Wednesday, November 16, 2016, 16:41, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_13
|
John Wong wrote: |
Laura Lambert wrote: |
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last batch]
The cast peeled off the glass nicely Nov 4th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.16g (Inventory R-01032A, UO2 + bottle = 1078.15g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 61.91g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, IG1 = 2.4e-5 Torr.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, November 08, 2016, 07:43
IG1 = 2.4e-6 Torr
Tapped up to 35A, 0.50V
Waited ~50min, vacuum stable.
IG1 = 1.3e-5 Torr
Initiating auto-ramp
|
Tuesday, November 15, 2016, 09:59
TGHT reached to 520A/5.12V; however the pressure was still remained high at the limit 5.0e-5 Torr which indicating that the carbonization process isn't complete yet.
Increase TGHT to 520A at a ramping rate of 0.1A/min.
|
Wednesday, November 16, 2016, 11:55
*John increased maxTGHT setpoint to 530A not 520A
When the TGHT reached 520A, the vacuum was still at it's limit. Usually the vacuum starts to drop and stabilize slightly before the max setpoint is reached.
In the photo from UCx_flk10 at ~490A, the vacuum started to drop indicating the carbonization process was complete.
In the image posted from the current carbonization process one can see the vacuum was still at its limit when the TGHT reached its max set point of 520A meaning the carbonization process remains incomplete.
Thursday, November 17, 2016, 07:36
Vacuum still high, carbonization remains incomplete.
Remained at 530A for ~18hrs
TGHT = 530A, 5.24V
IG1 = 3.8e-5 Torr
Increasing max setpoint to 540A.
Thursday, November 17, 2016, 13:54
Vacuum remains high after ramping up to 540A, IG1 = 4.5e-5 Torr - still not fully carbonized
TGHT = 540A, 5.36V
Increasing max setpoint to 550A
Thursday, November 17, 2016, 15:29
Vacuum still high
Increasing max setpoint to 580A
See excel to confirm this remains under 4kW
Wouldn't want to go much above 4kW otherwise container will break
Friday, November 18, 2016, 13:14
Vacuum stable and decreasing - carbonization process complete.
Evap1 has remained at max setpoints for ~6.5hrs
IG1 = 5.6e-6 Torr
TGHT = 580A, 5.69V
Initiating auto-cool at 1.0A/min
Monday, November 21, 2016, 16:20
Vented in Ar and opened up evap1 today.
Stored in glove box.
UC2 flakes produced = 47.23g
|
Tuesday, November 29, 2016, 16:20, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_14
|
Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov 23rd, 2016.
The cast peeled off the glass nicely Nov 24th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.61g (Inventory R-01032A, UO2 + bottle = 1028.05g before use)
Graphite powder used = 10.16g
Green cast dried UO2/C + organic mass = 61.94g
The green was rolled up and wrapped in a piece of graphite sheet.
A new Ta target boat is being used due to the previous one being old and is now very expanded.
The last round of flakes being carbonized [UC2flk_13] showed a slight change in current and power from previous carbonization process', also indicating the target boat should be retired.
The new boat has only been used once in evap1 to sinter some endcaps earlier in the year.
This target boat is slightly different than the old one because both ends are open, no endcaps are attached to the boat.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down...
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, November 30, 2016, 13:09
IG1 = 3.2e-6 Torr
Tapped up to 35A, 0.34V
Waited ~2hrs, vacuum stable.
IG1 = 8.7e-6 Torr
Initiating auto-ramp
Monday, December 12, 2016, 09:15
Vacuum stable - carbonization process complete.
Evap1 remained at max setpoints over wknd
IG1 = 1.47e-6 Torr
TGHT = 520A, 5.12V
Initiating auto-cool at 1.0A/min
Tuesday, December 13, 2016, 16:30
Vented in Ar and opened up evap1 today.
As previously mentioned this new target boat has no endcaps and one can see in the photo more materials have dispersed onto the sides of evap1
These materials appear to be mostly graphite since there are no visible holes through the graphite wrapping that surrounds the UC2 flakes.
