ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
106
|
Friday, January 23, 2015, 15:02 |
Laura Lambert | | | | Maintenance | water supply turned back on to EVAP1 and fume hoods | Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods |
|
105
|
Thursday, December 11, 2014, 10:17 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays. |
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected |
|
147
|
Tuesday, May 23, 2017, 15:51 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS | Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May |
|
149
|
Friday, May 26, 2017, 15:23 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
6x |
150
|
Friday, May 26, 2017, 16:09 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
151
|
Monday, May 29, 2017, 08:54 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
152
|
Tuesday, May 30, 2017, 07:43 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
148
|
Wednesday, May 24, 2017, 09:34 |
Laura Lambert | | | | Maintenance | VACUUM TRIP OFF SETPOINT CHANGED | Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously |
|
45
|
Tuesday, February 14, 2012, 21:56 |
John Wong | UO2 | 38481-9 | LP-FEBIAD | Done | UO2/Nb sintering process | Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process. |
|
281
|
Wednesday, June 01, 2022, 08:42 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction Provisional ID C211209-1 | Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge |
|
283
|
Tuesday, June 07, 2022, 07:09 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction ID C220510-1 | Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge |
|
247
|
Tuesday, October 08, 2019, 09:53 |
Marla Cervantes | UC2 | 44062-6 | LP-SIS | Done | UCx29 Conditioning | Monday, October 07, 2019, 09:51
A TaC coated target |
|
245
|
Wednesday, October 02, 2019, 11:07 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #5 | Monday, September 30, 2019, 10:54
After being exposed to air for 1.5
hours, |
|
244
|
Friday, September 27, 2019, 18:04 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #4 | Friday, September 27, 2019, 18:03
The target UCx28 that |
|
243
|
Wednesday, September 25, 2019, 14:00 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #3 | Wednesday, September 25, 2019, 14:00
The target UCx28 that |
|
242
|
Tuesday, September 24, 2019, 06:53 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #2 | Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously |
|
241
|
Wednesday, September 18, 2019, 09:57 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #1 | Wednesday, September 18, 2019, 07:48
A TaC coated target container
was loaded with a graphite cartridge with |
|
297
|
Tuesday, January 21, 2025, 07:00 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | In progress | UCx250120 reduction | Tuesday, January 21, 2025, 06:58
Cartridge #24loaded with 234 discs
including 3 analysis discs |
|
296
|
Friday, January 17, 2025, 06:54 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | Done | UCx250115 reduction |
Friday, January 17, 2025, 06:53
Cartridge #23 loaded with 211 discs |
|
|