  501   Thu Nov 13 16:31:54 2014 Brian MinatoOtherOtherSISA new SIS source has been installed. 
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
  
  502   Thu Nov 13 16:34:29 2014 Brian MinatoOtherOtherMCIS UpdateThe ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier.  The Alga had been experiencing
  
  503   Tue Nov 18 08:56:23 2014 Brian MinatoOtherGeneralALGA UpdateThere has been no noticeable loss of communication
to the ALGA 50watt amplifier.  As a
test, the ethernet cable was removed for
  
  504   Wed Nov 19 11:34:55 2014 Raymond DubeRoutineGeneralOLIS Electrical diagram with 3 I.S.I updated
the electrical Diagram  for OLIS Faraday
Cage with 3 Ion Source, ref: ISK4586D rev.
 ISK4586D-rev2.pdf 
  505   Tue Nov 25 07:49:50 2014 Brian MinatoOtherGeneralMCIS and SIS UpdateMCIS-
the Se was loaded into the oven last
friday (21st).  During the weekend the
  
  506   Tue Nov 25 12:23:28 2014 Keerthi JayamannaRoutineGeneral76Se+13 tune saved141125_1159_OLIS_76Se+13.snap is saved
in reference directory.
El=3480/4303V
  
  507   Wed Dec 17 13:17:13 2014 Brian MinatoOtherOtherMCIS UpdateThe MCIS was vented with nitrogen yesterday. 
The Se oven was drawn back into the tuner. 
It was removed with the tuner and blanked.
  
  508   Mon Apr 20 08:09:03 2015 Brian MinatoRoutineGeneralOLIS Shutdown UpdateThe OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
  
  509   Wed Apr 29 07:48:22 2015 Brian MinatoOtherOtherRepair- Water leak inside HV cageA water leak was reported inside the HV
cage (FR#8079).  The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
  
  510   Thu May 21 09:15:48 2015 Brian Minato   Service of MCIS.  Plasma chamber cleaned. 
Repaired shorted, Right steering plate. 
Added shields to help prevent coating of
  
  511   Mon Sep 14 11:21:16 2015 Keerthi JayamannaRoutineGeneral20Ne+2 beam saved20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap   
  512   Wed Feb 22 21:46:27 2017 Keerthi Jayamanna  Elog is working nowElog is now functioning. We can start entering
notes
  
  513   Wed Feb 22 21:51:40 2017 Keerthi Jayamanna  SIS first beam is N1+1Chris confirmed the first SIS beam would