Stored in glove box.
|
Friday, March 03, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_15
|
Friday, March 03, 2017, 08:53
UO2/C green was prepared Feb 28th, 2017.
The cast peeled off the glass nicely March 2nd, 2017 and loaded into evap1.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.08g (Inventory R-01032A, UO2 + bottle = 977.24g before use)
Graphite powder used = 10.05g
Green cast dried UO2/C + organic mass = 63.21g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber pumped down overnight.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 3.2e-6 Torr
Tapped up to 35A, 0.40V
Waited ~5hrs, vacuum stable.
IG1 = 6.8e-6 Torr
Initiating auto-ramp
Monday, March 06, 2017, 08:47
Evap1 tripped off fri night.
See attached screenshot of strip tool.
Had continued to ramp up and was at ~340A, but since the power supply had tripped off this was not actually being applied.
TGHT set back to zero, auto-ramp turned off.
Will investigate further before re-starting...
Tuesday, March 07, 2017, 09:50
Have not figured out reasoning behind power trip.
According to controls, there were no power bumps at that time.
Water was still on - had not tripped off.
Tapped back up manually to 40A yesterday morning.
Remained at 40A overnight.
IG1 = 4.46e-6 Torr this morning.
TGHT = 40A, 0.38V
Re-initiated auto-ramp.
Monday, March 13, 2017, 15:46 by AM
IG1 = 5.2E-5 Torr
TGHT= 436A 4.28V
Thursday, March 16, 2017, 08:37 by AM
TGHT reached 520A @ 5.37V this morning. Vacuum at 6.2E-6 Torr
Friday, March 17, 2017, 08:21 by AM
520A @ 5.37V this morning. Vacuum at 2.2E-6 Torr
Ramping down
Thursday, April 20, 2017, 11:44
John removed this while I was away - forgot to mark as done
|
Tuesday, May 23, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 15:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 6x
|
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:54, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Tuesday, May 30, 2017, 07:43, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Tuesday, May 30, 2017, 07:41
Still unsure as to why evap1 tripped off again.
Put evap1 back under vacuum/ turned turbo pump on and opened isolation valve yesterday afternoon.
Vacuum good this morning...nothing tripped off...
Tuesday, May 30, 2017, 08:21
IG1 = 2.3e-6 Torr
Tapped up manually to 40A, 0.24V
Waited ~1hr
IG1 = 4.5e-6 Torr
Initiated auto-ramp at 0.2A/min up to a final setpoint of 250A
Wednesday, May 31, 2017, 09:37
IG1 = 2.4e-6 Torr
TGHT = 250A, 2.57V
Increasing max setpoint to 275A [the trip off point] at a rate of 0.2A/min
Vacuum is currently stable and low; increasing limits to:
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Wednesday, May 31, 2017, 13:39
IG1 = 3.7e-6 Torr
TGHT = 275A, 2.80V
Increasing max setpoint to final setpoint of 520A at a rate of 0.2A/min
Vacuum is currently stable and low; keeping current limits.
Wednesday, May 31, 2017, 15:57
IG1 = 8.14e-6 Torr
TGHT = 300A, 3.08V
Vacuum stable.
Decreasing ramping rate to 0.1A/min for overnight heating.
turbo pump = 40.5C; room temp = 25.1C
Thursday, June 01, 2017, 09:00
IG1 = 4.2e-5 Torr
TGHT = 396A, 4.06V
Vacuum stable.
Increasing ramping rate to 0.2A/min.
turbo pump = 41.6C; room temp = 24.3C
Thursday, June 01, 2017, 13:18
IG1 = 1.25e-4 Torr
TGHT = 439A, 4.48V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 42.3C; room temp = 24.6C
Thursday, June 01, 2017, 15:48
IG1 = 1.95e-4 Torr
TGHT = 467A, 4.81V
Vacuum stable.
Changing vacuum limits and ramping rate for heating overnight.
