ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps) |
 |
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated |
|
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days |
|
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: |
|
233
|
Thursday, March 21, 2019, 09:03 |
Aaron Schmidt | | | | In progress | Evap 1 pump down issue | On Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a |
|
232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
231
|
Thursday, November 22, 2018, 17:32 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Problems | UCx Fully loaded graphite insert - UCx26 | Thursday, November 22, 2018, 17:25
D-shaped discs were cut from |
 |
230
|
Wednesday, October 31, 2018, 15:23 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
229
|
Wednesday, October 31, 2018, 10:30 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Problems | UCx Fully loaded graphite insert thermal test - FL#1 |
|
 |
228
|
Tuesday, October 30, 2018, 10:17 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | In progress | UCx Fully loaded graphite insert thermal test - FL#1 | Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) |
|
227
|
Thursday, October 25, 2018, 09:10 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Done | Processing UC2Flk_22 |
|
|
226
|
Wednesday, October 24, 2018, 20:01 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 |
|
 |
225
|
Tuesday, October 23, 2018, 10:55 |
Marla Cervantes | UC2 | | LP-SIS | Done | Conditioning UCx#25 |
|
  |
224
|
Tuesday, October 23, 2018, 10:49 |
Marla Cervantes | UC2 | | LP-SIS | Problems resolved | Conditioning UCx#25 |
|
|
223
|
Tuesday, October 23, 2018, 10:24 |
Marla Cervantes | UC2 | | LP-SIS | Problems | Conditioning UCx#25 |
|
|
222
|
Monday, October 22, 2018, 17:58 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 | Monday, October 22, 2018, 17:55
UO2/C green was prepared , September |
 |
221
|
Thursday, October 11, 2018, 18:13 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#25 | Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. |
 |
220
|
Saturday, September 29, 2018, 20:53 |
John Wong | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
219
|
Saturday, September 29, 2018, 19:04 |
John Wong | UO2/C | | TARGET BOAT | In progress | Processing UC2_flk_22 | Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process
sheet for details) |
  |
218
|
Friday, September 21, 2018, 10:22 |
Anders Mjos | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
|