ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube thermocouple test
Thursday, August 04, 2022, 09:31 Test finished August 3rd afternoon. Venting now.
|
20
|
Tuesday, May 15, 2012, 17:06 |
John Wong | | | | Problems resolved | TBHT power supply faulty | Tuesday, May 15, 2012, 17:03
The tube heater power supply current readback and setpoint are not matching. Ray Dube checked the power supply and confirmed that it is faulty. He will replace a functional p/s tomorrow.
Friday, May 18, 2012, 13:24
The original p/s was replaced with a new one and there was still a discrepancy between the readback and the setpoint. After checking with the drawings for the ITE/ITW tube heaters, it was confirmed that the connections for the Evap#2 tube heater control were wrong. (see attachment 1). The connections were corrected and the power supply is now operational.
|
Attachment 1: tubeheater_control.png
|
|
19
|
Tuesday, May 15, 2012, 17:03 |
John Wong | | | | Problems | TBHT cooling line leaky | Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line. The joint is leaky. (see attachment 1)
A message has sent to Rick M.
|
Attachment 1: TBHT_cooling_line_leaky.pdf
|
|
21
|
Wednesday, May 16, 2012, 14:04 |
John Wong | | | | Problems resolved | TBHT cooling line leaky |
John Wong wrote: |
Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line. The joint is leaky. (see attachment 1)
A message has sent to Rick M.
|
Wednesday, May 16, 2012, 14:01
The connector was re-tighten. The water valve was opened, and no water leaks were found.
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: 377 ( including 6 analysis discs on the right side of the container)
Total weight = 1454 g (includes heatshields, spring and T bar)
Total length packed 15.5 cm (excluding 6 analysis discs that will be removed)
container has 3 Ta heat shields and is coated
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 80A at 2 A/min
then to 120A and slow down ramp when pressure begins to increase
max approx 675A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1=3.6 e-07 Torr at start of initial ramp.
Tuesday, June 21, 2022, 13:54
IGP1= 7.1 e-05 and dropping. Start ramp to 150A for both TGHT and TBHT @1A/min
Tuesday, June 21, 2022, 21:27
Increased ramp rate to 3A/min for TGHT to 675A
Tuesday, June 21, 2022, 22:38
Ramp up to 685 A on TGHT and leave for 4 hours.
OMEGA = 1645 C but suspect reading not on Ta surface.
Wednesday, June 22, 2022, 02:28
IGP1=7.7e-6 Torr
OMEGA =1610C
TGHT = 685A, 10.5V
TBHT = 230A, 3V
initiate rampdown at -2A/min and -1Amin TGHT and TBHT |
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Total length packed 16.4 cm (excluding 5 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 50A at 3 A/min
then continue to 80A and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.6 e-07 Torr at start of initial ramp.
Tuesday, June 07, 2022, 11:14
Ramping to 150A on TGHT and TBHT at 1A/min
Ramped TGHT and TBHT to 230A at 2A/min
Tuesday, June 07, 2022, 13:12
Ramping TGHT to 600A at 4A/min
TBHT at 230A, 3.0V
Tuesday, June 07, 2022, 16:41
TGHT= 740 A, 12.1V
TBHT= 232A, 3.0 V
OMEGA reading 1616C but questionable. Will leave for 4 hours at 740A top TGHT.
Wednesday, June 08, 2022, 22:15
Early Wednesday morning the left TGHT bolt was found damaged. The target leg was coated with bolt material rendering the Target inoperable.
The Heatshield assembly was swapped and surfaces cleaned. A "dummy" FEBIAD was installed to test if the system can withstand high current.
The system was pumped down and ramped to 740A on TGHT at 4A/min. It was then left at that current for 4 to 5 hours.
Currently starting rampdown at -2A/min to 0A.
Photos of the incident attached in *eLog 580*. IGP1= 5.7e-06 Torr
TGHT= 742A, 11.4V |
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Total length packed 17 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 30A at 3 A/min
then continue to and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.1 e-07 Torr at start of initial ramp. Note, first real operation with new noisy Turbo Pump.