Decreasing ramping rate to 0.1A/min
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 44.1C; room temp = 25.3C
Friday, June 02, 2017, 07:19
IG1 = 1.26e-4 Torr
TGHT = 473A, 4.77V
Vacuum stable.
Changing vacuum limits and ramping rate.
Increasing ramping rate to 0.2A/min
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Friday, June 02, 2017, 10:18
IG1 = 2.04e-4 Torr
TGHT = 498A, 5.08V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 3.0e-4 Torr, backing off at 5.0e-4 Torr.
Fan has been inserted - pointed at turbo pump, TP temp's have decreased.
tp = 32.1C; rt = 24.7C
Friday, June 02, 2017, 13:22
IG1 = 2.4e-4 Torr
TGHT = 520A, 5.40V
Vacuum stable and decreasing.
Carbonization process almost complete.
Will remain at max setpoints over the weekend.
TP = 28.2C; RT = 24.5C
Monday, June 05, 2017, 08:51
IG1 = 1.75e-6 Torr
TGHT = 520A, 5.29V
Carbonization process complete!
Remained at max setpoints over the weekend.
Initiating auto cool at 1.0A/min
Tuesday, June 06, 2017, 15:56
Vented in Ar and removed today.
Currently in glove box.
Monday, June 12, 2017, 11:44
Flakes produced: 48.00g
|
Monday, June 12, 2017, 15:07, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_17
|
Monday, June 12, 2017, 11:41
UO2/C green was prepared June 7th, 2017.
The cast peeled off the glass nicely June 8th, 2017.
Initial UO2 powder used = 50.10g (Inventory R-01032A, UO2 + bottle = 776.36g before use)
Graphite powder used = 10.06g
Green cast dried UO2/C + organic mass = 62.98g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield [reused from last carbonization] and installed in evap1 this morning.
Chamber pumped down.
Target boat will be ramped up to 520A.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 1.58e-5 Torr
Tapped up to 30A, 0.21V
Waited ~1hr45, vacuum stable.
IG1 = 8.59e-6 Torr
Initiating auto-ramp at 0.1A/min
Tuesday, June 13, 2017, 10:32
IG1 = 5.0e-5 Torr
TGHT = 65A, 0.47V
Vacuum currently yo-yo-ing, but stable.
Changing vacuum limits.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Increasing ramping rate to 0.2A/min.
Thursday, June 15, 2017, 16:24
IG1 = 1.96e-4 Torr
TGHT = 520A, 5.18V
TGHT has reached 520A, the vacuum remains at it's limit.
Vacuum usually drops and stabilizes slightly before the max setpoint is reached indicating carbonization process complete.
Since vacuum remains high, this indicates the carbonization remains incomplete.
Conditions have changed such as vacuum limits, which has greatly sped up the process.
This increase in speed could have an impact on the current at which the carbonization occurs.
Increasing max setpoint to 530A and re-initiating auto-ramp.
Friday, June 16, 2017, 08:32
Vacuum stable, started decreasing when TGHT reached 530A - carbonization process complete.
Evap1 has remained at max setpoints for ~11hrs, but has remained at low vacuum for ~5hrs.
IG1 = 5.56e-6 Torr
TGHT = 530A, 5.31V
Initiating auto-cool at 1.0A/min
TP = 24.9C, RT = 24.3C
*note TP now has water cooling as well as fan pointed at it for this entire process
Monday, June 19, 2017, 16:16
Vented in Ar and transferred from evap1 to glove box this a.m
UC2 flakes produced = 48.66g
|
Wednesday, August 23, 2017, 15:54, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1
|
Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast onto a graphite sheet in the fume hood and let dry.
For this round of samples, circles from cast 1 were used
Graphite powder used = 5.16g
A 14mm punch was used to punch out circles from a 16mm wide strip.
35 circles were packed into a graphite sample container.
graphite container [no endcap] = 3.37g
35 x UO2/C circles = 4.76g
graphite container+smpls = 8.13g
container+smpls+endcap = 10.08g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered - 1st use of newly sintered boat.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
Friday, August 25, 2017, 09:59
IG1 = 3.45e-6 Torr.
