Thursday, January 23, 2014, 16:29, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating
|
Thursday, January 23, 2014, 16:26
A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield. |
Friday, January 24, 2014, 14:45, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating
|
Laura Lambert wrote:
Thursday, January 23, 2014, 16:26 |
Monday, January 27, 2014, 11:03, Laura Lambert, Empty, 40282-1, TARGET BOAT, Done, Sintering Ta target boat with TaC coating
|
Laura Lambert wrote:
|
Wednesday, February 05, 2014, 14:29, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_01
|
Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40. |
Tuesday, March 04, 2014, 15:48, John Wong, , , TARGET BOAT, In progress, Re-sinterring end caps
|
Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously sinterred in Evap#2 but some surfaces were not fully sinterred. (See Evaporator2 E-log ID119: https://elog.triumf.ca/TIS/Evaporator_2/119)
The endcaps are inserted in a target boat wrapped with 3 heat-shields. |
Wednesday, March 05, 2014, 10:30, Laura Lambert, , , TARGET BOAT, In progress, Re-sinterring end caps
|
John Wong wrote:
Tuesday, March 04, 2014, 15:43 |
Wednesday, March 05, 2014, 23:05, John Wong, , , TARGET BOAT, Done, Re-sinterring end caps
|
Laura Lambert wrote:
|
Monday, March 24, 2014, 17:53, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_02
|
Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March 21 and let dry over the weekend. The cast looks pretty good, and it was rolled up and wrapped in a
piece of graphite sheet. |
Wednesday, May 21, 2014, 11:41, John Wong, UC2, , TARGET BOAT, In progress, Tests: Sintering carbon Mesh coated with UC2
|
Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of carbon mesh coated with UC2. The sample was prepared in the Ar-glove box and the container is wrapped
with 2 layer of Ta foil (it wasn't easy to do the wrapping). |
Friday, July 04, 2014, 10:23, John Wong, ThO2, 40282-2, TARGET BOAT, Done, Test: Sintering ThO2 with Nb backing foils
|
Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. Each sample consists of 5pack ThO2/Nb. (see photos).
The container is wrapped with 3 layers of heat shield. |
Wednesday, July 09, 2014, 13:57, Laura Lambert, ThO2, 40282-2, TARGET BOAT, Done, Test: Sintering ThO2 with Nb backing foils
|
John Wong wrote:
Friday, July 04, 2014, 10:13 |
Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03
|
Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014. |
Tuesday, September 23, 2014, 15:00, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_04
|
Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014. |
Friday, October 10, 2014, 14:00, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_04
|
Laura Lambert wrote:
Tuesday, September 23, 2014, 14:54 |
Monday, January 26, 2015, 11:28, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_05
|
Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.
The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture] |
Monday, March 09, 2015, 16:58, Laura Lambert, Empty, , TARGET BOAT, Maintenance, Testing new software
|
Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program, experienced some issues; therefore, switched to same software as EVAP2.
Testing new software. |
Monday, May 11, 2015, 11:49, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_06
|
Monday, May 11, 2015, 11:45
UO2/C green was prepared May 6, 2015. The slurry was cast on a piece of glass coated with WD40
on May 7, 2015. |
Thursday, July 30, 2015, 17:19, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2_flk_07
|
Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared on July 13, 2015. See screen shot for more info.
The material is loaded into a target boat and wrapped with 3 layers of Ta-heat shield. |
Tuesday, August 11, 2015, 10:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2_flk_07
|
John Wong wrote:
Thursday, July 30, 2015, 17:10 |
Wednesday, August 19, 2015, 11:44, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_08 8x
|
Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug 11, 2015. The slurry was cast on a piece of glass coated with WD40
on Aug 12, 2015. |
|