    Reply  Wednesday, November 16, 2016, 16:41, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_13 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, November 29, 2016, 16:20, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_14 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg
 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov 23rd, 2016.
The cast peeled off the glass nicely Nov 24th, 2016 and finished drying over the weekend.
Entry  Friday, March 03, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_15 evap1_tripped_off_UCxFlk_15.jpg
 Friday, March 03, 2017, 08:53
UO2/C green was prepared Feb 28th, 2017.
The cast peeled off the glass nicely March 2nd, 2017 and loaded into evap1.
Entry  Tuesday, May 23, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS UCxFlk_16_temp_readout.jpg
 Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
    Reply  Friday, May 26, 2017, 15:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 6x


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, May 23, 2017, 14:42
    Reply  Friday, May 26, 2017, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Monday, May 29, 2017, 08:54, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS evap1_tripped_off_roud2_UCxFlk_16.jpgevap1_tripped_off_roud2_UCxFlk_16(2).jpg


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Tuesday, May 30, 2017, 07:43, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Monday, June 12, 2017, 15:07, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_17 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG
 Monday, June 12, 2017, 11:41
UO2/C green was prepared June 7th, 2017.
The cast peeled off the glass nicely June 8th, 2017.
Entry  Wednesday, August 23, 2017, 15:54, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1 IMG_1768.JPGIMG_1774.JPG
 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast onto a graphite sheet in the fume hood and let dry.
For this round of samples, circles from cast 1 were used
Entry  Wednesday, September 27, 2017, 12:05, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_18 
 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept 20th, 2017.
The cast peeled off the glass Sept 22nd, 2017 - not quite enough 'special' ingredient.
Entry  Tuesday, October 10, 2017, 14:16, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_19 
 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct 4th, 2017
The cast peeled off the glass nicely Oct 6th, 2017
Entry  Tuesday, November 14, 2017, 16:16, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2 striptool.JPG
 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
Entry  Thursday, November 23, 2017, 13:39, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 171124_1e-1.jpg
 Thursday, November 23, 2017, 13:34
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
Entry  Wednesday, January 10, 2018, 14:44, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#4 
 Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
    Reply  Friday, January 12, 2018, 07:46, Laura Lambert, UO2/C, , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#4 


    
        
            Marla Cervantes wrote:
        
        
            
             Wednesday, January 10, 2018, 14:44
Entry  Wednesday, January 17, 2018, 13:47, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#5 Carbonization-Batch5-180118.docx
 Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 5.58 g
    Reply  Thursday, January 18, 2018, 11:56, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4 Carbonization-Batch4-110118-TP_off.docx


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Friday, January 19, 2018, 12:32, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 
 Friday, January 19, 2018, 12:29
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
    Reply  Monday, January 22, 2018, 15:51, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 


    
        
            Marla Cervantes wrote:
        
        
            
             Friday, January 19, 2018, 12:29