OLIS Logbook General
  General, Page 4 of 26  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  148   Fri Oct 2 09:38:26 2009 KeerthiRoutineGeneral33Sulfur development completed successfully. 
Sulfur-33
development completed successfully.
  
  149   Fri Oct 2 15:58:36 2009 Keerthi  17O and Ne gases are now connectedA  1e-5 atm.cc/sec of 17O leak and
a 1e-6 atm.cc/sec of neon leak are connected
to the source through center tube of the
  
  150   Sun Oct 4 19:16:46 2009 Keerthi  OLIS statusSupernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5.
  
  152   Tue Oct 6 15:28:31 2009 Keerthi  OLIS A/Q changed to 5 (20Ne+4)Changed OLIS A/Q to 5 (20Ne+4) to satisfy
the CSB and ISAC development changes. 8nA
is sitting at the FC6
  
  153   Wed Oct 7 16:54:33 2009 Keerthi   Today Supernanogan vacuum found to be down in
the morning. Restarted easily.
  
  155   Fri Oct 9 16:33:45 2009 Keerthi  33S developmentSO2 gas line is connected
again. Leak hand valve is closed.
  
  156   Sun Oct 11 13:16:39 2009 Keerthi  MCIS:TP3 was offMCIS TP3 foumd off by 1:00 pm.  Restarted
without a problem
Before TP3 is on MCIS:IG1 is 5.47e-8
  
  157   Sun Oct 11 13:17:37 2009 Keerthi  Neon Leak closedNeon leak close for upcoming 33S development.   
  158   Sun Oct 11 17:09:52 2009 Keerthi  Vacuum with IOS:IV7IOS:IG4 reads 1.25 e-7 Torr and IOS:IG1
reads 9.8e-8 Torr with IOS:IV7 is open
IOS:IG4 reads 8.35 e-8 Torr and IOS:IG1
  
  159   Sun Oct 11 17:11:31 2009 Keerthi  MCIS turbo pumps power levelsMCIS:TP1 = 12W
MCIS:TP2 = 11W
  
  164   Thu Oct 15 21:06:10 2009 Keerthi  OLIS status33S development is completed.  A 3nA
of 33S+5 can be produced with 10W of RF power
and 2.5mm aperture.
  
  230   Thu Mar 11 23:02:18 2010 Keerthi  OLIS status after shutdownMicrowave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
  
  231   Fri Mar 12 11:33:09 2010 Keerthi  IOS:IG!IOS:IG1 is faulty. Need to replac it during
next earliest window.
  
  232   Fri Mar 12 11:35:34 2010 Keerthi  Cusp water coolingCusp source water cooling (#4)  interlick
does not work.
  
  1   Thu May 14 11:07:33 2009 Hossein Rafighi  TestTesting!   
  3   Fri May 15 14:12:45 2009 Geoff Wight  1st testtest   
  2   Thu May 14 12:02:09 2009 Damien GallopRoutineGeneralTesting 2My first OLIS elog entry.   
  4   Thu May 21 16:23:37 2009 Damien GallopRoutineGeneral18O4+/8+ to TUDA-II declared done around noonEnd of run diagnostics done. See ISAC elog.
Supernanogan cart is already installed and
at high vacuum. Prepare to run 17O from Sgan
  
  5   Fri May 22 10:50:06 2009 Damien GallopRoutineGeneralMCIS online with 17O3+ on FC6The previous 18O4+/8+ run to TUDA-II finished
midday yesterday. OLIS was prepared for 17O
delivery from the Supernanogan source. Leak
  
  7   Fri May 22 15:03:55 2009 Damien GallopRoutineGeneralTemporary fix on IOS:TP7Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells
  
ELOG V2.9.2-2455