  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  208   Wednesday, June 13, 2018, 10:20 Marla CervantesUO2/C40282-1TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14 Tuesday, June 12, 2018, 18:20
35 circles of 14 mm
  
  215   Friday, August 03, 2018, 17:49 John WongUC2 LP-SISIn progressConditioning UCx#24Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. 
  
  217   Tuesday, September 04, 2018, 10:18 Marla CervantesUC241369-2 In progressUCx Fully loaded graphite insert thermal test - FL#1.2 Monday, September 03, 2018, 10:17
Graphite insert fully loaded
 180904-UCxFL1-T2-2.png 
  219   Saturday, September 29, 2018, 19:04 John WongUO2/C TARGET BOATIn progressProcessing UC2_flk_22Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process
sheet for details)
 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG 
  221   Thursday, October 11, 2018, 18:13 John WongUC2 LP-SISIn progressConditioning UCx#25Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. 
 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG 
  228   Tuesday, October 30, 2018, 10:17 Marla CervantesUC243044-7 LP-SISIn progressUCx Fully loaded graphite insert thermal test - FL#1 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) 
 Heat_test.JPG 
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  248   Monday, October 28, 2019, 11:23 Marla CervantesUO2/C TARGET BOATIn progressUCx#30 Carbothermal ReductionMonday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum
 UCx30-CarbothramlReduction.JPGUCx30-CurrentDrop.JPG 
  254   Thursday, January 30, 2020, 09:37 Marla CervantesUO2/CP2N-02 In progressP2N target material carbothermal reductionWednesday, January 29 2020, 05:55  
A P2N container  with
  
  271   Saturday, June 05, 2021, 09:14 Marla CervantesUC2 TARGET BOATIn progressUCx#33 Conditioning Saturday, June 05, 2021, 08:57
Target #33 was installed in
  
  276   Friday, September 24, 2021, 15:40 Luca EgoritiTa LP-SISIn progressFull target release test 1 Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active
foils plus 4 active foils.  
  
  277   Friday, November 05, 2021, 13:38 Luca EgoritiTa LP-SISIn progressFull target release test 2 Friday, November 05, 2021, 13:23
Full target loaded with ~500
 Ta-ReleaseTest-2_low-current.JPG 
  278   Wednesday, November 24, 2021, 10:38 Luca EgoritiTa  In progressIPF release testsWednesday, November 24, 2021, 10:38
A first, short "FullTa1"
target was loaded into the evap1. It consists
  
  295   Tuesday, January 14, 2025, 16:28 Darwin Ortiz RosalesUO2/Cconditioning oven#3LP TUBEIn progressUCx250113 reductionTuesday, January 14, 2025, 16:26
 
Cartridge #22 loaded with 211 discs
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  4   Monday, March 28, 2011, 12:29 John WongEmpty38481-8HP-FEBIADDoneFins diffusion bonding March 28, 2011
12:28:  Target oven is wrapped
with 3 Ta-heat shields.  Pumping down
 grab.Kxr912.pnggrab.L10194.png 
  6   Tuesday, March 29, 2011, 10:30     DoneLoss of cooling water updateIt's the NON-ACTIVE water that will go
off.  The evaporator is on sity water,
so it will be OK.
  
  7   Tuesday, April 05, 2011, 10:37 John WongEmpty38481-6HP-FEBIADDoneFins diffusion bonding Tue Apr  5 10:36:53 2011:  Target
oven is wrapped with 3 Ta-heat shields. 
The evaporator is in the process of pumping
 pumping_down.jpgheatingup.jpgcooling_down.jpg 
  8   Wednesday, April 06, 2011, 17:07 John WongEmpty37978-1HP-FEBIADDoneFins diffusion bonding Wed Apr  6 17:06:56 2011: Target oven is
wrapped with 3 Ta-heat shields.  Pumping
down evaporator in progress.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  9   Friday, April 08, 2011, 14:55 John WongEmpty38295-8HP-FEBIADDoneFins diffusion bonding Fri Apr  8 14:51:37 2011:  Target
is wrapped with 3 Ta-heat shields. 
The evaporator has been pumped down for over
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 