Stepped up manually to 80A.
Vacuum stable.
IG1 = 3.0e-5 Torr.
Initiating auto-ramp.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Monday, August 28, 2017, 08:09
IG1 = 6.3e-6 Torr
TGHT = 455A, 4.65V
Vacuum stable.
Increasing ramping rate to 0.2A/min.
Monday, August 28, 2017, 08:53
IG1 = 7.3e-6 Torr
TGHT = 465A, 4.75V
Vacuum stable.
Increasing ramping rate to 0.5A/min.
Monday, August 28, 2017, 13:17
IG1 = 1.32e-5 Torr
TGHT = 520A, 5.44V
Vacuum still fairly high and not dropping very fast indicating carbonization incomplete.
Increasing max setpoint to 530A and restarting auto-ramp.
Monday, August 28, 2017, 15:13
IG1 = 1.32e-5 Torr
TGHT = 530A, 5.58V
Vacuum still high, wavering up and down/ not dropping - carbonization remains incomplete.
Increasing max setpoint to 540A and restarting auto-ramp.
Tuesday, August 29, 2017, 09:28
IG1 = 3.72e-6 Torr
TGHT = 540A, 5.66V
Carbonization complete.
Initiating auto-cool at 2.0A/min
|
Wednesday, September 27, 2017, 12:05, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_18
|
Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept 20th, 2017.
The cast peeled off the glass Sept 22nd, 2017 - not quite enough 'special' ingredient.
UO2 stuck to glass around edges of cast - a lot of flakes produced while peeling off.
Initial UO2 powder used = 50.00g (Inventory R-01032A, UO2 + bottle = 726.38g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 60.38g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield [reused from last 1stepUCx] and installed in evap1 yesterday afternoon.
Chamber pumped down overnight.
Target boat will be ramped up to 520A.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 3.5e-6 Torr
Tapped up to 30A, 0.43V
Waited ~50min, vacuum stable.
IGP1 = 8.6e-6 Torr
Initiating auto-ramp at 0.1A/min
Wednesday, September 27, 2017, 13:28
IGP1 = 1.4e-5 Torr
TGHT = 38.5A, 0.48V
Vacuum stable.
Changing vacuum limits and ramping rate.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Increasing ramping rate to 0.2A/min.
Thursday, September 28, 2017, 08:41
IGP1 = 3.26e-5 Torr
TGHT = 174A, 1.71V
Vacuum stable.
Increasing ramping rate to 0.5A/min.
Thursday, September 28, 2017, 09:56
IGP1 = 4.85e-5 Torr
TGHT = 195A, 1.92V
Vacuum initially climbed a small amount with last increase, has started to decrease - vacuum stable.
Increasing ramping rate to 1.0A/min.
Thursday, September 28, 2017, 10:30
IGP1 = 5.3e-5 Torr
TGHT = 220A, 2.18V
Vacuum increased slightly again with faster ramping rate.
Vacuum now dropping - stable.
Increasing ramping rate to 2.0A/min.
Thursday, September 28, 2017, 11:07
IGP1 = 6.35e-5 Torr
TGHT = 302A, 3.09V
Vacuum increased slightly again with faster ramping rate.
Vacuum now dropping - stable.
Increasing ramping rate to 2.5A/min.
Thursday, September 28, 2017, 11:45
IGP1 = 1.67e-4 Torr
TGHT = 380A, 4.04V
Vacuum increased normally at slow rate for first half hour.
~30min into the 2.5A/min rate increase, vacuum started to climb much faster.
Paused auto-ramp for few min to allow vacuum to stabilize.
Vacuum decreasing - stable.
IGP1 = 1.4e-4 Torr
Decreasing ramping rate to 0.5A/min for next hour while unable to watch.
Thursday, September 28, 2017, 13:20
IGP1 = 1.93e-4 Torr
TGHT = 425A, 4.58V
Vacuum stable.
