ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
171
|
Tuesday, November 07, 2017, 12:04 |
Laura Lambert | | | | Maintenance | Noise levels checked - ear protection not required. | Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry. |
|
174
|
Wednesday, November 22, 2017, 14:20 |
Laura Lambert | | | | Maintenance | New eye wash for hot lab! | Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout. |
|
212
|
Tuesday, June 26, 2018, 12:12 |
Aaron Schmidt | | | | Problems resolved | Gloves replaced. | Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out.
The original right one was otrn. |
|
233
|
Thursday, March 21, 2019, 09:03 |
Aaron Schmidt | | | | In progress | Evap 1 pump down issue | On Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a |
|
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: |
|
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days |
|
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated |
|
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps) |
|
238
|
Friday, May 24, 2019, 15:25 |
Marla Cervantes | | 43943-1 | | Done | Graphite insert test - FOILS | Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded
with graphite foils was transferred to EVAP1 |
|
250
|
Tuesday, November 05, 2019, 14:50 |
Aaron Schmidt | | | | Maintenance | Fallen Bolt. | One of the TBHT bolts fell out of reach |
|
261
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
260
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
264
|
Tuesday, August 18, 2020, 12:40 |
Aaron Schmidt | | | | | IEVAP:IGP1 swap out | INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: |
|
270
|
Thursday, April 15, 2021, 15:01 |
Marla Cervantes | | | | | IGP1 patch | Thursday, March 31, 2021, 14:42
EVAP1's TGHT has |
|