Wednesday, May 18, 2016, 15:15, Laura Lambert, UC2, 40860-2, LP-IG-LIS, Done, Conditioning UCx#16
|
Wednesday, May 18, 2016, 15:05
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping |
Monday, July 11, 2016, 16:00, Laura Lambert, UC2, 41790-3, LP-SIS, Done, Conditioning UCx#17
|
Monday, July 11, 2016, 15:54
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping |
Tuesday, September 20, 2016, 10:49, Laura Lambert, , , TARGET BOAT, Done, RUSH. Sintering end-caps
|
John Wong wrote:
Monday, September 12, 2016, 17:30 |
Friday, September 23, 2016, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_12
|
Friday, September 23, 2016, 16:01
*Note: materials were scaled back small amount since only 48.5g of UO2 was left in bottle when usually 50g required to make slurry
UO2/C green was prepared September 22, 2016. |
Wednesday, October 19, 2016, 16:52, Laura Lambert, UC2, 41790-6, LP-SIS, Done, Conditioning UCx#18
|
Wednesday, October 19, 2016, 16:47
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block using one single |
Monday, November 07, 2016, 13:34, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13
|
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last |
Wednesday, November 16, 2016, 16:41, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_13
|
John Wong wrote:
|
Tuesday, November 29, 2016, 16:20, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_14
|
Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov 23rd, 2016.
The cast peeled off the glass nicely Nov 24th, 2016 and finished drying over the weekend. |
Tuesday, December 20, 2016, 15:03, Laura Lambert, , , , Maintenance, RETURN and SUPPLY valves CLOSED for xmas break
|
|
Thursday, February 16, 2017, 15:09, Laura Lambert, UC2, 42218-12, LP-SIS, Done, Conditioning UCx#19
|
Thursday, February 16, 2017, 15:04
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block |
Friday, March 03, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_15
|
Friday, March 03, 2017, 08:53
UO2/C green was prepared Feb 28th, 2017.
The cast peeled off the glass nicely March 2nd, 2017 and loaded into evap1. |
Thursday, April 20, 2017, 11:41, Laura Lambert, UC2, 42218-1, LP-IG-LIS, Done, Conditioning UCx#20 6x
|
Thursday, April 20, 2017, 11:31
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block |
Tuesday, May 23, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017. |
Wednesday, May 24, 2017, 09:34, Laura Lambert, , , , Maintenance, VACUUM TRIP OFF SETPOINT CHANGED
|
Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point was changed to 8e-4 Torr when previously it was set to 8e-5 Torr.
Vacuum limits were set to stop at 5e-5 Torr and back-off at 6e-5 Torr |
Friday, May 26, 2017, 15:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 6x
|
Laura Lambert wrote:
Tuesday, May 23, 2017, 14:42 |
Friday, May 26, 2017, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote:
|
Monday, May 29, 2017, 08:54, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote:
|
Tuesday, May 30, 2017, 07:43, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote:
|
Monday, June 12, 2017, 15:07, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_17
|
Monday, June 12, 2017, 11:41
UO2/C green was prepared June 7th, 2017.
The cast peeled off the glass nicely June 8th, 2017. |
Wednesday, July 12, 2017, 17:07, Laura Lambert, UC2, 42218-15, LP-SIS, In progress, Conditioning UCx#21
|
Wednesday, July 12, 2017, 17:06
Target container was previously coated with TaC and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block |
|