample will be heated to 1875C, similar to the previous process, see e-log ID#599.
Entry  Tuesday, October 18, 2022, 13:59, Hannah Toy, TiC, Target boat (tube), TARGET BOAT, Done, Synthesis of TiC 
 Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP loaded into a target boat wrapped with 2 layers of Ta-heat shield.
Samples will be heated to 1700, 1800, 1900, and 2000 C
    Reply  Wednesday, October 19, 2022, 09:50, John Wong, TiC, Target boat (tube), TARGET BOAT, Done, Synthesis of TiC Screenshot_2022-10-19_102257.pngScreenshot_2022-10-19_120146.pngScreenshot_2022-10-19_195305.pngScreenshot_2022-10-21_085223.png


    
        
            Hannah Toy wrote:
        
        
            
             Tuesday, October 18, 2022, 13:52
Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 
 Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
Monday, June 05, 2023, 15:10: Controller reset. TP on. 
Entry  Thursday, March 27, 2014, 18:04, John Wong, , , TARGET BOAT, In progress, Studying WC sintering on Ta surface 
Thursday, March 27, 2014, 17:38
TEST #1
WC slurry was prepared in non-aqueous environment (see lab book for procedures).  The solution was dripped on two Ta plates (3.1cm2) and let
Entry  Tuesday, May 14, 2013, 17:15, John Wong, Empty, 38481-6, HP-FEBIAD, Done, SinteringTaC coating 
Tuesday, May 14, 2013, 17:04
Target oven is coated with TaC, and wrapped with 3-Ta heat shields.
TGHT and TBHT will be ramped up to 820A and 300A, respectively.
Entry  Wednesday, May 06, 2015, 13:59, Laura Lambert, , 40282-4, TARGET BOAT, Done, Sintering two different ZrC samples evap2_data_from_two_samples_-_18mm_hand_punched.xlsx
 Wednesday, May 06, 2015, 13:54
Two different samples of ZrC are wrapped in graphite sheet and loaded into the target boat.
Sample #1 = ZrC
Entry  Wednesday, May 13, 2015, 16:01, Laura Lambert, , 40282-4, TARGET BOAT, Done, Sintering three different ZrC samples evap2_data_from_three_samples_-_final_test_run.xlsx
 Wednesday, May 13, 2015, 15:21
Three different samples of ZrC are loaded into a target boat.
Sample A: ZrC + NO graphite
Entry  Thursday, May 29, 2014, 18:16, Cameron Hodgins, , , TARGET BOAT, In progress, Sintering several carbides on tantalum foil backing 01-samples.jpg
Purpose: Sinter one sample of each of TiC, VC, Cr3C2, ZrC, NbC, Mo2C, TaC, and WC on 5x10 mm tantalum foil to see if the samples are usable for SEM.
Samples were prepared using a solution of PEG (2.56 g), PVB (2.45 g), paraffin oil (1.12 g), MEK (15 mL), and EtOH (23 mL). Slurries made using
0.0013 mol of each carbide with ~230 uL of the solution. Applied via paintbrush onto 5x10 mm tantalum foil. 
Entry  Friday, May 30, 2014, 13:15, Cameron Hodgins, , , , In progress, Sintering several carbides on tantalum foil backing 
 Pressure down to 7.1e-7 Torr. Water valve to heat shield was opened; pressure remained stable. 
Current turned up to 40 A for now.  Will increase at 2 A/min up to 500 A over the weekend, then on Monday we will turn it up to 600 A and
check the temperature. 
Entry  Friday, June 06, 2014, 16:01, Cameron Hodgins, , , TARGET BOAT, In progress, Sintering several carbides on tantalum foil backing 
Auto-ramp started. Max current = 500 A, voltage = 11.05 V. Current is being increased at 2 A/min. In the first 20 minutes, the pressure went up to about
10E-6 T, but has slowly decreased since then. Everything looks ok. The system will be left until Monday morning (June 9th). 
Entry  Monday, June 09, 2014, 13:56, Cameron Hodgins, , , TARGET BOAT, In progress, Sintering several carbides on tantalum foil backing 
Manually changed current from 500 to 615 A, monitoring the temperature. Temperature went from 1657 C up to 1838 C. Pressure increased up to 7.2e-7 T.
Samples should be left for about 4 hours (615 A started just before 13:00), then the goal is to ramp current back to zero.
Entry  Monday, June 09, 2014, 17:15, Cameron Hodgins, , , TARGET BOAT, In progress, Sintering several carbides on tantalum foil backing 
 Target boat is now being cooled at 1 A/min from the starting point (616 A) down to 0 A. 
Entry  Wednesday, August 24, 2016, 17:07, John Wong, SiC, 39814-V2-1, LP-IG-LIS, Done, Sintering process for SiC#34 (2nd round)  10x
Wednesday, August 24, 2016, 17:05
Target container was previously coated with TaC and sintered up to 1900C at 420A/7.01V
Container is loaded with beta-SiC 432 discs at 16cm in length. 