Wednesday, May 18, 2022, 10:18
Pressure increase observed starting around 60A. Ramped to 70 A and will leave until pressure stabilizes
After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT
Wednesday, May 18, 2022, 11:37
pressure spike around 90A. will leave until pressure stabilizes
Wednesday, May 18, 2022, 12:54
start autoramp to 100A at 1A/min. IGP1= 1.4e-4 Torr
Wednesday, May 18, 2022, 13:15
autoramp to 150A @1A/min
Wednesday, May 18, 2022, 13:41
At 110A another spike in pressure. System waiting for good vacuum
Wednesday, May 18, 2022, 15:24
ramped to 150A on both TGHT and TBHT. Ramping to 200 A at @A/min for both TGHT and TBHT
currently IGP1= 2.0e-4 Torr
Wednesday, May 18, 2022, 15:33
Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT
Wednesday, May 18, 2022, 16:22
Increasing ramp to 4A/min on TGHT
Wednesday, May 18, 2022, 17:26
switched to 6A/min in 1A/10s increments on TGHT
Wednesday, May 18, 2022, 17:43
Set final current to 730 A as per regression attached.

Wednesday, May 18, 2022, 17:54
Final current on TGHT = 740A, 11.9 V
OMEGA = 1775 C
TBHT = 230A,
Will leave for 4 hours
Wednesday, May 18, 2022, 19:56
Temperature dropped so increased current to 755A for the remaining of the time.
Friday, May 20, 2022, 08:58
Final notes: The difference between initial and final mass was 6 g as expected. Slight coating on window of evaporator may explain apparent temperature drop. Next time will keep current at projected setting. The material looks good with slight overheating on the outer discs of left side.
|
605
|
Thursday, November 24, 2022, 11:08 |
John Wong | TiC | | TARGET BOAT | Done | Synthesis of TiC fibrous disc (TiO2/PAN only) | Thursday, November 24, 2022, 11:01
Target container contains one disc of e-spun TiO2/PAN fibrous disc, (Ref sample P-134).
Sample will be heated to 1875C, similar to the previous process, see e-log ID#599.
TGHT will be autoramped to 350 A and monitor the conditions before ramping up further.
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
Chamber has been pumped down below 5.0e-6 Torr.
Friday, November 25, 2022, 08:38
TGHT reached to 348A/5.8V; temp is holding at 1600 C since 19:00 yesterday, see attachment#1.
Stepping up TGHT to 400A and continue to monitor.
Friday, November 25, 2022, 09:45
TGHT reached to 400A/6.8V; temp holding at 1758C. Pressure coming down from 6.6e-7 Torr.
Ramping up to 410A.
Friday, November 25, 2022, 12:28
TGHT reached 410A/7.08V. temp holding at 1790 C. Pressure coming down from 6.9e-7 Torr.
Ramping up to 430A.
Friday, November 25, 2022, 13:01
TGHT reached 430A/7.4V. Temp holding at 1837 C. Pressure coming down from 7.73e-7 Torr.
Ramping up to 440A.
Friday, November 25, 2022, 13:50
TGHT reached to 440A/7.6V. Temp holding at 1864C. Tapping TGHT to 444A (readback 443A - 449 A)/7.7V.
Desired Temp has reached, 1875 C. Will continue to hold on this temp over the weekend.
Sunday, November 27, 2022, 21:14
TGHT has been holding at 442A (lowered by 2 A on Fri to maintain 1875C). Temp increased to 1887C. Pressure at 2.5e-7 Torr.
See attachment#2 for plots/temp.
Initiated cooling at 1A/min.
|
Attachment 1: striptool_1600C.jpg
|
|
Attachment 2: striptool_1887C.jpg
|
|
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP loaded into a target boat wrapped with 2 layers of Ta-heat shield.
Samples will be heated to 1700, 1800, 1900, and 2000 C
Some of the pieces will be removed after each target temperature
Target chamber has been pumping down and the current pressure reading is 6.62e-6 T
Tuesday, October 18, 2022, 14:12
TGHT will be autoramped to 250 A
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
|
596
|
Wednesday, October 19, 2022, 09:50 |
John Wong | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC |
Hannah Toy wrote: |
Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP loaded into a target boat wrapped with 2 layers of Ta-heat shield.
Samples will be heated to 1700, 1800, 1900, and 2000 C
Some of the pieces will be removed after each target temperature
Target chamber has been pumping down and the current pressure reading is 6.62e-6 T
Tuesday, October 18, 2022, 14:12
TGHT will be autoramped to 250 A
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
|
Wednesday, October 19, 2022, 09:42
TGHT has reached to 250A/3.95V, Temp at ~1100 C. (The archiver is currently not working; already contacted Control to look into it.)
