Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 9 of 15  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  242   Tuesday, September 24, 2019, 06:53 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #2 Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously
  
  243   Wednesday, September 25, 2019, 14:00 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #3Wednesday, September 25, 2019, 14:00 
The target UCx28 that
  
  244   Friday, September 27, 2019, 18:04 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #4Friday, September 27, 2019, 18:03
The target UCx28 that
 IMG_1393.JPG 
  245   Wednesday, October 02, 2019, 11:07 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #5Monday, September 30, 2019, 10:54 
After being exposed to air for 1.5
hours,
  
  247   Tuesday, October 08, 2019, 09:53 Marla CervantesUC244062-6LP-SISDoneUCx29 ConditioningMonday, October 07, 2019, 09:51 
A TaC coated target
  
  251   Wednesday, November 06, 2019, 11:48 Marla CervantesUC244062-3 LP-SISDoneUCx#30 Conditioning Tuesday, November 05, 2019, 16:43
A TaC coated target container 
  
  276   Friday, September 24, 2021, 15:40 Luca EgoritiTa LP-SISIn progressFull target release test 1 Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active
foils plus 4 active foils.  
  
  277   Friday, November 05, 2021, 13:38 Luca EgoritiTa LP-SISIn progressFull target release test 2 Friday, November 05, 2021, 13:23
Full target loaded with ~500
 Ta-ReleaseTest-2_low-current.JPG 
  284   Friday, October 07, 2022, 08:14 Darwin Ortiz RosalesUO2/C LP-SISDoneC-220928UCx conditioning experimentsFriday, October 07, 2022, 07:55
Cartridge-220928UCx was installed
 Cap_1_221011.pngCap_2.pngcap3.png 
  286   Monday, November 28, 2022, 05:59 Darwin Ortiz RosalesUO2/C LP-SISDoneC221125experimentMonday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr
 Data_summary.png 
  81   Friday, October 11, 2013, 18:10 John WongUC239814-IVLP-IG-LISDoneUCx#8 - Final Conditioning Friday, October 11, 2013, 18:00
 
  
  112   Tuesday, June 30, 2015, 13:31 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13 Tuesday, June 30, 2015, 13:28
Target container was previously
  
  113   Thursday, July 02, 2015, 13:01 John WongUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
  
  114   Friday, July 03, 2015, 13:45 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
 evap1_trip_off_july_3rd.JPG 
  115   Wednesday, July 08, 2015, 10:52 John WongUC240860-1LP-IG-LISDoneConditioning UCx #13

    

       
            
 Screen_Shot_2015-07-09_at_5.20.37_PM.pngpressure_current_plot.PNG 
  132   Wednesday, May 18, 2016, 15:15 Laura LambertUC240860-2LP-IG-LISDoneConditioning UCx#16 Wednesday, May 18, 2016, 15:05
Target container was previously
  
  146   Thursday, April 20, 2017, 11:41 Laura LambertUC242218-1LP-IG-LISDoneConditioning UCx#20 Thursday, April 20, 2017, 11:31
Target container was previously
 6x 
  282   Friday, June 03, 2022, 06:21 Darwin Ortiz RosalesUO2/C42218-4LP-IG-LISDoneUCx#39 reduction
Friday, June 03, 2022, 06:24
  
  45   Tuesday, February 14, 2012, 21:56 John WongUO238481-9LP-FEBIADDoneUO2/Nb sintering process Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process.  
 Screen_shot_2012-02-14_at_9.00.04_PM.pngUO2_Nb_1_striptool.jpg 
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
ELOG V2.9.2-2455