ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
72
|
Monday, July 15, 2013, 09:45 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
74
|
Monday, August 05, 2013, 07:52 |
John Wong | UC2 | 38634-7 | LP-SIS | Done | Conditioning UCx # 07 |
|
|
75
|
Thursday, August 22, 2013, 18:00 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 | Thursday, August 22, 2013, 17:31
1st attempt:
UO2/C green was prepared on Aug 14, |
|
77
|
Tuesday, September 10, 2013, 12:20 |
Laura Lambert | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 |
|
|
79
|
Friday, September 20, 2013, 13:49 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2Flk_00 |
|
|
80
|
Friday, October 04, 2013, 15:56 |
John Wong | Empty | | LP-SIS | Done | Ignore this entry - Process was done in Evap2 | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
|
81
|
Friday, October 11, 2013, 18:10 |
John Wong | UC2 | 39814-IV | LP-IG-LIS | Done | UCx#8 - Final Conditioning | Friday, October 11, 2013, 18:00
|
|
84
|
Monday, December 02, 2013, 16:10 |
Anders Mjos | | | | Done | Copper bar on TGHT | The conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: |
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
88
|
Wednesday, February 05, 2014, 14:29 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_01 | Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, |
|
91
|
Wednesday, March 05, 2014, 23:05 |
John Wong | | | TARGET BOAT | Done | Re-sinterring end caps |
|
|
92
|
Monday, March 24, 2014, 17:53 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_02 | Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March
21 and let dry over the weekend. The |
|
93
|
Wednesday, April 30, 2014, 14:58 |
John Wong | UC2 | 39165-9 | LP-SIS | Done | Conditioning UCx#9 | Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2. |
|
95
|
Friday, June 13, 2014, 15:21 |
John Wong | UC2 | 39165-10 | LP-SIS | Done | Conditioning UCx#10 | Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC. It's wrapped |
|
96
|
Friday, July 04, 2014, 10:23 |
John Wong | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils | Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples.
Each sample consists of 5pack ThO2/Nb. |
|
97
|
Wednesday, July 09, 2014, 13:57 |
Laura Lambert | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils |
|
|
98
|
Thursday, August 14, 2014, 17:56 |
John Wong | ThO2 | | LP-SIS | Done | Sintering ThO2#1 | Thursday, August 14, 2014, 17:54
Target container consists of 240
discs of ThO2/Nb discs. The container |
|
99
|
Tuesday, August 26, 2014, 15:27 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_03 | Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20,
2014. The slurry was cast on a piece of glass |
|
101
|
Friday, October 10, 2014, 14:00 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_04 |
|
|
103
|
Monday, October 20, 2014, 16:22 |
John Wong | UC2 | 40282-5 | LP-SIS | Done | Conditioning UCx #11 |
|
|
|