ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
659
|
Friday, April 26, 2024, 06:19 |
Darwin Ortiz Rosales | TaC | 45447-29 | HP-SIS | Done | TaC coating sintering |
Monday, April 29, 2024, 19:50
Started coating with coating stand. |
|
660
|
Wednesday, May 01, 2024, 11:54 |
Darwin Ortiz Rosales | TaC | 25447-27 | HP-SIS | Done | TaC coating sintering | Wednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields. |
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | TaC | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields. |
|
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields. |
|
677
|
Tuesday, September 10, 2024, 13:16 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | A boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr |
|
680
|
Thursday, January 30, 2025, 09:21 |
Darwin Ortiz Rosales | Empty | 45447-30 | HP-SIS | Done | TaC coating sintering | Thursday, January 30, 2025, 09:17
Left to pump down on previous night
The coated container was wrapped |
|
681
|
Saturday, February 01, 2025, 09:24 |
Darwin Ortiz Rosales | Empty | 45447-28 | HP-SIS | Done | TaC coating sintering | Saturday, February 01, 2025, 09:23
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2 |
|
682
|
Monday, March 03, 2025, 17:58 |
Darwin Ortiz Rosales | Empty | 45447-21 | LP-FEBIAD | Done | TaC coating sintering | Monday, March 03, 2025, 17:56
LP FEBIAD WO# 45447-21 initial wt=471.0
g (without T bar) |
|
683
|
Monday, March 10, 2025, 09:56 |
Darwin Ortiz Rosales | Empty | 45447-3 | HP-FEBIAD | Done | TaC coating sintering |
Monday, March 10, 2025, 09:50
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2 |
|
684
|
Wednesday, March 12, 2025, 07:10 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | Tuesday, March 11, 2025, 15:44
The coated container was wrapped
in 3 Ta foil heatshields. |
|
685
|
Tuesday, March 18, 2025, 06:53 |
Darwin Ortiz Rosales | Empty | 45447-6 | LP-IG-LIS | Done | TaC coating sintering | Tuesday, March 18, 2025, 06:48
The coated container was wrapped
in 4 Ta foil heatshields. |
|
686
|
Thursday, March 20, 2025, 06:10 |
Darwin Ortiz Rosales | Empty | 45447-19 | LP-SIS | Done | TaC coating sintering | Wednesday, March 19, 2025, 13:08
The coated container was wrapped
in 4 Ta foil heatshields. |
|
687
|
Tuesday, March 25, 2025, 15:26 |
Darwin Ortiz Rosales | Empty | 45447-16 | LP-SIS | Done | TaC coating sintering | Tuesday, March 25, 2025, 15:25
The coated container as wrapped in
4 Ta foil heatshields. |
|
688
|
Friday, March 28, 2025, 10:34 |
Darwin Ortiz Rosales | Empty | 45447-20 | LP-SIS | Done | TaC coating sintering | Friday, March 28, 2025, 06:49
The coated container was wrapped
in 4 Ta foil heatshields. |
|
504
|
Monday, August 31, 2020, 12:57 |
Marla Cervantes | | 44489-15 | | Done | TaC coating heating test | Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under |
|
320
|
Monday, September 12, 2016, 17:22 |
John Wong | Empty | 39530-9 | HP-SIS | Failed | TaC coating chipped off |
|
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring |
|
456
|
Wednesday, September 11, 2019, 15:16 |
Marla Cervantes | | 44062-4 | LP-SIS | Done | TaC coated target container calibration/conditioning | Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog |
 |
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure. |
|
|