ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
660
|
Wednesday, May 01, 2024, 11:54 |
Darwin Ortiz Rosales | TaC | 25447-27 | HP-SIS | Done | TaC coating sintering | Wednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields. |
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | Ta | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields. |
|
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields. |
|
677
|
Tuesday, September 10, 2024, 13:16 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | A boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr |
|
504
|
Monday, August 31, 2020, 12:57 |
Marla Cervantes | | 44489-15 | | Done | TaC coating heating test | Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under |
|
320
|
Monday, September 12, 2016, 17:22 |
John Wong | Empty | 39530-9 | HP-SIS | Failed | TaC coating chipped off |
|
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring |
|
456
|
Wednesday, September 11, 2019, 15:16 |
Marla Cervantes | | 44062-4 | LP-SIS | Done | TaC coated target container calibration/conditioning | Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog |
|
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure. |
|
592
|
Thursday, September 22, 2022, 07:15 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday, September 22, 2022, 07:13
Each endcap is separated with |
|
607
|
Friday, December 16, 2022, 10:03 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | 4 TaC coated springs and 4 Tac coated caps
loaded into a target boat.
Target boat wrapped in 4 Ta heatshields |
|
614
|
Thursday, March 09, 2023, 06:58 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday,
March 09, 2023, 06:53
2 TaC coated springs and 12 |
|
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs. |
|
486
|
Monday, June 01, 2020, 12:03 |
Aaron Schmidt | Ta | 44139-13 | LP-SIS | In progress | Ta#60 Conditioning | Ta#60 LP-SIS target
description: |
|
279
|
Sunday, March 13, 2016, 14:58 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning | Started Ta#47 heating at Evap2 using the
autoramp program. The TGHT current is setup
to go to 300A (for now) and the TBHT to 230A |
|
280
|
Monday, March 14, 2016, 09:22 |
Laura Lambert | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
281
|
Monday, March 14, 2016, 13:12 |
Anders Mjos | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
282
|
Monday, March 14, 2016, 19:22 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
283
|
Friday, March 18, 2016, 17:13 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|