Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 1 of 25  Not logged in ELOG logo
Entry  Friday, April 11, 2025, 10:44, Darwin Ortiz Rosales, TiC, TiC250304, LP TUBE, In progress, TiC  
 
Friday, April 11, 2025, 06:18
 
Entry  Friday, April 04, 2025, 06:55, Darwin Ortiz Rosales, SiC, 45447-1, HP-FEBIAD, Done, SiC-250402 conditioning 
Friday, April 04, 2025, 06:41
Total number of foils:328 
Entry  Friday, March 28, 2025, 10:34, Darwin Ortiz Rosales, Empty, 45447-20, LP-SIS, Done, TaC coating sintering 
Friday, March 28, 2025, 06:49
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.0e-07 Torr
Entry  Tuesday, March 25, 2025, 15:26, Darwin Ortiz Rosales, Empty, 45447-16, LP-SIS, Done, TaC coating sintering 
Tuesday, March 25, 2025, 15:25
The coated container as wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =e-07 Torr
Entry  Thursday, March 20, 2025, 06:10, Darwin Ortiz Rosales, Empty, 45447-19, LP-SIS, Done, TaC coating sintering 
Wednesday, March 19, 2025, 13:08
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =
Entry  Tuesday, March 18, 2025, 06:53, Darwin Ortiz Rosales, Empty, 45447-6, LP-IG-LIS, Done, TaC coating sintering 
Tuesday, March 18, 2025, 06:48
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =9.1 e-07 Torr
Entry  Wednesday, March 12, 2025, 07:10, Darwin Ortiz Rosales, Endcaps, , TARGET BOAT, Done, TaC coating sintering 
Tuesday, March 11, 2025, 15:44
The coated container was wrapped in 3 Ta foil heatshields.
16 caps and 4 springs
Entry  Monday, March 10, 2025, 09:56, Darwin Ortiz Rosales, Empty, 45447-3, HP-FEBIAD, Done, TaC coating sintering 

Monday, March 10, 2025, 09:50
The coated container was wrapped in 4 Ta foil heatshield and left in evap2  over weekend to decrease pressure.
Target temperature on OMEGA= 1850-1900 C
Entry  Monday, March 03, 2025, 17:58, Darwin Ortiz Rosales, Empty, 45447-21, LP-FEBIAD, Done, TaC coating sintering 
Monday, March 03, 2025, 17:56
LP FEBIAD WO# 45447-21 initial wt=471.0 g (without T bar)
wrapped in 4 Ta heatshields.
Entry  Saturday, February 01, 2025, 09:24, Darwin Ortiz Rosales, Empty, 45447-28, HP-SIS, Done, TaC coating sintering 
Saturday, February 01, 2025, 09:23
The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
Entry  Thursday, January 30, 2025, 09:21, Darwin Ortiz Rosales, Empty, 45447-30, HP-SIS, Done, TaC coating sintering 
Thursday, January 30, 2025, 09:17
Left to pump down on previous night
The coated container was wrapped in 4 Ta foil heatshields.
Entry  Saturday, November 23, 2024, 11:11, Darwin Ortiz Rosales, ZrC, , LP TUBE, Done, ZrC 24E9T1 + std conditioning and sintering 
Saturday, November 23, 2024, 11:08
 No milling ZrC material sintering inside graphite cartridge
baseline standard discs included for comparison. 
Entry  Wednesday, October 02, 2024, 19:24, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, sintering TiC Experiment  
Wednesday, October 02, 2024, 19:21
Ta endcup at front end of container
End-caps on the graphite cartridge have holes for outgassing. 
Entry  Tuesday, September 10, 2024, 13:16, Darwin Ortiz Rosales, Endcaps, , TARGET BOAT, Done, TaC coating sintering 
A boat lined up with graphite and wrapped in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr
Target temperature on OMEGA= 1800-1900 C
Entry  Monday, September 09, 2024, 19:08, Darwin Ortiz Rosales, TaC, , LP-SIS, Done, TaC coating sintering LP-SIS with gas line 
Monday, September 09, 2024, 19:06
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =2.6 e-06 Torr
Entry  Saturday, September 07, 2024, 09:55, Darwin Ortiz Rosales, TaC, 45447-13, LP-SIS, Done, TaC coating sintering 
Saturday, September 07, 2024, 09:54
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-07 Torr
Entry  Friday, August 30, 2024, 11:33, Darwin Ortiz Rosales, TaC, 45447-8, LP-IG-LIS, Done, TaC coating sintering 
Friday, August 30, 2024, 11:31
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =3.1 e-07 Torr
Entry  Monday, August 19, 2024, 13:17, John Wong, np-Ta, , TARGET BOAT, In progress, Carbonization of heat stabilized np-Ta fibres - 2nd Attempt Capture.PNG
Monday, August 19, 2024, 13:06
Target container consists of 2 samples, and both samples were heat stabilized at 150 C for 24 hours then pre-oxidized at 360 C for 4 hours:
1.  PVP (7% wt/v) spun fibres 0.0569 g
Entry  Wednesday, August 14, 2024, 07:23, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems, EVAP2 Calibration - Vanadium  TP-not_speeding_up.JPG
Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on 
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on
    Reply  Wednesday, August 14, 2024, 16:22, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems resolved, EVAP2 Calibration - Vanadium  


    
        
            Marla Cervantes wrote:
        
        
            
            Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
       Reply  Wednesday, August 14, 2024, 16:24, Marla Cervantes, C, 44139-5 SK, LP TUBE, In progress, EVAP2 Calibration - Vanadium  
 
 


    
        

           Marla Cervantes wrote:
        
        

           
            
            
Entry  Wednesday, August 07, 2024, 15:37, Aaron Schmidt, , , , , Turning on EVAP2's turbo pump 
Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.
    Reply  Thursday, August 08, 2024, 11:17, Marla Cervantes, C, 44139-5 SK, LP TUBE, Done, Graphite foils conditioning GraphiteFoil-Conditioning-EVAP2.JPG


    
        
            Aaron Schmidt wrote:
        
        
            
            Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS,
ELOG V2.9.2-2455