Pressure reached below 4.9 e-7 Torr.
Auto-ramp to 300 A at 2A/min. Continue to monitor.
Wednesday, October 19, 2022, 10:24
TGHT reached to 300 A/4.89V. Temp at 1206 C.
Pressure went up slightly and came down after the TGHT setpoint was reached, see attachment#1.
Continue to auto-ramp to 350A at 2A/min.
Wednesday, October 19, 2022, 11:35
TGHT reached to 350A/5.8V. Temp at 1360C.
Pressure reached above 1e-6 Torr and came down after TGHT reached the setpoint.
Continue to auto-ramp to 400 A at 2A/min
Wednesday, October 19, 2022, 11:57
TGHT reached to 400 A/6.89V. Temp at 1485C.
Pressure went up to 3.3e-6 Torr and came down after TGHT reached the setpoint, see attachment#2.
A temp vs current plot has been generated (see shared folder \Hannah\) - est TGHT 480A to reach 1700 (T1).
Auto-ramp to 420 at 1A/min. Continue to monitor closely...
Wednesday, October 19, 2022, 13:01
TGHT reached 420A/7.23V, Temp at 1520 C.
Continue auto-ramping to 440A at 1A/min.
Wednesday, October 19, 2022, 13:42
TGHT reached 440A/7.65V. Temp at 1572 C
Continue auto-ramping to 460A at 1A/min.
Wednesday, October 19, 2022, 14:10
TGHT reached to 460A/8.10 V. Temp at 1628 C.
Tapping up TGHT to reach 1700 C
Wednesday, October 19, 2022, 15:33
TGHT was tapped up to 474A, Temp reached to 1700 C since 14:30.
Pressure is slowing coming down, currently at 1.4 e-6 Torr.
Will hold at this target current for a few hours.
Wednesday, October 19, 2022, 16:58
Temp went up slightly to 1713 C as the pressure is coming down.
Lower TGHT to 468A/8.45V to maintain the temp at 1700 C.
Wednesday, October 19, 2022, 19:55
Temp went up again to 1716 C, but this time the pressure also went up, see attachment#3. Not sure why the target got hotter... the voltage seems normal and consistent.
Lower TGHT to 462A/8.44V to maintain at 1700 C.
Continue monitoring...
Wednesday, October 19, 2022, 22:56
Temp went up another 10 C, to 1710 C, TGHT is holding at 462 A/8.48V. Notice the TGHT current readback is fluctuating between 458A - 463 A.
Initiated cooling.. 2A/min
Friday, October 21, 2022, 08:55
All the samples were taken out from the Evap on Thursday Oct 20. We decided to do so because there was not enough sample in each batch for XRD analysis. All the sample will be analyzed as treated at 1700 C.
See attachement #$ for the overall TGHT/Vac plot.
|
Attachment 1: Screenshot_2022-10-19_102257.png
|
|
Attachment 2: Screenshot_2022-10-19_120146.png
|
|
Attachment 3: Screenshot_2022-10-19_195305.png
|
|
Attachment 4: Screenshot_2022-10-21_085223.png
|
|
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing.
Monday, June 05, 2023, 15:10: Controller reset. TP on. |
128
|
Thursday, March 27, 2014, 18:04 |
John Wong | | | TARGET BOAT | In progress | Studying WC sintering on Ta surface | Thursday, March 27, 2014, 17:38
TEST #1
WC slurry was prepared in non-aqueous environment (see lab book for procedures). The solution was dripped on two Ta plates (3.1cm2) and let dry.
Another Ta plate (3.1 cm2) was sprayed with TaC coating (for comparison).
All 3 coated Ta plates are put in a target boat and the boat is wrapped with 3 layers of Ta-heat shields.
HS water valves open; no leaks detected.
TGHT will be ramped up to 700A at 2.0A/min.
RGA is running and gases are being monitored. See link:
https://www.dropbox.com/sh/625xl7zgepbybmu/GQJTlMo-5a
Friday, March 28, 2014, 09:13
TGHT reached to 700A and samples were heated up over night.
Cooling down Evap at 4A/min.