Changing vacuum limits and ramping rate.
Increasing ramping rate 1.0A/min.
Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.
Thursday, September 28, 2017, 14:06
IGP1 = 3.1e-4 Torr
TGHT = 456A, 4.93V
Vacuum stable.
Changing vacuum limits and ramping rate.
Changing ramping rate to 0.5A/ 30sec.
Vacuum limit stop at 4.0e-4 Torr, backing off at 7.0e-4 Torr.
Thursday, September 28, 2017, 14:44
IGP1 = 4.0e-4 Torr
TGHT = 468A, 5.07V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 5.0e-4 Torr, backing off at 8.0e-4 Torr.
Thursday, September 28, 2017, 15:49
TP thermocouple = 28.1C
IGP1 = 5.0e-4 Torr
TGHT = 485A, 5.25V
Vacuum stable.
Changing ramping rate for overnight heating.
Decreasing ramping rate to 0.5A/min.
Friday, September 29, 2017, 09:11
TP thermocouple = 26.1C
IGP1 = 5.0e-6 Torr
TGHT = 520A, 5.60V
Vacuum stable.
Carbonization process complete!
Evap1 has remained at max setpoints for ~13hrs
Initiating auto-cool at 1.0A/min
Tuesday, October 03, 2017, 10:09
Vented in Ar and transferred from evap1 to glove box yesterday.
|
Tuesday, October 10, 2017, 14:16, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_19
|
Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct 4th, 2017
The cast peeled off the glass nicely Oct 6th, 2017
Initial UO2 powder used = 50.26g (Inventory R-01032A, UO2 + bottle = 676.34g before use)
Graphite powder used = 10.12g
Green cast dried UO2/C + organic mass = 61.30g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield [reused] and installed in evap1 this morning.
Chamber currently pumping down.
Target boat will be ramped up to 520A.
Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.
Wednesday, October 11, 2017, 09:06
IGP1 = 1.74e-6 Torr
Tapped up to 35A, 0.29V
Waited ~70min, vacuum stable.
IGP1 = 6.9e-6 Torr
Initiating auto-ramp at 0.2A/min
Wednesday, October 11, 2017, 13:06
IGP1 = 3.1e-4 Torr
TGHT = 61A, 0.49V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 5.0e-4 Torr, backing off at 8.0e-4 Torr.
Thursday, October 12, 2017, 08:31
IGP1 = 1.06e-5 Torr
TGHT = 275A, 2.55V
Vacuum stable.
Increasing ramping rate to 0.5A/min.
Thursday, October 12, 2017, 09:03
IGP1 = 1.47e-5 Torr
TGHT = 290A, 2.70V
Vacuum stable.
Increasing ramping rate to 1.0A/ 30sec.
Friday, October 13, 2017, 08:30
IGP1 = 5.8e-6 Torr
TGHT = 520A, 4.98V
Vacuum stable.
Carbonization process complete!
Evap1 has remained at max setpoints for ~17hrs
Initiating auto-cool at 1.0A/min
Tuesday, October 17, 2017, 15:01
TGHT had sat at 0A for at least 24hrs.
At ~3:30-4am this morning everything tripped off. The only thing remained on was the roughing pump.
Power bump? Did someone accidentally turn it off? Will follow up on this...
Vacuum was sitting at ~3.5e-2Torr when I noticed today.
Most vacuum had been lost, but there was still a small vacuum - materials should be okay.
Purged and vented in Ar.
Transferred materials to glove box.
|
Tuesday, November 14, 2017, 16:16, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2
|
Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.43g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
Wednesday, November 15, 2017, 08:53
IGP1 = 1.6e-6 Torr
Tapping up manually...
Wednesday, November 15, 2017, 11:59
IGP1 = 5.0e-5 Torr
Tapped up entire process manually to 520A in 3hrs!!!
TGHT = 520A, 4.98V
Vacuum coming down nicely indicating carbonization process complete
Will remain at max setpoint for 4hrs to ensure full carbonization before cooling down later this afternoon.
