  13   Thursday, April 14, 2011, 09:53 John WongEmpty37810-1HP-FEBIADDoneFins Diffusion bonding Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. 
 cooling_down.jpg 
  15   Thursday, April 14, 2011, 17:03 John WongEmpty38481-7HP-FEBIADProblems resolvedEvap. bolt/washer problems & solutions Thu Apr 14 14:03:17 2011: 
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7)
 6x 
  16   Monday, April 18, 2011, 18:14 John WongEmpty38295-8HP-FEBIADProblemsSintering target oven coated with TaCMon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb
 pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg 
  17   Wednesday, April 20, 2011, 16:42 John WongEmpty38481-8HP-FEBIADDoneSintering target oven coated with TaCWed Apr 20 16:39:46 2011:  Target
oven was coated with TaC early today. 
The target was allowed to dry and then wrapped
 overall_process.jpg 
  18   Monday, May 09, 2011, 16:10 John WongEmpty38817-1HP-SISDoneDiffusion bonding of Ta FinsMon May  9 16:09:35 2011:  Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down.
 TGHT_ramping_up.gifoverall_process.jpg 
  19   Tuesday, May 10, 2011, 14:58 John WongEmpty38817-2HP-SISDoneDiffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) Tue May 10 14:56:05 2011:  Target
is wrapped with 3 heat-shields.  The
evaporator is pumping down, vac @ 4.72e-6
 starting_process.jpgoverall_process.gif 
  25   Monday, July 18, 2011, 15:55 John WongEmpty38634-3LP-SISDoneSintering TaC coating for UCx#2 Monday, July 18, 2011, 15:53:  Target
oven was coated with TaC and let dry over
the weekend.  The target is now installed
 striptool.jpg 
  27   Wednesday, August 03, 2011, 17:16 John WongEmpty38634-8LP-SISDoneSintering TaC coating Wednesday, August 03, 2011, 20:27 :  Target
was wrapped with 3 new Ta-heat shields and
2 around the back block.  The tar from
 striptool.JPG 
  29   Monday, August 29, 2011, 11:21 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1 Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night.  The target oven is in the evaporator
 TaC_target_oven.JPG 
  30   Tuesday, August 30, 2011, 09:31 Anders MjosEmptyTarget BoatLP-SISDoneSintering of End CapsTuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping
  
  31   Tuesday, August 30, 2011, 16:30 John WongEmptyTarget BoatLP-SISDoneSintering of End Caps


   
        
            
  
  32   Tuesday, September 06, 2011, 17:05 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1


   
        
            
 striptool.JPG 
  33   Wednesday, September 07, 2011, 13:33 John WongEmpty  MaintenanceChanged Evaporator#1 Backing Pump oil Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing
  
  35   Wednesday, September 07, 2011, 15:40 Anders MjosEmpty  MaintenanceRe-sealing of Glove Box2011-09-01:

    Glove box was leaking
(air/argon) between base and box. Light was
  
  36   Friday, September 09, 2011, 10:05 John WongEmpty HP-FEBIADDoneSintering TaC coatingFriday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields.  Chamber
 striptool.JPG 
  37   Monday, September 12, 2011, 13:08 John WongEmptyTarget Boat DoneSintering TaC coating on End CapsMonday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering.  Target
 striptool.JPG 
  39   Wednesday, September 21, 2011, 13:23 John WongEmpty38634-10LP-SISDoneSintering TaC coating on target oven for UCx#3 Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. 
 archiver_TGHT0-580A.JPG 
  40   Thursday, September 22, 2011, 20:34 John WongEmpty38634-9LP-SISDoneSintering TaC coating for UCx#2 (spare) Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down.
  
  46   Thursday, April 05, 2012, 16:47 John WongEmpty38817-3HP-SISDoneCoating target oven /w TaC & sinteringThursday, April 05, 2012, 16:43
Target oven is coated with TaC. 
The oven is wrapped with 3 Ta-heat shields.
 Targetoven_TaCsintered_archive.JPG 
  80   Friday, October 04, 2013, 15:56 John WongEmpty LP-SISDoneIgnore this entry - Process was done in Evap2Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
  