Tuesday, April 01, 2014, 17:37
Previous samples, namely WC#1, #2, TC#1 were fully sinterred. See above link for photos.
TEST#2
Samples WC#3, #4, #5 are sprayed coated with WC solution. Grains were pre-treated at 400RPM.
These 3 new samples are loaded in a boat, wrapped with 3 layers of Ta-heat shields.
Chamber is pumped down; no water leaks are detected.
TGHT will be ramped up to 700A at 2.0A/min
RGA is running.
Samples were analyzed with SEM/EDX. The results are inconclusive because W and Ta peaks are very close together. And WC coated layer may be even too thin to analyze.
Monday, April 14, 2014, 16:32
Test#3: Coated WC on Endcap. Total mass WC ~350mg.
Sintered at 500A/9.5V; measure temperature on actual sample surface ~1700C. Sample heated >24hr.
Cooling down TGHT at 2A/min. IG currently at 3.1e-7 Torr.
|
75
|
Tuesday, May 14, 2013, 17:15 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | SinteringTaC coating | Tuesday, May 14, 2013, 17:04
Target oven is coated with TaC, and wrapped with 3-Ta heat shields.
TGHT and TBHT will be ramped up to 820A and 300A, respectively.
Ramping rate set to 1A/min.
Good Vac at 3.e-5 Torr, Bad Vac @ 4.0e-5 Torr.
Chamber is currently being pumped...
Wednesday, May 15, 2013, 10:56
Chamber has pumped down to 4.5e-7 Torr.
HS cooling water valves opened; no leaks were detected.
Stepping up TGHT/TBHT to 80A; monitoring vacuum.
Wednesday, May 15, 2013, 11:26
Pressure is increasing. TGHT setpoint @ 80A, readback @ 88.6A/0.603V, local @ 83A/0.80V.
Wednesday, May 15, 2013, 12:08
TGHT/TBHT stepped up to 140A and tripped off at high limit vacuum.
Restarted p/s and set TBHT/TGHT at 100A
Initiated auto ramping...
Friday, May 17, 2013, 11:39
TGHT and TBHT reached to 820A and 300A, respectively. Target has been heating at the max currents for ~12hrs.
Vacuum is coming down to 4.3e-7 Torr.
The TaC coating sintering is completed.
Autocooling is initiated. TGHT ramping rate @ 2A/min, and 1A/min for TBHT.
Wednesday, May 22, 2013, 10:43
Sintering complete.
Chamber will be vented
|
190
|
Wednesday, May 06, 2015, 13:59 |
Laura Lambert | | 40282-4 | TARGET BOAT | Done | Sintering two different ZrC samples | Wednesday, May 06, 2015, 13:54
Two different samples of ZrC are wrapped in graphite sheet and loaded into the target boat.
Sample #1 = ZrC
Sample #2 = ZrC+C
Both samples are hand punched with a 18mm die.
The target boat is wrapped with 3x Ta heat shield.
Pumped down this morning.
HS water valves opened, no leaks detected.
IGP1 = 1.5e-6 Torr.
Tapping up manually to 35A...
Waited ~50min for vacuum to stabilize.
IGP1 = 5.3e-6 Torr.
Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 275A/ 10V
Good vacuum = 3.00e-5 Torr. Bad vacuum = 4.00e-5 Torr.
Wednesday, May 06, 2015, 15:37
Increasing ramping rate to 0.2A/min
Thursday, May 07, 2015, 11:15
Stopping auto ramp.
TGHT = 273A.
Tapping up manually and recording data...
IGP1 = 6.6e-7 Torr.
Thursday, May 07, 2015, 14:21
Increased max voltage to 14V
Friday, May 08, 2015, 09:33
EVAP2 reached 2000C yesterday evening and remained at max setpoint overnight.
IGP1 = 3.8e-7 Torr
Initiated auto-cool this morning at 2.0A/min.
Friday, May 08, 2015, 11:32
IGP1 = 2.1e-7 Torr
TGHT = 221A, 3.21V
OMEGA = 1100C
Increasing auto-cool to 5.0A/min.
Friday, May 08, 2015, 15:53
Vented in air and opened up this afternoon.