Wednesday, November 15, 2017, 15:16
IG1 = 8.65e-6 Torr
TGHT = 520A, 4.92V
Carbonization complete.
Initiating auto-cool at 2.0A/min
Monday, November 20, 2017, 13:28
Evap1 was vented in argon and sample removed/ transfered to glove box on friday.
Discs look good, slightly lighter grayer compared to production UCx discs after second cast but before final carbonization.
Material seems to adhere to graphite backing foil well, no flakes coming off from just moving discs around.
Weight of 35 carbonized discs = 4.387g
Weight loss = 5.43g - 4.387g = 1.043g
|
Thursday, November 23, 2017, 13:39, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#3
|
Thursday, November 23, 2017, 13:34
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.75 g
Graphite container = 5.38 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
Friday, November 24, 2017, 12:48
IGP1=1.3e-6 Torr
TGHT = 520A, 4.98V
Vacuum went down indicating carbonization.
Will remain at max setpoint for the weekend.
Monday, November 27, 2017, 09:58
IG1 = 2.6e-6 Torr
TGHT = 520A, 5.1V
Carbonization complete in 3 hrs and 30 min.
Initiating auto-cool at 2.0A/min
Wednesday, November 27, 2017, 13:10
IEVAP was vented in argon and sample removed/transferred to glove box on Friday. |
Wednesday, January 10, 2018, 14:44, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#4
|
Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.75 g
Graphite container = 5.38 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down. |
Friday, January 12, 2018, 07:46, Laura Lambert, UO2/C, , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#4
|
Marla Cervantes wrote: |
Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.75 g
Graphite container = 5.38 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
|
Friday, January 12, 2018, 07:43
IGP1 = 0.0266 Torr
TGHT = 520A, 5.92V
Voltage has been climbing consistently since it has reached it's max setpoint, gone up ~0.8V in ~18hrs
Carbonization complete.
Initiating auto-cool at 2.0A/min
Will update later with more information on this process.
Friday, January 12, 2018, 09:47
Turned the turbo pump back on, to ensure safe cooling.
|
Wednesday, January 17, 2018, 13:47, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#5
|
Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 5.58 g
Graphite container = 5.22 g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.
Chamber currently pumping down.
Tuesday, January 16, 2018, 13:41
Initial IGP1 = 9x10e-7 Torr
Tapped up entire process manually to 520A in 1.5 hrs
TGHT = 525 A, 5.64 V
Vacuum coming down nicely indicating carbonization process complete
Will remain at max setpoint overnight to ensure full carbonization before cooling down.
Wednesday, January 17, 2018, 10:30
Initiating auto-cool at 2.0A/min
Wednesday, January 17, 2018, 4:30
Vented with Argon and removed form evaporator 1
|
Thursday, January 18, 2018, 11:56, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4
|
Laura Lambert wrote: |
Marla Cervantes wrote: |
Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.75 g
Graphite container = 5.38 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
|
Friday, January 12, 2018, 07:43
IGP1 = 0.0266 Torr
TGHT = 520A, 5.92V
Voltage has been climbing consistently since it has reached it's max setpoint, gone up ~0.8V in ~18hrs
Carbonization complete.
Initiating auto-cool at 2.0A/min
Will update later with more information on this process.
Friday, January 12, 2018, 09:47
Turned the turbo pump back on, to ensure safe cooling.
|
Monday, January 15, 2018, 10:00
Vented with Argon and removed from evap1
NB: The initial mass of the UO2/C discs was 5.9 g
The final mass of the UCx discs was 4.614 g |
Friday, January 19, 2018, 12:32, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6
|
Friday, January 19, 2018, 12:29
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.69 g
Graphite container = 6.84 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
|
Monday, January 22, 2018, 15:51, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6
|
Marla Cervantes wrote: |
Friday, January 19, 2018, 12:29
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.69 g
Graphite container = 6.84 g
Graphite container is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
|
Monday, January 22, 2018, 15:48
A power outage on Sunday tripped off EVAP1. |
|