78
|
Thursday, September 19, 2013, 15:41 |
Laura Lambert | UO2/C | Target Boat #2 | | In progress | Processing UC2 flakes (batch #07 - 09192013) | Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass |
|
79
|
Friday, September 20, 2013, 13:49 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2Flk_00 |
|
|
82
|
Friday, November 01, 2013, 13:08 |
Anders Mjos | | | | Maintenance | Gloves, window and window gasket replaced. | Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG). |
|
83
|
Monday, December 02, 2013, 16:09 |
Anders Mjos | | | | Problems resolved | TGHT connector repositioned and tightened | The right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance |
|
84
|
Monday, December 02, 2013, 16:10 |
Anders Mjos | | | | Done | Copper bar on TGHT | The conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: |
|
105
|
Thursday, December 11, 2014, 10:17 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays. |
|
106
|
Friday, January 23, 2015, 15:02 |
Laura Lambert | | | | Maintenance | water supply turned back on to EVAP1 and fume hoods | Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods |
|
110
|
Tuesday, April 21, 2015, 11:28 |
Laura Lambert | | | | Maintenance | Ion Gauge replaced March 23rd 2015 | |
|
119
|
Saturday, August 29, 2015, 16:12 |
Anders Mjos | | | | Problems | Restarting vacuum after power outage | Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo |
|
130
|
Tuesday, April 19, 2016, 10:48 |
Laura Lambert | UC2 | *** | | Done | ***ALL FUTURE UCx TARGETS*** | Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. |
|
131
|
Monday, May 16, 2016, 15:52 |
Laura Lambert | | | | | Full clean of EVAP1 | Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.
|
|
143
|
Tuesday, December 20, 2016, 15:03 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | |
|
148
|
Wednesday, May 24, 2017, 09:34 |
Laura Lambert | | | | Maintenance | VACUUM TRIP OFF SETPOINT CHANGED | Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously |
|
153
|
Wednesday, June 07, 2017, 12:48 |
Aaron Schmidt | | | | | Turbo pump cooling | Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump. |
|
156
|
Thursday, July 13, 2017, 12:49 |
Laura Lambert | | | | Problems | *hot lab is HOT* | Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! |
|
163
|
Thursday, July 27, 2017, 09:08 |
Laura Lambert | | | | Problems resolved | *hot lab is HOT* |
|
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected |
|
166
|
Wednesday, September 20, 2017, 08:07 |
Aaron Schmidt | | | | Maintenance | Ion gauge & RP status | Wednesday, September 20, 2017, 08:00:
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old |
|
167
|
Thursday, September 21, 2017, 11:35 |
Laura Lambert | Empty | | | Done | Testing TBHT [1st run!], RP [new oil] and IG [new gauge] | Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied. |
|
170
|
Tuesday, November 07, 2017, 11:57 |
Laura Lambert | | | | Maintenance | Interlocks limits changed to 100mTorr | Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray |
|