See attachment for data results.
|
Attachment 1: evap2_data_from_two_samples_-_18mm_hand_punched.xlsx
|
192
|
Wednesday, May 13, 2015, 16:01 |
Laura Lambert | | 40282-4 | TARGET BOAT | Done | Sintering three different ZrC samples | Wednesday, May 13, 2015, 15:21
Three different samples of ZrC are loaded into a target boat.
Sample A: ZrC + NO graphite
Sample B: ZrC + graphite [1:0.5 molar ratio]
Sample C: ZrC + graphite [1:1 molar ratio]
Each sample consists of 20 discs, stacked together and wrapped in graphite sheet
The target boat is wrapped with 3 x Ta heat shield.
EVAP2 pumping down overnight...
Thursday, May 14, 2015, 08:20
HS water valves opened up this a.m, no leaks detected.
IGP1 = 6.6e-7 Torr
Tapping up manually to 35A.
Good Vacuum = 3.00 e-5 Torr. Bad Vacuum = 4.00 e-5 Torr.
Thursday, May 14, 2015, 09:51
Tapped up manually to 30A.
After ~25min, vacuum gone up to IGP1 = 3.5e-5 Torr!
Backed off to 20A.
Waited ~10min. IGP1 = 1.75e-5 Torr.
Tapped back up to 25A.
Waited ~20min, IGP1 = 1.4e-5 Torr.
Tapped up to 30A.
Waited ~20min, IGP1 = 2.2e-5 Torr.
Tapped up to 35A
Waited ~50min, IGP1 = 2.5e-5 Torr.
Continuing manual tap-up...
Thursday, May 14, 2015, 13:27
IGP1 = 9e-6 Torr
Tapped up to 40A.
Waited ~45min, IGP1 = 1e-5 Torr
Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 275A/ 8.0V
Friday, May 15, 2015, 08:25
Max setpoints were changed to 400A/ 8.0V last night.
Reached 400A ~4.5hrs ago.
IGP1 = 4.9e-5 Torr
Initiating manual tap up and recording data.
Friday, May 15, 2015, 15:50
Samples remained at ~2000C for ~4 hours [see attachment for data]
IGP1 = 7.8e-7 Torr.
Initiating auto-cool at 1.0A/min.
Tuesday, May 19, 2015, 08:27
Vented in air and opened up this morning.
|
Attachment 1: evap2_data_from_three_samples_-_final_test_run.xlsx
|
130
|
Thursday, May 29, 2014, 18:16 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Purpose: Sinter one sample of each of TiC, VC, Cr3C2, ZrC, NbC, Mo2C, TaC, and WC on 5x10 mm tantalum foil to see if the samples are usable for SEM.
Samples were prepared using a solution of PEG (2.56 g), PVB (2.45 g), paraffin oil (1.12 g), MEK (15 mL), and EtOH (23 mL). Slurries made using 0.0013 mol of each carbide with ~230 uL of the solution. Applied via paintbrush onto 5x10 mm tantalum foil.
The samples were placed directly on the target boat, no graphite layer between. We will check to see if the tantalum foil fuses to the boat or not.
Currently (May 29th), the chamber is still pumping down. John and I will continue the procedure tomorrow.
|
Attachment 1: 01-samples.jpg
|
|
131
|
Friday, May 30, 2014, 13:15 |
Cameron Hodgins | | | | In progress | Sintering several carbides on tantalum foil backing | Pressure down to 7.1e-7 Torr. Water valve to heat shield was opened; pressure remained stable.
Current turned up to 40 A for now. Will increase at 2 A/min up to 500 A over the weekend, then on Monday we will turn it up to 600 A and check the temperature. |
132
|
Friday, June 06, 2014, 16:01 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Auto-ramp started. Max current = 500 A, voltage = 11.05 V. Current is being increased at 2 A/min. In the first 20 minutes, the pressure went up to about 10E-6 T, but has slowly decreased since then. Everything looks ok. The system will be left until Monday morning (June 9th). |
133
|
Monday, June 09, 2014, 13:56 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Manually changed current from 500 to 615 A, monitoring the temperature. Temperature went from 1657 C up to 1838 C. Pressure increased up to 7.2e-7 T. Samples should be left for about 4 hours (615 A started just before 13:00), then the goal is to ramp current back to zero. |
134
|
Monday, June 09, 2014, 17:15 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Target boat is now being cooled at 1 A/min from the starting point (616 A) down to 0 A. |
|