OLIS Logbook General
  General, Page 4 of 26  Not logged in ELOG logo
Entry  Fri Oct 2 09:38:26 2009, Keerthi, Routine, General, 33Sulfur development completed successfully. 
Entry  Fri Oct 2 15:58:36 2009, Keerthi, , , 17O and Ne gases are now connected 
Entry  Sun Oct 4 19:16:46 2009, Keerthi, , , OLIS status 
Entry  Tue Oct 6 15:28:31 2009, Keerthi, , , OLIS A/Q changed to 5 (20Ne+4) 
Entry  Wed Oct 7 16:54:33 2009, Keerthi, , ,  
Entry  Fri Oct 9 16:33:45 2009, Keerthi, , , 33S development 
Entry  Sun Oct 11 13:16:39 2009, Keerthi, , , MCIS:TP3 was off 
Entry  Sun Oct 11 13:17:37 2009, Keerthi, , , Neon Leak closed 
Entry  Sun Oct 11 17:09:52 2009, Keerthi, , , Vacuum with IOS:IV7 
Entry  Sun Oct 11 17:11:31 2009, Keerthi, , , MCIS turbo pumps power levels 
Entry  Thu Oct 15 21:06:10 2009, Keerthi, , , OLIS status 
Entry  Thu Mar 11 23:02:18 2010, Keerthi, , , OLIS status after shutdown 
Entry  Fri Mar 12 11:33:09 2010, Keerthi, , , IOS:IG! 
Entry  Fri Mar 12 11:35:34 2010, Keerthi, , , Cusp water cooling 
Entry  Thu May 14 11:07:33 2009, Hossein Rafighi, , , Test 
Entry  Fri May 15 14:12:45 2009, Geoff Wight, , , 1st test 
Entry  Thu May 14 12:02:09 2009, Damien Gallop, Routine, General, Testing 2 
Entry  Thu May 21 16:23:37 2009, Damien Gallop, Routine, General, 18O4+/8+ to TUDA-II declared done around noon 
Entry  Fri May 22 10:50:06 2009, Damien Gallop, Routine, General, MCIS online with 17O3+ on FC6 
Entry  Fri May 22 15:03:55 2009, Damien Gallop, Routine, General, Temporary fix on IOS:TP7 
ELOG V2.9.2-2455