    Reply  Monday, July 15, 2013, 09:45, John Wong, UO2/C, Target boat #2, , Done, Processing UC2 flakes (batch#05 - 18062013) 


    
        
            John Wong wrote:
        
        
            
            
            
              
    Reply  Monday, August 05, 2013, 07:52, John Wong, UC2, 38634-7, LP-SIS, Done, Conditioning UCx # 07 UC#7_final_conditioning.PNG


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, August 01, 2013, 16:16
Entry  Thursday, August 22, 2013, 18:00, John Wong, UO2/C, Target Boat #2, , Done, Processing UC2 flaskes (batch#06 - 08222013 UO2_C_cast.PNGUCx_flakes.PNG
Thursday, August 22, 2013, 17:31
1st attempt: 
UO2/C green was prepared on Aug 14, 2013 (wed).  The slurry was cast on a piece of glass coated with WD40.
    Reply  Tuesday, September 10, 2013, 12:20, Laura Lambert, UO2/C, Target Boat #2, , Done, Processing UC2 flaskes (batch#06 - 08222013 


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Friday, September 20, 2013, 13:49, John Wong, UO2/C, Target Boat #2, , Done, Processing UC2Flk_00 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, September 19, 2013, 15:35
Entry  Friday, October 04, 2013, 15:56, John Wong, Empty, , LP-SIS, Done, Ignore this entry - Process was done in Evap2 
Friday, October 04, 2013, 15:37
A LP target container is coated with TaC.  The container is wrapped with 3 layers to heat shield.  
This container will be used for the graphite tube test.  
Entry  Friday, October 11, 2013, 18:10, John Wong, UC2, 39814-IV, LP-IG-LIS, Done, UCx#8 - Final Conditioning 
 Friday, October 11, 2013, 18:00
 
The target container was previously coated with TaC and sintered in Evap 2.
Entry  Monday, December 02, 2013, 16:10, Anders Mjos, , , , Done, Copper bar on TGHT Current_and_Voltage.pdf
The conductivity of the TGHT circuit will be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: Pumping down. 
Tuesday, December 03, 2013, 09:40: Stepped current up to 600A. Impedance of system ~0.7 mOhm. See attached graph for P(I).
    Reply  Monday, January 27, 2014, 11:03, Laura Lambert, Empty, 40282-1, TARGET BOAT, Done, Sintering Ta target boat with TaC coating IMG_20140128_113257662.jpg


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Wednesday, February 05, 2014, 14:29, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_01 UO2_cast1.jpgUO2_cast2.jpgUO2_target_boat.jpgpre_auto-ramp.JPG
 Wednesday, February 05, 2014, 14:13
1st attempt: 
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40.
    Reply  Wednesday, March 05, 2014, 23:05, John Wong, , , TARGET BOAT, Done, Re-sinterring end caps endcaps_Mar3_2014.PNG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Monday, March 24, 2014, 17:53, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_02 UC2_flakes_batch#09-03242014.PNG
 Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March 21 and let dry over the weekend.  The cast looks pretty good, and it was rolled up and wrapped in a
piece of graphite sheet. 
Entry  Wednesday, April 30, 2014, 14:58, John Wong, UC2, 39165-9, LP-SIS, Done, Conditioning UCx#9 UCx#9_final_conditioning.PNG
Wednesday, April 30, 2014, 14:50
The target container was previously coated with TaC and sintered in Evap 2.
The target is loaded with 250 discs of UCx (material from batch#09_06022014)
Entry  Friday, June 13, 2014, 15:21, John Wong, UC2, 39165-10, LP-SIS, Done, Conditioning UCx#10  
Friday, June 13, 2014, 15:02
Target container was previously coated and sintered with TaC.  It's wrapped with 3-layers of Ta heat shield, including the center block.
The target consists of 280 discs of UCx with 9cm in length.
Entry  Friday, July 04, 2014, 10:23, John Wong, ThO2, 40282-2, TARGET BOAT, Done, Test: Sintering ThO2 with Nb backing foils  2014-07-03_12.29.29.jpgThO_raw_green_sintered_30um.pngpressure_current_plot.PNG
Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples.  Each sample consists of 5pack ThO2/Nb.  (see photos).
The container is wrapped with 3 layers of heat shield. 
    Reply  Wednesday, July 09, 2014, 13:57, Laura Lambert, ThO2, 40282-2, TARGET BOAT, Done, Test: Sintering ThO2 with Nb backing foils  test_batch_full_sintering.JPGjul9_2014_(2).jpg


    
        
            John Wong wrote:
        
        
            
            Friday, July 04, 2014, 10:13
Entry  Thursday, August 14, 2014, 17:56, John Wong, ThO2, , LP-SIS, Done, Sintering ThO2#1 
 Thursday, August 14, 2014, 17:54
Target container consists of 240 discs of ThO2/Nb discs.  The container is not required to be wrapped with Ta-heat shields.  
One end cap is inserted on the left end (wrt to the ionizer pointing into the page).  
Entry  Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03 carbonization.JPG
 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
    Reply  Friday, October 10, 2014, 14:00, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_04 archiver_TGHT&VAC.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, September 23, 2014, 14:54
    Reply  Monday, October 20, 2014, 16:22, John Wong, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 power_bump.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Friday, October 17, 2014, 11:47