148
Fri Oct 2 09:38:26 2009
Keerthi
Routine
General
33Sulfur development completed successfully.
Sulfur-33
development completed successfully.
149
Fri Oct 2 15:58:36 2009
Keerthi
17O and Ne gases are now connected
A 1e-5 atm.cc/sec of 17O leak and
a 1e-6 atm.cc/sec of neon leak are connected
to the source through center tube of the
150
Sun Oct 4 19:16:46 2009
Keerthi
OLIS status
Supernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5.
152
Tue Oct 6 15:28:31 2009
Keerthi
OLIS A/Q changed to 5 (20Ne+4)
Changed OLIS A/Q to 5 (20Ne+4) to satisfy
the CSB and ISAC development changes. 8nA
is sitting at the FC6
153
Wed Oct 7 16:54:33 2009
Keerthi
Today Supernanogan vacuum found to be down in
the morning. Restarted easily.
155
Fri Oct 9 16:33:45 2009
Keerthi
33S development
SO2 gas line is connected
again. Leak hand valve is closed.
156
Sun Oct 11 13:16:39 2009
Keerthi
MCIS:TP3 was off
MCIS TP3 foumd off by 1:00 pm. Restarted
without a problem
Before TP3 is on MCIS:IG1 is 5.47e-8
157
Sun Oct 11 13:17:37 2009
Keerthi
Neon Leak closed
Neon leak close for upcoming 33S development.
158
Sun Oct 11 17:09:52 2009
Keerthi
Vacuum with IOS:IV7
IOS:IG4 reads 1.25 e-7 Torr and IOS:IG1
reads 9.8e-8 Torr with IOS:IV7 is open
IOS:IG4 reads 8.35 e-8 Torr and IOS:IG1
159
Sun Oct 11 17:11:31 2009
Keerthi
MCIS turbo pumps power levels
MCIS:TP1 = 12W
MCIS:TP2 = 11W
164
Thu Oct 15 21:06:10 2009
Keerthi
OLIS status
33S development is completed. A 3nA
of 33S+5 can be produced with 10W of RF power
and 2.5mm aperture.
230
Thu Mar 11 23:02:18 2010
Keerthi
OLIS status after shutdown
Microwave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
231
Fri Mar 12 11:33:09 2010
Keerthi
IOS:IG!
IOS:IG1 is faulty. Need to replac it during
next earliest window.
232
Fri Mar 12 11:35:34 2010
Keerthi
Cusp water cooling
Cusp source water cooling (#4) interlick
does not work.
1
Thu May 14 11:07:33 2009
Hossein Rafighi
Test
Testing!
3
Fri May 15 14:12:45 2009
Geoff Wight
1st test
test
2
Thu May 14 12:02:09 2009
Damien Gallop
Routine
General
Testing 2
My first OLIS elog entry.
4
Thu May 21 16:23:37 2009
Damien Gallop
Routine
General
18O4+/8+ to TUDA-II declared done around noon
End of run diagnostics done. See ISAC elog.
Supernanogan cart is already installed and
at high vacuum. Prepare to run 17O from Sgan
5
Fri May 22 10:50:06 2009
Damien Gallop
Routine
General
MCIS online with 17O3+ on FC6
The previous 18O4+/8+ run to TUDA-II finished
midday yesterday. OLIS was prepared for 17O
delivery from the Supernanogan source. Leak
7
Fri May 22 15:03:55 2009
Damien Gallop
Routine
General
Temporary fix on IOS:TP7
Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells