35
|
Wednesday, September 07, 2011, 15:40 |
Anders Mjos | Empty | | | Maintenance | Re-sealing of Glove Box | 2011-09-01:
Glove box was leaking
(air/argon) between base and box. Light was |
|
34
|
Wednesday, September 07, 2011, 13:41 |
John Wong | TaC | 38634-6 | LP-SIS | Done | TaC#1: Sintering and Organics burn-off | Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125 |
|
33
|
Wednesday, September 07, 2011, 13:33 |
John Wong | Empty | | | Maintenance | Changed Evaporator#1 Backing Pump oil | Wednesday, September 07, 2011, 11:18:
IEVAP:CG2 @ 52mT before oil change.
Edi D.V changed the oil for the backing |
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
31
|
Tuesday, August 30, 2011, 16:30 |
John Wong | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps |
|
|
30
|
Tuesday, August 30, 2011, 09:31 |
Anders Mjos | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps | Tuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping |
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the
carbonization process, two cameras were setup |
|
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply. |
|
22
|
Wednesday, May 18, 2011, 13:13 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 18 13:12:24 2011: Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being |
6x |
21
|
Tuesday, May 17, 2011, 16:43 |
John Wong | | | | Maintenance | Evaporator Ion gauge replaced | The evaporator ion gauge filament burnt
out on May 11, 2011. A target was in
the evaporator at that time and was about |
|
20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |
9x |
19
|
Tuesday, May 10, 2011, 14:58 |
John Wong | Empty | 38817-2 | HP-SIS | Done | Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) | Tue May 10 14:56:05 2011: Target
is wrapped with 3 heat-shields. The
evaporator is pumping down, vac @ 4.72e-6 |
|
18
|
Monday, May 09, 2011, 16:10 |
John Wong | Empty | 38817-1 | HP-SIS | Done | Diffusion bonding of Ta Fins | Mon May 9 16:09:35 2011: Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down. |
|
17
|
Wednesday, April 20, 2011, 16:42 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Sintering target oven coated with TaC | Wed Apr 20 16:39:46 2011: Target
oven was coated with TaC early today.
The target was allowed to dry and then wrapped |
|
16
|
Monday, April 18, 2011, 18:14 |
John Wong | Empty | 38295-8 | HP-FEBIAD | Problems | Sintering target oven coated with TaC | Mon Apr 18 18:10:53 2011:
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb |
|