Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 20 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  299   Tuesday, May 24, 2016, 11:18 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  298   Friday, May 20, 2016, 08:54 Laura LambertSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  297   Thursday, May 19, 2016, 14:38 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC.  To do so, samples will
  
  296   Wednesday, May 11, 2016, 17:24 John Wongnp-SiC TARGET BOATDoneTemperature Treament of Nanofiber SiC/PANWednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN
was prepared at UBC. 
  
  295   Tuesday, May 10, 2016, 11:57 Laura Lambert 40282-3TARGET BOATDoneConditioning Nb samples for Tobias

    

       
            
  
  294   Monday, May 09, 2016, 18:19 John Wong 40282-3TARGET BOATIn progressConditioning Nb samples for Tobias

    

       
            
  
  293   Wednesday, May 04, 2016, 13:45 Laura Lambert 40282-3TARGET BOATIn progressConditioning Nb samples for Tobias Wednesday, May 04, 2016, 13:28
Target boat has a layer of niobium
foil on the bottom of the boat.
 Nb_samples_in_boat_(2).jpg 
  292   Tuesday, May 03, 2016, 14:44 Laura Lambert    VACUUM PUMP REPLACEMENT Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises.
  
  291   Tuesday, April 26, 2016, 13:50 Laura LambertEmpty40860-2LP-IG-LISDonesintering TaC coating on UCx#16 containerTuesday, April 26, 2016, 13:32
Container coated with TaC using
 TaC_coating_sintered1.jpgTaC_coating_sintered2.jpgTaC_coating_sintered3.jpg 
  290   Tuesday, April 19, 2016, 09:28 Anders MjosTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
 2016-03-11_Evaporator_2.4ch2016-03-11_Evaporator_2.xlsx 
  289   Thursday, April 07, 2016, 15:23 John WongSiC TARGET BOATDoneE-spun SiC/PAN thermal treatment Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC.
 SiC_PAN_1400c.PNGarchiver.PNG 
  288   Wednesday, March 30, 2016, 11:32 John Wong Target boatTARGET BOATDoneThermostablization Polycarbosilane Fibers (UBC MTRL Samples)Wednesday, March 30, 2016, 11:30
Polycarbosilane fibers were prepared
by UBC MTRL. 
  
  287   Thursday, March 24, 2016, 12:05 John WongSiC TARGET BOATDoneTest#3: E-spin SiC with PANThursday, March 24, 2016, 11:37  
SiC powder (<1um) [10%] was mixed
with PAN solution [10%].  Solution was
 Screen_Shot_2016-03-26_at_3.39.35_PM.pngTGHT_faulty.PNG 
  286   Thursday, March 24, 2016, 11:32 John WongTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  285   Tuesday, March 22, 2016, 11:31 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  284   Monday, March 21, 2016, 18:57 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  283   Friday, March 18, 2016, 17:13 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  282   Monday, March 14, 2016, 19:22 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  281   Monday, March 14, 2016, 13:12 Anders MjosTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  280   Monday, March 14, 2016, 09:22 Laura LambertTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
ELOG V2.9.2-2455